Minutes

Open Portion

Monday, 18 September 2017

AT 5.03 pm

Council Chamber, Town Hall


 

Minutes (Open Portion)

Council Meeting

Page 2

 

18/9/2017

 

 

 ORDER OF BUSINESS

 

PRESENT, APOLOGIES AND LEAVE OF ABSENCE

1.        Confirmation of Minutes. 4

2.        Transfer of Agenda Items. 5

3.        Communication from the Chairman. 5

4.        Notification of Council Workshops. 5

5.        Public Question Time. 5

6.        Petitions. 6

7.        Consideration of Supplementary Items. 7

8.        Indications of Pecuniary and Conflicts of Interest. 7

Reports of Committees. 8

City Planning Committee

9.        Council Acting as Planning Authority. 8

9.1     391 Elizabeth Street, North Hobart - Demolition and New Building for General Retail and Hire, Food Services and Multiple Dwellings. 8

9.2     1 Shepherd Street, 3 Shepherd Street, 3A Shepherd Street, 1 / 3A Shepherd Street, 2 / 3A Shepherd Street, Sandy Bay - Multiple Dwellings. 8

9.3     39 Brushy Creek Road and 270A Lenah Valley Road and 268 Lenah Valley Road and 268B Lenah Valley Road, Lenah Valley - Subdivision (12 Additional Lots) and  Associated Hydraulic Services. 8

9.4     43 Pedder Street, New Town - Partial Demolition, Alterations and Extensions - PLN-17-505. 8

9.5     1 / 63 Salamanca Place, Battery Point and adjacent Road Reserve - Outdoor Dining. 8

10       Hobart Interim Planning Scheme 2015 - Sullivans Cove Planning Scheme 1997 - Royal Hobart Hospital Helipad Airspace - Proposed Amendments. 8

11       European Union World Cities Project - Katowice Poland. 8

Community, Culture and Events Committee

12       Lunar New Year Activities. 8

Governance Committee

13       Hobart not Highrise - Second Petition. 8

14       2016–17 Annual Plan Final Report - Period Ended 30 June 2017. 8

15       By-Laws Review - Public Consultation Outcomes. 8

16       City of Hobart - Draft Customer Service Charter 8

Parks and Recreation Committee

17       Wellington Park Pinnacle - Broadcast Australia - Temporary Transmission Tower 8

18       Healthy Hobart 2017/2018 - Proposed Program.. 8

Special Report – General Manager

19       Australian Local Government Association - National Local Roads & Transport Congress 2017 - Albany, Western Australia - 6 to 8 November 2017 - Aldermanic Nominations. 8

20.     Closed Portion of the Meeting.. 8

 


 

Minutes (Open Portion)

Council Meeting

Page 4

 

18/09/2017

 

 

PRESENT:

 

The Lord Mayor S L Hickey, the Deputy Lord Mayor R G Christie, Aldermen M Zucco,
J R Briscoe, E R Ruzicka, P T Sexton, H C Burnet, P S Cocker, D C Thomas,
T M Denison and W F Harvey. 

 

Alderman Burnet left the meeting at 5.12 pm after declaring an interest in item 9.1 and returned at 5.14 pm.

 

The Deputy Lord Mayor left the meeting at 5.34 pm and returned at 5.37 pm and was not present for item 14.

 

Alderman Burnet was not present at the resumption of the open meeting at 6.38 pm and was not present for item 20.

 

APOLOGIES:

 

Nil.

 

LEAVE OF ABSENCE:

 

Alderman A M Reynolds.

1.       Confirmation of Minutes

 

The Chairman reports that she has perused the minutes of the meeting of the Open Portion of the Council meeting held on Monday, 4 September 2017, finds them to be a true record and recommends that they be taken as read and signed as a correct record.

 

 

 

Christie

Ruzicka                                                                     That the minutes be signed.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

The minutes were signed.

 

 

2.       Transfer of Agenda Items

 

Are there any items, which the meeting believes, should be transferred from this agenda to the closed agenda or from the closed agenda to the open agenda, in accordance with the procedures allowed under Section 15 of the Local Government (Meeting Procedures) Regulations 2015?

 

No items were transferred.

3.       Communication from the Chairman

 

3.1      Gifts from Yaizu

 

The following gifts were presented to the City of Hobart by the Mayor of Yaizu, Mr Hiromichi Nakano when the Council delegation visited Yaizu in August.

·         Painting of Mount Fuji; and

·         Daruma Dolls

 

3.2      Gifts from the Consul General of Japan

 

The Deputy Lord Mayor Alderman Ron Christie received the Consul General of Japan Mr Kazuyoshi Matsunaga on Tuesday 5 September 2017 on behalf of the Lord Mayor.  A gift of a Japanese tea set and Japanese green tea from the Ippodo Tea Company was received.

 

4.       Notification of Council Workshops

 

In accordance with the requirements of the Local Government (Meeting Procedures) Regulations 2015, the General Manager reports that no Council workshops have been conducted since the last ordinary meeting of the Council.

5.       Public Question Time

 

No questions were received.


 

6.       Petitions

 

6.1      Safe Pedestrian crossing at Macquarie Street in the South Hobart village

 

Alderman Ruzicka tabled a petition calling for the Hobart City Council and the State Government to install pedestrian traffic lights across Macquarie Street between the butcher and chemist shops.

There were 148 signatories to the petition.

 

Ruzicka

Burnet

 

That the petition be received, noted and referred to the appropriate committee for consideration.

 

Attachment

a    Petition - Safe Pedestrian Crossing - Macquarie Street, South Hobart

   

 

 

6.2      Girrabong Road Playground - corner of Girrabong and Firth Roads, Lenah Valley

 

The Deputy General Manager tabled a petition calling for the park located at the corner of Girrabong and Firth Roads to be designated as a dog free area.

There were 150 signatories to the petition.

 

Ruzicka

Burnet

 

That the petition be received, noted and referred to the appropriate committee for consideration.

 

 

Attachment

a       Petition - Girrabong Road Playground   

 


 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 

7.       Consideration of Supplementary Items

Ref: Part 2, Regulation 8(6) of the Local Government (Meeting Procedures) Regulations 2015.

RECOMMENDATION

 

That the Council resolve to deal with any supplementary items not appearing on the agenda, as reported by the General Manager in accordance with the provisions of the Local Government (Meeting Procedures) Regulations 2015.

 

No supplementary items were received.

 

 

8.       Indications of Pecuniary and Conflicts of Interest

Ref: Part 2, Regulation 8(7) of the Local Government (Meeting Procedures) Regulations 2015.

 

Aldermen are requested to indicate where they may have any pecuniary or conflicts of interest in respect to any matter appearing on the agenda, or any supplementary item to the agenda, which the committee has resolved to deal with.

 

The following interest was indicated:

 

Alderman Burnet – item 9.1.

 

 Reports of Committees

 

City Planning Committee

 

9.       Council Acting as Planning Authority

 

In accordance with the provisions of Part 2 Regulation 25 of the Local Government (Meeting Procedures) Regulations 2015, the intention of the Council to act as a planning authority pursuant to the Land Use Planning and Approvals Act 1993 is to be noted.

 

In accordance with Regulation 25, the Council will act as a planning authority in respect to those matters appearing under this heading on the agenda, inclusive of any supplementary items.

 

The Council is reminded that in order to comply with Regulation 25(2), the General Manager is to ensure that the reasons for a decision by a Council or Council Committee acting as a planning authority are recorded in the minutes.

 

Alderman Burnet declared an interest in item 9.1 and retired from the meeting.

 

9.1      391 Elizabeth Street, North Hobart - Demolition and New Building for General Retail and Hire, Food Services and Multiple Dwellings

            pln-16-02000 - File Ref: F17/107779

Ref:    Open CP 7.1.2, 11/09/2017

Application Expiry Date: 19 September 2017

Extension of Time: Not applicable

 

Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for Demolition and New Building for General Retail and Hire, Food Services and Multiple Dwellings at 391 Elizabeth Street, North Hobart for the reasons outlined in the officer’s report attached to item 7.1.2 of the Open City Planning Committee agenda of 11 September 2017 and a permit containing the following conditions be issued:

 

GEN

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN-16-00200-01 - 391 ELIZABETH STREET - HOBART - Final Planning Documents except where modified below.

 

Reason for condition

 

To clarify the scope of the permit.

TW

The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2016/00262-HCC dated 09/03/2016 as attached to the permit.

 

Reason for condition

To clarify the scope of the permit.

PLN 15

 

A demolition waste management plan must be implemented throughout demolition.  A demolition waste management plan must be submitted and approved, prior to commencement of work on the site. The demolition waste management plan must include provisions for the handling, transport and disposal of demolition material, including any contaminated waste and recycling opportunities, to satisfy the above requirement.

 

All work required by this condition must be undertaken in accordance with the approved demolition waste management plan.

Advice: Once the demolition waste management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill. Further information can also be found on the Council’s website.

Reason for condition

To ensure that solid waste management from the site meets the Council’s requirements and standards.

PLN 14

 

The noise generated by the operation of the mixed use development must not cause environmental harm when measured at the boundary of the adjacent residential zone.

 

Reason for the condition

 

To ensure noise emissions do not cause environmental harm and do not have an unreasonable impact on residential amenity.

 

PLN 17

 

All external lighting, including security lighting for the building must operate in accordance with Australian Standard AS4282- Control of the Obtrusive Effects of Outdoor Lighting.

Reason for condition

To ensure that the non-residential use does not unreasonably impact residential amenity.

PLN 7

 

The 'Al Fresco' outdoor dining area must not be used after 10:00pm.

 

Reason for condition

 

To reduce the likelihood of any unreasonable impact upon the amenity of nearby residential properties through noise emissions, and to ensure compliance with the non-residential use standards in the Hobart Interim Planning Scheme 2015.

 

PLN s1

 

The walls of the building facing the north-western side boundary (where the site faces the Inner Residential Zone) must be coloured using colours with a light reflectance value not greater than 40 percent.

 

Reason for condition

 

To ensure that building design for non-residential uses contributes positively to the streetscape, the amenity and safety of the public and adjoining land in a residential zone.

PLN s2

 

Additional landscaping and/or planting must be provided.

 

Space for additional landscaping and/or planting features along the Elizabeth Street frontage of the site must be incorporated into the design of the overall development.

 

Drawings demonstrating compliance with this requirement must be submitted and approved, prior to the first occupation of any of the approved uses.

 

All work required by this condition must be undertaken in accordance with the approved drawings.

 

Advice: Once the drawing has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement)

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To enhance the appearance of the site within the local streetscape.

 

ENG sw4

 

Where a new stormwater service connection is required, the new stormwater connection must be constructed at the owner’s expense and all existing connections abandoned and sealed by Council at the owner’s expense, prior to first occupation or commencement of use (whichever occurs first).

Reason for condition

To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.

ENG sw5

 

If a new stormwater service connection is required, an application for a new stormwater service connection must be submitted and approved prior to the issue of a plumbing permit under the Building Act 2016.

Reason for condition

To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.

ENG sw6

 

The development (including all impervious areas) must be drained to Council stormwater infrastructure, prior to first occupation and/or commencement of use (whichever occurs first).

 

Reason for condition

To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.

ENG 7

 

The number of car parking spaces approved on the site is twelve (12) and all vehicular entry/exit from the property is required to be in a forwards direction.  The use of the car parking spaces is restricted to User Classes in accordance with Australian Standards AS/NZS2890.1 2004 Table 1.1 as follows:

 

1.         Five (5) User Class 1A (employee) within the Commercial Car Park; and

2.         Seven (7) User Class 1A (residential) within the Residential Car Park.

All parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white or yellow pavement markers in accordance with Australian Standards AS/NZS2890.1 2004 and/or AS/NZS2890.6: 2009 (including installation of bollard(s)) prior to first occupation or commencement of use (whichever occurs first).

Advice:

1.         It is recommended that the aisle extension in both the Residential and Commercial Car Park is widened by 300mm on each side of the aisle. This would greatly facilitate manoeuvres into and out of parking spaces.

2.         It is recommended that the applicant consults with a building surveyor to determine the disabled parking requirements for the restaurant and retail component of the development. A revised car parking layout to accommodate the disabled parking requirements of the restaurant and retail component of the development may require further planning approvals.

3.         Approval is based upon vehicles undertaking up to three point turning manoeuvres upon exit such that vehicles always exit the property in a forward direction. This is only permitted for User Class 1A parking spaces in accordance with AS2890.1:2004 Table 1.1. None of the car parking spaces are approved for User Class 2 (Building Code of Australia Class 1b or 3 Building).

Reason for condition

To ensure safe and efficient parking adequate to provided for the use.

ENG 8

 

The two parking areas must be provided with lighting in accordance with clause 3.1 “Basis of Design” and clause 3.6 “Car Parks” in AS/NZS 1158.3.1:2005 Lighting for roads and public spaces Part 3.1: Pedestrian Area (Category P) Lighting.

 

Reason for condition

 

To ensure parking and vehicle circulation roadways and pedestrian paths used outside daylight hours are provided with lighting to an acceptable standard.

ENG 10

 

Prior to the issuing of any Completion or Occupancy Certificate under the Building Act 2016, documents signed by a suitably qualified engineer, certifying that the driveway / parking area / manoeuvring area / access / crossover has been constructed in accordance with the approved planning permit drawings, must be lodged with the Council.

Reason for condition

To ensure the safety of users of the access / parking / highway reservation / adjacent properties.

ENG 11

 

Prior to the first occupation or commencement of the use, the redundant crossovers to the Commercial Road and Elizabeth Street highway reservations must be reinstated to match the surrounding kerb and gutter.

 

Prior to first occupation, or commencement, of any of the approved uses (whichever occurs first), the proposed crossovers to the Commercial Road highway reservation must be designed and constructed in general accordance with:

 

1.         Urban - TSD-R09-v1 – Urban Roads Driveways and TSD R14-v1 Type KC vehicular crossing; and

2.         Footpath - Urban Roads Footpaths TSD-R11-v1.

 

Advice

Local Government Association Tasmania (LGAT) Standard Drawings can be viewed electronically via the LGAT website.

The applicant may wish to contact the Council's City Infrastructure Division ((03) 6238 2711) to request a loading zone between the two crossovers. This is through an application process that is separate from the planning application.

Reason for condition

In the interests of vehicle user safety and the amenity of the development.

ENG 1

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

Reason for condition

To ensure that any of the Council infrastructure and/or site-related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

ENG r1

 

The excavation and earth-retaining structures (i.e. embankments, cuttings, retaining walls) supporting the highway reservation must not undermine the stability and integrity of the highway reservation and its infrastructure.

 

Detailed design drawings, structural certificates and associated geotechnical assessments of the private retaining wall(s) adjacent to the Elizabeth Street highway reservation must be submitted and approved, prior to the issuing of any consent under the Building Act 2016 and must:

 

1.         Be prepared and certified by a suitable qualified person and experienced engineer;

2.         Not undermine the stability of the highway reservation;

3.         Be designed in accordance with AS4678, with a design life in accordance with table 3.1 typical application major public infrastructure works;

4.         Take into account any additional surcharge loadings as required by relevant Australian Standards;

5.         Take into account and reference accordingly any geotechnical findings;

6.         Detail any mitigation measures required;

7.         Detail the design and location of the footing adjacent to Elizabeth Street highway reservation;

8.         Include structure certificate which notes the retaining wall(s) will not transfer any loads onto the highway reservation; and

9.         The detailed design drawings and structural certificates should be notated in accordance with the above.

All work required by this condition must be undertaken in accordance with the approved detailed design drawings, structural certificates and associated geotechnical assessments.

Advice:

Once the detailed design drawings, structural certificates and associated geotechnical assessments have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

Reason for condition

To ensure that the stability and integrity of the Council’s highway reservation is not compromised by the development.

ENG s1

 

A total of seven (7) bicycle parking spaces must be provided on site, in accordance with the following:

1.         Two (2) of these must comply with Class A or Class B of AS2890.3:2015 and are to be provided for staff of the mixed-use commercial businesses.

2.         Five (5) of these must comply with Class A or Class B of AS2890.3:2015 and are to be provided for residential use.

Drawings demonstrating compliance with the above requirement must be submitted and approved prior to the first use of any of the approved uses.

All work required by this condition must be undertaken in accordance with the approved drawings.

Advice:

The area north of and adjacent to Residential Car Parking Space R1 would be a suitable location for the five (5) residential bicycle parking spaces.

Once the drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

Reason for condition

To ensure enough bicycle parking is provided to meet the needs of likely users and by so doing to encourage cycling as a healthy and environmentally friendly mode of transport for commuter, shopping and recreational trips

ENV 2

 

Sediment and erosion control measures, in accordance with an approved soil and water management plan (SWMP), must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.

A SWMP must be submitted and approved, prior to the commencement of work or issuing of any Certificate of Likely Compliance under the Building Act 2016 (whichever occurs first). The SWMP must be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008), available here.

All work required by this condition must be undertaken in accordance with the approved SWMP.

Advice: Once the SWMP has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

Reason for condition

To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.

ENV s1

All external windows of the dwellings must be double-glazed.

 

Reason for condition

To ensure the new sensitive uses do not conflict with, interfere with or constrain an existing use with the potential to cause environmental harm.

ENV s2

 

The external walls of the dwellings must be designed and constructed to minimise external noise intrusion.

 

Drawings detailing the proposed design of the external walls of the dwellings, including features to minimise external noise intrusion, must be submitted and approved, prior to the commencement of works.

All work required by this condition must be undertaken in accordance with the approved drawings.

Advice: Once the drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

Reason for condition

To ensure the new sensitive uses do not conflict with, interfere with or constrain an existing use with the potential to cause environmental harm

ENVHE s1

 

The site must be sealed to minimise risk from site contamination to future site users.

Prior to the issue of the Certificate of Occupancy and/or Certificate of Completion for Building Works (whichever is issued first), a suitably qualified person must provide written certification to the Council that the site has been suitably sealed.

Reason for condition

To demonstrate all mitigation measures have been undertaken to ensure the site is safe for the proposed use prior to the commencement of use occurring.

Part 5 r1

 

The owner(s) of the property must enter into a Part 5 Agreement with the Council pursuant to the Land Use Planning and Approvals Act 1993 with respect to the protection of the structural integrity of the highway reservation (via private retaining wall(s) adjacent to the Elizabeth Street highway reservation) prior to the commencement of work.

 

The owner must not undertake any works at any time (including demolition, excavation and construction) that will have any effect on the structural integrity of the Elizabeth Street highway reservation, any retaining structure adjacent to Elizabeth Street highway reservation, or the road formation itself.

 

All costs for the preparation and registration of the Part 5 Agreement must be met by the owner.

 

The owner must comply with the Part 5 Agreement which will be placed on the property title.

 

Advice

 

Please contact Council's Senior Development Engineer ((03) 6238 2715) to start the Part 5 Agreement process.

 

Where building approval is also required, it is recommended that the Part 5 Agreement process be started well before submitting documentation for building approval. Failure to start the Part 5 Agreement process prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure the protection of Council Highway Infrastructure.

 

ADVICE

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by-laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

CONDITION ENDORSEMENT

 

If a condition endorsement is required by a planning condition above, you will need to submit the relevant documentation to satisfy the condition via the Condition Endorsement Submission on Council's online services e-planning

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

Once approved, the Council will respond to you via email that the condition has been endorsed (satisfied). Detailed instructions can be found here.

BUILDING PERMIT

 

Building permit in accordance with the Building Act 2016. Click here for more information. 

PLUMBING PERMIT

 

Plumbing permit in accordance with the Building Act 2016Building Regulations 2016 and the National Construction Code. Click here for more information.

 

SPECIAL CONNECTION PERMIT

 

Special Connection Permit (Trade Waste) in accordance with the Plumbing Regulations 2014 and the Tasmanian Plumbing Code. Click here for more information. 

 

OCCUPATION OF THE PUBLIC HIGHWAY

 

Permit for the occupation of the public highway for construction or special event (e.g. placement of skip bin, crane, scissor lift etc). Click here for more information.

 

Occupational licence for use of Hobart City Council highway reservation (outdoor seating, etc). Click here for more information.

 

Occupational license for structures in the Hobart City Council highway reservation, in accordance with conditions to be established by the Council. Click here for more information.

 

Road closure permits for construction or special event. Click here for more information.

 

Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information.

 

NEW SERVICE CONNECTION

 

New service connection (please contact the Hobart City Council's City Infrastructure Division to initiate the application process).

 

STORMWATER

 

Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information. 

 

WORK WITHIN THE HIGHWAY RESERVATION

 

Please note development must be in accordance with the Hobart City Council’s Highways By law. Click here for more information. 

DRIVEWAY SURFACING OVER HIGHWAY RESERVATION

 

If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future.

 

REDUNDANT CROSSOVERS

 

Redundant crossovers are required to be reinstated under the Hobart City Council’s Highways By law. Click here for more information. 

 

ACCESS

 

Designed in accordance with LGAT- IPWEA – Tasmanian standard drawings. Click here for more information.

 

CROSS OVER CONSTRUCTION

The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design. Click here for more information. 

STORMWATER / ROADS / ACCESS

 

Services to be designed and constructed in accordance with the (IPWEA) LGAT- – standard drawings. Click here for more information. 

 

WEED CONTROL

 

Effective measures are detailed in the Tasmanian Washdown Guidelines for Weed and Disease Control: Machinery, Vehicles and Equipment (Edition 1, 2004). The guidelines can be obtained from the Department of Primary Industries, Parks, Water and Environment website.

WASTE DISPOSAL

 

It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill.

Further information regarding waste disposal can also be found on the Council’s website.

FEES AND CHARGES

 

Click here for information on the Council's fees and charges.

 

DIAL BEFORE YOU DIG

 

Click here for dial before you dig information. 

 

BICYCLE AND MOTORCYCLE PARKING

 

Consideration should be given to the provision of additional on-site bicycle and motorcycle parking facilities for customers of the proposed commercial uses. Any inclusion of such facilities should be discussed with the Council's Senior Development Engineer (03) 6238 2715) prior to the submission of plans for building approval.

 

 

 

Briscoe

Ruzicka                                                          That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 

 

9.2      1 Shepherd Street, 3 Shepherd Street, 3A Shepherd Street, 1 / 3A Shepherd Street, 2 / 3A Shepherd Street, Sandy Bay - Multiple Dwellings

            PLN-16-1022 - File Ref: F17/108004

Ref:    Open CP 7.1.3, 11/09/2017

Application Expiry Date: 11 October 2017

Extension of Time: Not applicable

 

PART A

Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for Multiple Dwellings at 1 Shepherd Street, 3 Shepherd Street, 3A Shepherd Street, 1 / 3A Shepherd Street, 2 / 3A Shepherd Street, Sandy Bay for the reasons outlined in the officer’s report attached to item 7.1.3 of the Open City Planning agenda of 11 September 2017 and a permit containing the following conditions be issued:

 

GEN

 

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­16­1022 ­ 1 SHEPHERD STREET SANDY BAY TAS 7005 ­ Final Planning Documents except where modified below.

 

Reason for condition

 

 

To clarify the scope of the permit.

 

TW

 

The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWD 2016/01418­HCC dated 16/06/2017 as attached to the permit.

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

ENG sw2

 

 

A pre CCTV video of the existing Council stormwater main that traverses the subject property and is located within two metres of the proposed works must be undertaken and submitted to Council prior to the commencement of work.

 

The post construction CCTV will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council pre construction CCTV video of the Council’s infrastructure, then any damage to the Council infrastructure identified in the post construction CCTV will be deemed to be the responsibility of the owner.

 

Advice:

 

 

Due to the diameter of the main, a tractor camera will be required to obtain adequately clear footage.

 

 

Once the pre CCTV video has been submitted and accepted by Council then a condition endorsement will be issues (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENG sw2.1

 

A post CCTV video of the existing Council stormwater main that traverses the subject property and is located within two metres of the proposed works must be undertaken and submitted to Council upon completion of all works.

 

 

The post construction CCTV will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council pre construction CCTV video of the Council’s infrastructure, then any damage to the Council infrastructure identified in the post construction CCTV will be deemed to be the responsibility of the owner.

 

Advice:

 

 

Due to the diameter of the main, a tractor camera will be required to obtain adequately clear footage.

 

 

Once the post CCTV video has been submitted and accepted by Council then a condition endorsement will be issued (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

 

ENG sw3

 

The proposed works must be designed to ensure the protection of and access to the Council’s storm water main. Any proposed foundations including retaining wall footings to be located within two metres of Council infrastructure (measured horizontally to the nearest external surface of the pipe) must be clear of the Council's stormwater main, and be designed such that no additional loads are imposed on the stormwater main.

 

 

Detailed design drawings must be submitted and approved prior to commencement of construction. The detailed design drawings must:

 

 

1.       Demonstrate how the design will ensure the protection of and provide access to the Council’s stormwater main. (See advice section of permit.)

2.       Include cross­sections clearly showing the relationship both vertically and horizontally between the Council's stormwater infrastructure and the proposed works (including footings), and stating the minimum setbacks from the works to the nearest external surface of the main.

3.       Be certified by a suitably qualified engineer.

 

All work required by this condition must be undertaken in accordance with the approved detailed design drawings.

 

Advice:

 

 

Once the detailed design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure the protection of the Council’s hydraulic infrastructure.

 

ENG sw4

 

Any new or upgrading of existing storm water connections must be constructed and any redundant stormwater connections must be sealed by the Council at the owner’s expense, prior to the first occupation.

 

 

Detailed engineering drawings must be submitted and approved, prior to commencement of work. The detailed engineering drawings must include:

 

 

1.      The location of the new or upgraded connection; and

2.      The size of the connection appropriate to satisfy the needs of the development.

 

 

All work required by this condition must be undertaken in accordance with the approved detailed engineering drawings.

 

 

Advice: Once the detailed engineered drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

 

Please note that once the condition endorsement has been issued you will need to contact Council’s City Infrastructure Unit to initiate an application for service connection.

 

 

Reason for condition

 

 

To ensure the site is drained adequately.

 

 

ENG sw5

 

 

The Council stormwater mains must be carefully and accurately located onsite via hand excavated test holes.

 

 

Prior to construction of the footings, the exposed stormwater main and clearance from the footing set­out must be inspected and confirmed by the Council's Project and Development Inspector to ensure the minimum separation distances are achieved.

 

 

Advice: The Council's Project and Development Inspector, must be contacted on (03) 6238 2967 at least twenty four hours prior to the commencement of any works. Once verification has been obtained, Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

To ensure the protection of the Council’s infrastructure.

 

ENG 2

 

Vehicle crash barriers compliant with the Australian/New Zealand Standard AS/ NZS 1170.1 must be installed prior to the first occupation where the fill batter slope from the edge of the driveway/parking area is greater (steeper) than 1 vertical in 4 horizontal.

 

A certified design/report prepared by a suitably qualified engineer, to satisfy the above requirements, must be provided to the Council prior to commencement of work.

 

All works, required by this condition must be undertaken in accordance with certified design/report. Upon completion the barriers must be inspected by a qualified engineer and a certification submitted to the Council, confirming that the installed barriers comply with the above requirement.

 

Advice: Once the engineer certified design/report has been approved, the Council will issue a condition endorsement with regard to the vehicle crash barrier design. Upon completion of the works and following submission of the engineers certification, the Council will issue a condition endorsement with regard to the completed vehicle crash barrier construction (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To ensure that the safety of users of the driveway/parking and compliance with the standard.

 

 

ENG 4

 

 

The driveway and car parking area approved by this permit must be constructed to a sealed standard and surface drained prior to the first occupation.

 

Reason for condition

 

To ensure safe access is provided for the use.

 

 

ENG 1

 

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENV 1

 

Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site. Sediment controls must be maintained until all areas of disturbance have been stabilized or re­vegetated.

 

Advice: For further guidance in preparing a Soil and Water Management Plan – in accordance with Fact sheet 3 Derwent Estuary Program click here.

 

Reason for condition

 

 

To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State legislation.

 

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

 

CONDITION ENDORSEMENT

 

 

If a condition endorsement is required by a planning condition above, you will need to submit the relevant documentation to satisfy the condition via the Condition Endorsement Submission on Council's online services e­planning

 

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

 

Once approved, the Council will respond to you via email that the condition has been endorsed (satisfied). Detailed instructions can be found here.

 

 

BUILDING AND PLUMBING PERMIT

 

 

Building and plumbing permit in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.

 

 

TEMPORARY PARKING PERMITS

 

 

General Exemption permits for construction vehicles i.e. residential or meter parking/loading zones. Click here for more information.

 

 

NEW SERVICE CONNECTION

 

 

New service connection (please contact the Hobart City Council's City Infrastructure Division to initiate the application process, (03) 6238 2711).

 

 

STORMWATER

 

 

Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information.

 

 

STRUCTURES CLOSE TO COUNCIL'S STORMWATER MAIN

 

 

The design of structures (including footings) must provide protection for the Council’s infrastructure. For information regarding appropriate designs please contact the Council's City Infrastructure Division.

 

 

STORM WATER / ROADS / ACCESS

 

 

Services to be designed and constructed in accordance with the (IPWEA) LGAT– standard drawings. Click here for more information.

 

RIGHT OF WAY

 

The private right of way must not be reduced, restricted or impeded in any way, and all beneficiaries must have complete and unrestricted access at all times.

 

You should inform yourself as to your rights and responsibilities in respect to the private right of way particularly reducing, restricting or impeding the right during and after construction.

 

WEED CONTROL

 

Effective measures are detailed in the Tasmanian Washdown Guidelines for Weed and Disease Control: Machinery, Vehicles and Equipment (Edition 1, 2004). The guidelines can be obtained from the Department of Primary Industries, Parks, Water and Environment website.

 

 

NOISE REGULATIONS

 

 

Click here for information with respect to noise nuisances in residential areas.

 

 

FEES AND CHARGES

 

 

Click here for information on the Council's fees and charges.

 

 

DIAL BEFORE YOU DIG

 

 

Click here for dial before you dig information.

 

PART B

That the management of parking and rubbish collection in relation to Shepherd Street in the vicinity of this development be referred onto the City Infrastructure Committee for review and further investigation.

 

 

 

Briscoe

denison                                                That the recommendation be adopted.

 

Procedural Motion

 

Thomas

Ruzicka                                                                                                                      

 

 

That the matter be deferred to allow discussions to take place between the applicant and representors to mitigate representor concerns.

 


 

 

PROCEDURAL MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 

 

9.3      39 Brushy Creek Road and 270A Lenah Valley Road and 268 Lenah Valley Road and 268B Lenah Valley Road, Lenah Valley - Subdivision (12 Additional Lots) and  Associated Hydraulic Services

            pln-17-198 - File Ref: F17/109069

Ref:    Open CP 7.1.6, 11/09/2017

Application Expiry Date: 19 September 2017

Extension of Time: Not applicable

 

Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for subdivision (12 additional lots) and associated hydraulic services at 39 Brushy Creek Road and 268A, 268B, and 270A Lenah Valley Road for the reasons outlined in the officer’s report attached to supplementary item 7.1.6 of the Open City Planning agenda of 11 September 2017 and a permit containing the following conditions be issued:

 

GEN

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­17­198 ­ 39 BRUSHY CREEK ROAD LENAH VALLEY ­ Final Planning Documents except where modified below.

 

Reason for condition

 

To clarify the scope of the permit.

 

 

TW

 

The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2017/00407-HCC dated 8 September 2017 as attached to the permit. 

Reason for condition

To clarify the scope of the permit.

 

Reason for condition

 

To clarify the scope of the permit.

 

ENG sw3

 

The proposed works (including footings) must be designed to ensure the long term protection accessibility of the proposed public stormwater infrastructure (main).

 

Detailed engineering design drawings must be submitted and approved prior to commencement of works.

 

The detailed engineering design drawings must:

 

1.         Demonstrate how the design will accommodate future maintenance/replacement of the main, not impede overland flow and impose no loads onto the main and that the structure will be fully independent of the main and its trenching.

 

2.         Include cross­sections clearly showing the relationship both vertically and horizontally between the main and the proposed works (including footings), and stating the minimum setbacks from the works to the nearest external surface of the main.

 

3.         Include a long­section of the main clearly showing proposed cover. If the cover is less than 600mm, engineering details and full calculations to relevant Australian standards (including construction traffic loading) must be submitted to demonstrate the mains can withstand the likely forces and will be adequately protected. All assumptions must be stated.

 

4.         Be certified by a suitably qualified engineer.

 

Prior to sealing of final plan, a suitably qualified engineer must confirm the installation of the works within two metres of the main is in accordance with the approved drawings and complies with this condition. Should any remediation works be required, these must be carried out at the developer’s cost.

 

All work required by this condition must be undertaken in accordance with the approved detailed engineering design drawings.

 

Advice:

 

Once the detailed engineering design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure the protection of the Council’s hydraulic infrastructure.

 

ENG sw4

 

The developer is responsible for the cost for the construction of a stormwater drainage system, sized to accommodate the 1 in 100 AEP flow based on flows from the current catchment conditions and the future fully­developed subdivision.

 

If a larger system is required to accommodate the future fully developed catchment due to limited access to a legal point of discharge or more efficient lifecycle costing, then the Council will pay the additional cost.

 

The actual apportionment of these costs is to be agreed on by both the Council and the developer prior to the commencement of construction works for the stormwater drainage system.

 

Reason for condition

 

To ensure a fair allocation of costs for the construction of the stormwater drainage system.

 

ENG sw5

 

The new stormwater system must be constructed prior to the sealing of the final plan.

 

Engineering design drawings must be submitted and approved, prior to commencement of work. The engineering drawings must:

 

1.         Be certified by a qualified and experienced engineer.

 

2.         Show in both plan and long­section the proposed stormwater mains, including but not limited to, connections, flows, velocities, hydraulic grade lines, clearances, cover, gradients, sizing, material, pipe class, adequate working platforms around manholes, easements and inspection openings.

 

3.         Include the associated calculations and catchment area plans. The stormwater system (including defined overland flow paths) must cater for all 1% AEP flows as at 2100 (i.e. including climate change loading) from a fully developed catchment. The main itself must be sized to accommodate at least the 5% AEP flows from a fully­developed catchment.

 

4.         Provide sufficient detail that demonstrates the overland flow is contained and safely conveyed within the defined overland flow path, taking into consideration flow velocities.

 

5.         Include a maintenance plan for all required measures, including clear design drawings and inspection frequencies.

 

6          Demonstrate that outfall erosion, scouring and hydraulic intrusion are minimised.

 

7.         Clearly distinguish between public and private infrastructure.

 

8.         Be substantially in accordance with the LGAT Standard Drawings and Tasmanian Subdivision Guidelines.

 

All work required by this condition must be undertaken in accordance with the approved engineering design drawings.

 

Advice:

 

Once the engineering design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Please note that once the condition endorsement has been issued you will need to contact Council’s City Infrastructure Division to obtain a Permit to Construct Public Infrastructure.

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure Council’s hydraulic infrastructure meets acceptable standards.

 

ENG 2

 

Vehicle crash barriers compliant with the Australian/New Zealand Standard AS / NZS 1170.1 must be installed where required for the driveway access(s), prior to the sealing of the final plan.

 

A certified design/report prepared by a suitably qualified engineer, to satisfy the above requirements, must be provided to the Council prior to

the commencement of work.

 

All works, required by this condition must be undertaken in accordance with certified design/report. Upon completion the barriers must be inspected by a qualified engineer and a certification submitted to the Council, confirming that the installed barriers comply with the above requirement.

 

Advice:

 

Vehicular safety barriers where the drop from a driveway/access to a lower level exceeds 600mm and a wheel stop (i.e. kerb 90 110mm high) where the drop is less than 600mm but exceeds 150mm in accordance with AS/NZS 2890.1:2004 Section 2.4.5.3. Please indicate on your drawings the height of the drop from the driveway / parking area / turning area and show on the drawings where vehicular safety barriers / wheel stops are required and that they will be designed in accordance with AS/NZS 1170.1:2002. Council do not consider a slope greater than 1 in 4 to constitute a lower level as described in AS/NZS 2890.1:2004 Section

2.4.5.3.

 

Reason for condition

 

To ensure that the safety of users of the driveway/parking and compliance with the standard.

 

ENG 4

 

The driveways approved by this permit must be constructed to a sealed standard and surface drained prior to the sealing of the final plan. The driveways must be constructed and sealed to provide practical access for vehicles into the body of each lot, including internal lots where access is subject to a right of way.

 

Reason for condition

 

To ensure safe access is provided for the use.

 

ENG 14

 

Parking, access and turning areas must be generally designed and constructed in accordance with the Australian Standard Parking facilities, Part 1: Off­Street Carparking, AS 2890.1 2004, prior to the first occupation.

 

Design drawings must be submitted and approved, prior to commencement of work. The design drawings must:

 

1.         Show dimensions, levels and gradients, transitions and other details as necessary to satisfy the above requirement.

 

2.         Provide exact location of the vehicular access at each individual lot.

 

3.         Provide one vehicular access to service lots 4, 5, 6 and 7.

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

Advice:

 

Once the design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that the access and parking layout for the development is to accepted standards.

 

ENG 1

 

The cost of repair of any damage to the Council's infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the

Council. Any damage must be immediately reported to the Council.

 

Prior to the Council issuing approved engineering drawings or the commencement of work onsite (whichever occurs first), a dilapidation report for road infrastructure which will be directly impacted by the construction of the development must submitted to the Council. The dilapidation report must include photographs of any pre­existing damage, and must include Brushy Creek and Lenah Valley Roads.

 

In addition, a photographic record of the Council's infrastructure adjacent to the subject site must be submitted to the Council prior to the commencement of works.

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails

to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

Reason for condition

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENG r1

 

All retaining structures and embankments within or supporting the highway reservation must not undermine the stability and integrity of the highway reservation and its infrastructure.

 

Detailed design drawings, structural certificates and associated geotechnical assessments of the proposed the retaining structures and embankments supporting or within the highway reservation must be submitted and approved, prior to the commencement of work and must:

 

1.         Be prepared and certified by a suitably qualified person and experienced engineer.

 

2          Demonstrate that the stability of the highway reservation will not be undermined.

 

3.         Be designed in accordance with AS4678, with a design life in accordance with Table 3.1, typical application major public infrastructure works.

 

4.         Take into account any additional surcharge loadings as required by relevant Australian Standards.

 

5.         Take into account and reference accordingly any geotechnical findings

 

6.         Detail the design and location of the footing adjacent and/or within the proposed highway reservation.

 

7.         Be notated in accordance with the above.

 

All work required by this condition must be undertaken in accordance with the approved detailed design drawings, structural certificates and associated geotechnical assessments.

 

Advice:

 

Once the detailed design drawings, structural certificates and associated geotechnical assessments have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that the stability and integrity of the Council’s highway reservation is not compromised by the development.

 

ENGR 3

 

Prior to the sealing of the final plan, the proposed driveway crossover(s) must be designed and constructed in accordance with the following relevant standards:

 

1.         Urban ­ TSD­R09­v1 Urban Roads Driveways and TSD R14­v1 Type KC vehicular crossing;

2.         Footpath ­ Urban Roads Footpaths TSD­R11­v1; and

3.         Australian Standard 2890.

 

Design drawings must be submitted and approved prior to the commencement of work. The design drawings must:

 

1.         Show the cross and long section of the driveway crossover within the highway reservation and onto each of the properties.

 

2.         Detail any services or infrastructure (i.e. light poles, pits, awnings) at or near the proposed driveway crossover.

 

3.         Show swept path for a B85 vehicle in accordance with AS/NZS 2890.1 2004.

 

4.         If the design deviates from the requirements of the Tasmanian Standard Drawings then the drawings must demonstrate that a B85 vehicle or B99 depending on use (AS/NZS 2890.1 2004, section 2.6.2) can access the driveway from the road pavement into the property without scraping the vehicle's underside.

 

5.         Show that vehicular and pedestrian sight lines are met as per AS/NZS 2890.1 2004.

 

6.         Be prepared and certified by a suitable qualified person, to satisfy the above requirement.

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

Advice:

 

Once the approved design drawings have been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that works will comply with the Council’s standard requirements.

 

ENGR 4

 

Vehicle crash barriers within the highway reservation compliant with the Australian/New Zealand Standard AS / NZS 1170.1 and/or the (IPWEA) LGAT Tasmanian Standard Drawings must be installed or modified as per the plans prior to the sealing of the final plan.

 

A certified design/report prepared by a suitably qualified Engineer, to satisfy the above requirements, must be provided to the Council prior to the commencement of work.

 

All works, required by this condition must be undertaken in accordance with certified design/report. Upon completion the barriers must be inspected by a qualified engineer and a certification submitted to the Council, confirming that the installed barriers comply with the above requirement.

 

Reason for condition

 

To ensure that the safety of users of the driveway/parking and compliance with the standard.

 

ENG s1

 

Passing bays must be installed along the length of the shared driveway for lots 4, 5, 6 and 7.

 

The vehicle passing bays must:

 

1.         Be 6m long, 5.5m wide, and taper to the width of the driveway;

 

2.         Have the first passing bay constructed at the kerb; and

 

3.         Be at intervals of no more than 30m along the access.

 

Design drawings must be submitted and approved prior to the commencement of work, demonstrating compliance with the above requirements.

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

Advice:

 

Once the approved design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that: (a) the design and location of access and parking areas creates a safe environment for users by minimising the potential for conflicts involving vehicles, pedestrians and cyclists; and (b) use or development does not adversely impact on the safety or efficiency of the road network as a result of delayed turning movements into a site.

 

ENV 2

 

Sediment and erosion control measures sufficient to prevent sediment leaving the site and in accordance with an approved soil and water management plan (SWMP) must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.

 

A SWMP must be submitted and approved, prior to the commencement of work. The SWMP must be prepared in accordance with the:

 

1.         Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008), available here.

 

2.         Wetlands and Waterways Works Manual (DPIWE, 2003), available here.

 

All work required by this condition must be undertaken in accordance with this condition and the approved SWMP.

 

Advice:

 

Once the SWMP has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.

 

ENV 3

 

Prior to commencement of works and prior to sealing of the final plan, an amended bushfire hazard management plan, bushfire report and certificate of compliance must be submitted and approved.

 

The bushfire hazard management plan dated 20 June 2017 must be amended to:

 

1.         Not show the indicative 10m by 15m building areas;

 

2.         Include an amended note 2 that is consistent with the notation on the plan relating to the shared driveway serving lots 4 to

 

3.         Clarify and clearly show the extent of required hazard management areas (particularly for lots 1, 6 and 7);

 

4.         Include specific hazard management area prescriptions for lots 1, 6 and 7 that ensure no impact on existing significant native vegetation or existing vegetation within the waterway protection area; and

 

5.         Show the no build area and fire trail as shown on subdivision plan.

 

The bushfire report dated 20 June 2017 must be amended to:

 

1.         Show the final subdivision layout as shown on the subdivision plan dated 17028 dated 30 June 2017 in images 7 and 14;

 

2.         Clarify and clearly show the extent of required hazard management areas (particularly for lots 1, 6 and 7); and

 

3.         Include specific hazard management area prescriptions for lots 1, 6 and 7 that ensure no impact upon existing significant native vegetation or existing vegetation within the waterway protection area.

 

The amended certificate of compliance must refer to the amended bushfire report and bushfire hazard management plan and include a correct description of the development in section 2 of the certificate.

 

Reason for condition

 

To reduce the risk to life and property, and the cost to the community, caused by bushfires

 

ENV 4

 

The final approved bushfire hazard management plan (BHMP) must be implemented prior to occupation of the first new habitable building on lots 2 to 14, and must be maintained for the life of all habitable buildings on these lots.

 

Compliance with the BHMP for future lot owners must also be required via a Part 5 Agreement pursuant to section 71 of the Land Use Planning and Approvals Act 1993. The Agreement must be registered on the Titles of all lots at the time of issue. The Agreement must require the BHMP to be implemented prior to occupation of the first new habitable building on lots 2 to 14, and must be maintained for the life of all habitable buildings on these lots

 

The planning authority will have its solicitors prepare the Agreement for signing by property owner(s). The planning authority will then lodge the Agreement with the Lands Titles Office. The cost of preparing the Agreement and registration with the Land Titles Office is to be met by the applicant.

 

Reason for condition

 

To reduce the risk to life and property, and the cost to the community, caused by bushfires

 

ENV s1

 

Prior to the commencement of works, a Construction Environmental

Management Plan must be submitted and approved.

 

The Construction Environmental Management Plan must:

 

1.         Detail the proposed construction methodology, particularly with regard to ground disturbance and vegetation clearing; and

 

2.         Include measures (including timing and duration) to avoid or mitigate risks associated with erosion and sedimentation (including the potential presence of dispersive soils), the spread of weeds (including any imported soil and vehicle hygiene) and the risk of contamination of any imported soil.

 

All work required by this condition must be undertaken in accordance with the approved Construction Environmental Management Plan.

 

Advice:

 

Once the approved Construction Environmental Management Plan has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for Condition

 

To minimise the potential for environmental impacts from the construction works

 

OPS s1

 

In accordance with Section 117 of the Local Government (Building and Miscellaneous Provisions) Act 1993 and prior to the sealing of the final plan, the boundary of Lot 6 (Public Open Space) must be amended to remove the strip between Lots 5 and 7, and be replaced with a right of way in favour of the Council (similar to that approved for access to Lots 4, 5 and 7).

 

Advice: The final area and configuration of Lot 6 (Public Open Space) is to be approved by the Council's Director Parks and City Amenity prior to sealing of the final plan.

 

Reason for condition

 

The amendment is necessary to provide a regular lot boundary, and to ensure a more effective use of public open space contributions.

 

OPS s2

 

Prior to the sealing of the final plan, the boundary of Lot 6 (Public Open Space) must be amended to include the riparian land on the western side of Brushy Creek along the length of Lot 7, between the existing fence and Brushy Creek.

 

Advice: The final area and configuration of Lot 6 (Public Open Space) is to be approved by the Council's Director Parks and City Amenity prior to sealing of the final plan.

 

Reason for condition

 

The land is required for riparian management, and will not be developed for recreational track purposes.

 

SURV 1

 

The applicant must submit to the Council a copy of the surveyor’s survey notes at the time of lodging the final plan.

 

Reason for condition

 

To enable the Council to accurately update cadastral layers on the corporate

Geographic Information System.

 

SURV 3

 

The final plan and schedule of easements must be submitted and approved under section 89 of the Local Government (Building & Miscellaneous Provisions) Act 1993.

 

The final plan and schedule of easements must provide easements:

 

1.         Over any proposed or existing stormwater, water or sewer mains passing through the lots on the final plan, in favour of the Hobart City Council and/orTasWater.

 

2.         Over any overland flow paths through the lots on the final plan in favour of the Hobart City Council.

 

3.         Extending through proposed Lot 11, along the eastern boundary to 41 Brushy Creek Road.

 

4.         Over any existing or proposed private rights of way, drainage and/or service easements in favour of the lots they are required to serve.

 

5.         Over any existing, proposed or required road embankment or road batters in favour of the Hobart City Council.

 

Reason for condition

 

To ensure that there are no impediments to the provision of public and private services and access to the lots; and for the efficient provision of stormwater drainage, and to ensure that the subdivision/boundary adjustment is carried out in accordance with the Council's requirements under the provisions of Part 3 of the Local Government (Building & Miscellaneous Provisions) Act 1993.

 

SURV 5

 

The proposed or required Road, Footway and Public Open Space lots are to be transferred in fee simple to the Council at nominal consideration.

 

Prior to the sealing of the final plan an executed and stamp duty assessed Land Titles Office transfer instrument is to be forwarded to the Council together with a cheque made payable to the Land Titles Office for the associated Land Titles Office registration fees.

 

Reason for condition

 

To ensure that titles to the proposed road, footway and public open space lots issue in the Council.

 

SURV 12

 

Lots 5 and 8 on the final plan are to be notated in accordance with the provisions of section 83(5)(a)(ii) of the Local Government (Building and Miscellaneous Provisions) Act 1993, to the effect that the Hobart City Council cannot provide a means of gravity reticulated stormwater disposal from lots 5 and 8 below a specified reduced level.

 

The final plan must be submitted and approved. The final plan must be notated in accordance with the above requirement.

 

Any specified reduced level that may be required is to be provided by the owner’s Registered Land Surveyor, who must supply the invert level (on State Datum) of the stormwater connection constructed to serve Lot 5.

 

Reason for condition

 

To ensure that the restriction in the Council’s ability to provide a means of gravity reticulated stormwater disposal is noted on the final plan.

 

SURV 13

 

The final plan is to be notated in accordance with the provisions of section

83(7)(b) of the Local Government (Building and Miscellaneous Provisions) Act

1993 to the effect that the Tasmanian Water and Sewerage Corporation cannot provide a means of gravity reticulated sewerage disposal from lot 5 and 8 below a specified reduced level.

 

The final plan must be submitted and approved, and must be notated in accordance with the above.

 

The specified reduced level that may be required is to be provided by the owner’s Registered Land Surveyor who must supply the invert level (on State Datum) of the sewer connection constructed to serve Lot 5.

 

Reason for condition

 

To ensure that the limitation in TasWater’s ability to provide a means of gravity reticulated sewerage disposal from is noted on the final plan.

 

ENG15

 

Services to each lot must be designed and installed to meet the needs of future development, prior to the sealing of the final plan.

 

Engineering drawings must be submitted and approved prior to commencement of work on the site. The engineering drawings must:

 

1.         Be prepared by a suitably qualified and experienced engineer;

 

2.         Be generally in accordance with LGAT ­ IPWEA ­Tasmanian Standard Drawings and Subdivision Guidelines 2013;

 

3.         Specify lot connection sizes appropriate for the developable area of each lot.

 

4.         Show the proposed location of each lot connection such that the majority of the lot, including the driveway, can be adequately and economically drained.

 

All work required by this condition must be constructed in accordance with the approved engineering drawings.

 

Advice:

 

Once the approved engineering drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Please note that once the condition endorsement has been issued you will need to contact Council’s City Infrastructure Division to obtain a Permit to Construct Public Infrastructure. A CCTV of all stormwater infrastructure will be required prior to issue of practical completion for the relevant infrastructure, and a maintenance bond will be required.

 

Reason for condition

 

To ensure that the subdivision of land provides adequate services to meet the projected needs of future development. Shared driveways or when required under the Local Government (Building and Miscellaneous Provisions) Act 1993.

 

Part 5 1

 

Prior to the sealing of the final plan, the owner(s) of the property must enter into a Part 5 Agreement with the Council pursuant to the Land Use Planning and Approvals Act 1993. The Agreement must specify that:

 

1.         The owner will not build more than 30sqm of impervious area (including driveways and roofs) which cannot drain via gravity to the public stormwater servicing proposed Lot 5, unless separate written consent from Council is obtained.

 

2.         The maintenance of any works required to ensure overland flow will be managed in accordance with the approved engineering drawings and maintenance plan.

 

All costs for the preparation and registration of the Part 5 Agreement must be met by the owner.

 

The owner must comply with the Part 5 Agreement which will be placed on the property title.

 

Advice:

 

Please contact Council's Senior Development Engineer ((03) 6238 2715) to start the Part 5 Agreement process.

 

Where building approval is also required, it is recommended that the Part 5

Agreement process be started well before submitting documentation for building approval. Failure to start the Part 5 Agreement process prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that block limitations are disclosed and that overland flow is safely managed.

 

ENG sw10

 

Stormwater pre­treatment for stormwater discharges from the development and associated works must be installed prior to sealing of the final plan.

 

A stormwater management report and design must be submitted and approved, prior to commencement of work on the site. The stormwater management report and design must be prepared by a suitably qualified engineer and:

 

Either:­

 

1.         Provide detailed design of the final proposed treatment train, including estimations of contaminant removal in comparison with the State Stormwater Strategy targets;

 

2.         Include detailed design for the construction of adequate access for maintenance and renewal of the treatment system, taking into consideration site grades and the size/limitations of the vehicles that will need to access the location;

 

3.         Demonstrate the system is of an efficient life cycle cost;

 

4.         Outline the operational and maintenance measures to check and ensure the ongoing effective operation of all systems to satisfy the above requirement, i.e. including but not limited to: inspection frequency; cleanout procedures; as installed design detail/diagrams; a description and sketch of how the installed system operates; details of life of asset and replacement requirement; estimation of the life cycle cost including maintenance costs; and

 

5.         Show the flood extent for both the 5% and 1% AEP in relation to the systems location, ensuring it is located outside these extents.

Or:­

 

1.         A realistic cost estimate agreed upon with the Council is to be provided for the design and construction of a system on site that would meet the State Stormwater Strategy targets for the proposed subdivision. The equivalent of the cost estimate must be paid to the Council as a contribution for the upgrade of existing/proposed infrastructure offsite.

 

All work required by this condition must be undertaken in accordance with the approved stormwater management report and design.

 

Advice:

 

Once the stormwater management report and design has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Council notes that the current proposal reflects that of the adjoining subdivision 270A Lenah Valley; however their treatment system is only sized to achieve the State Stormwater Strategy targets for their developed land, not that of adjoining (i.e. 39 Brushy Creek). A cost effective alternative may be to contribute to the upgrading of their treatment system to accommodate flows from 39 Brushy Creek, such that the State Stormwater Strategy targets are met for 39 Brushy Creek also; provided this can be demonstrated to the Council. However this is a time sensitive alternative.

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To avoid the possible pollution of drainage systems and natural watercourses, and to comply with relevant State legislation.

 

ENG r7

 

Residential underground power and fibre ready facilities (pit and pipe that can hold optical fibre line) to each lot, and street lighting, must be installed prior to the sealing of the final plan.

 

A street lighting design must be submitted and approved, prior to sealing of the final plan. The street lighting design must be:

 

1.         In accordance with AS/NZS 1158 series;

 

2.         Include Tas Networks light standard and energy­efficient road light fittings; and

 

3.         Be certified by a suitably qualified person.

 

All work required by this condition must be undertaken in accordance with the approved street lighting design.

 

Advice:

 

Once the street lighting design has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that the subdivision of land provides adequate services to meet the projected needs of future development.

 

ENG r8

 

Prior to the commencement of works, detailed drawings of all road infrastructure associated with the subdivision must be submitted and approved.

 

The detailed drawings must be designed by a suitably qualified and experienced engineer in accordance with the Institute of Public Works Engineering Tasmanian Standard Drawings and Guidelines, the Department of State Growth Specifications, Safe Design of Structures Code of Practice, and all other relevant standards, guidelines and procedures.

 

All work must be undertaken in accordance with the approved detailed drawings.

 

Advice:

 

Once the detailed drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

The detailed drawings should include/detail/specify, but not be limited to, the following:

 

1.         Minimum sealed road pavement width shall be shown as 6.5m.

 

2.         Fully dimensioned horizontal and vertical geometry, including the intersections.

 

3.         Construction details in typical cross sections.

 

4.         Drainage details.

 

5.         Crossfalls.

 

6.         Kerb lines.

 

7.         Spot levels.

 

8.         Stormwater pits and reticulation details.

 

9.         Pipe material, class and gradients.

 

10.       Pedestrian and vehicle safety barriers.

 

11.       Traffic management signage.

 

12.       Footpath details (footpaths to be constructed using concreted). The footpath should be 1.5m wide and on the left hand side of the road (driving towards the cul-de-sac), to match the footpath with 270A Lenah Valley Road.

 

13.       Kerb ramp locations.

 

14.       Long section of road showing grades.

 

15.       Details of any benching required for the road construction.

 

16.       Any retaining structures or embankments within or supporting the road reservation.

 

17.       Cul­de­sac details.

 

18.       Vehicle crossings and sealed concrete driveway from the back of the vehicle boundary to or onto the lot.

 

19.       Road connection details (connect from 270A Lenah Valley subdivision).

 

20.       Structural certificates for pedestrian and vehicle safety barriers to ensure compliance with relevant codes and standards in respect to installation. Assessment of the suitability of the proposed road seal on gradients over

14% will be required with the plans.

 

21.       Demonstrate that the road and cul de sace is adequate to be used by service vehicles, including to turn around. Turn path diagrams in accordance with the Austroads Design Vehicles and Turning Path Templates Guide may need to be provided.

 

Reason for condition

 

To ensure works are designed in accordance with relevant standards.

 

SUB s2

 

Prior to sealing of the final plan, the owner of Lot 7 on the plan must covenant with the Council to the intent that the burden of this covenant may run with and bind the covenantor's lots and any part thereof, to observe the following stipulation:

 

"Not without the written consent of the Hobart City Council to erect or permit to be erected any building or structure, or carry out any landscaping that may change the contours of the land or restrict the free flow of water over the land or cause erosion within 10 (ten) metres from the top of the watercourse embankment of Brushy Creek Rivulet."

 

Reason for condition

 

To ensure the protection of the riparian zone of the rivulet/watercourse and prevent potential flood water impediment.

 

SUB s3

 

The final plan must include a 4m wide footway (public highway), extending from the head of the cul­de­sac to the southern boundary of the site. The siting of the footway (public highway) must maintain a minimum lot size of 750m2 for each lot.

 

Advice:

 

The final location of the footway (public highway) is to be approved prior to the sealing of the final plan by the Council's Director City Infrastructure.

 

Construction of the footway (public highway) will not be required as part of the subdivision development works.

 

Reason for condition

 

To facilitate and make provision for the future construction of a pedestrian and cycle link to Brushy Creek Road and to ensure that the subdivision complies with clause 10.6.2 and clause 10.6.3.

 

ADVICE

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

CONDITION ENDORSEMENT

 

If a condition endorsement is required by a planning condition above, you will need to submit the relevant documentation to satisfy the condition via the Condition Endorsement Submission on Council's online services e­planning

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Once approved, the Council will respond to you via email that the condition has been endorsed (satisfied). Detailed instructions can be found here.

 

BUILDING PERMIT

 

Building permit in accordance with the Building Act 2016. Click here for more information.

 

PLUMBING PERMIT

 

Plumbing permit in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.

 

OCCUPATION OF THE PUBLIC HIGHWAY

 

Permit for the occupation of the public highway for construction or special event (e.g. placement of skip bin, crane, scissor lift etc). Click here for more information.

 

Occupational license for structures in the Hobart City Council highway reservation, in accordance with conditions to be established by the Council. Click here for more information.

 

Road closure permits for construction or special event. Click here for more information.

 

Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information.

 

PERMIT TO CONSTRUCT PUBLIC INFRASTRUCTURE

 

Permit to construct public infrastructure with a 12 month maintenance period and bond (please contact the Hobart City Council's City Infrastructure Division to initiate the permit process).

 

NEW SERVICE CONNECTION

 

New service connection (please contact the Hobart City Council's City Infrastructure Division to initiate the application process).

 

STORMWATER

 

Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information.

 

ACCESS

 

Designed in accordance with LGAT­ IPWEA Tasmanian standard drawings. Click here for more information.

 

CROSS OVER CONSTRUCTION

 

The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design. Click here for more information.

 

STORMWATER / ROADS / ACCESS

 

Services to be designed and constructed in accordance with the (IPWEA) LGAT standard drawings. Click here for more information.

 

COUNCIL RESERVES

 

This permit does not authorise any works on the adjoining Council land. Any act that causes, or is likely to cause damage to Council’s land may be in breach of the Council’s Parks, Recreation and Natural Areas Bylaw and penalties may apply. The by law is available here.

 

WEED CONTROL

 

Effective measures are detailed in the Tasmanian Washdown Guidelines for Weed and Disease Control: Machinery, Vehicles and Equipment (Edition 1, 2004). The guidelines can be obtained from the Department of Primary Industries, Parks, Water and Environment website.

 

NOISE REGULATIONS

 

Click here for information with respect to noise nuisances in residential areas.

 

FEES AND CHARGES

 

Click here for information on the Council's fees and charges.

 

DIAL BEFORE YOU DIG

 

Click here for dial before you dig information.

 

SUBDIVISION ADVICE

 

All conditions imposed by this permit are in accordance with the Local Government Building and Miscellaneous Provisions) Act 1993 and the Conveyancing and Law of Property Act 1884.

 

For information regarding standards and guidelines for subdivision works click here.

 

 

 

Briscoe

Denison                                                That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 


 

 

9.4      43 Pedder Street, New Town - Partial Demolition, Alterations and Extensions - PLN-17-505

            File Ref: F17/108319

Ref:    Open CP 7.1.7, 11/09/2017

 

Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for partial demolition, alterations and extension to the single dwelling at 43 Pedder Street, New Town for the reasons outlined in the officer’s report attached to supplementary item 7.1.7 of the Open City Planning agenda of 11 September 2017 and a permit containing the following conditions be issued:

 

 

GEN

 

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­17­505 ­ 43 PEDDER STREET NEW TOWN TAS 7008 Final Planning Documents except where modified below.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

PLN s1

 

The roof of the extension must be amended to be a skillion design with a slope no greater than 2 degrees, and that is no higher at any point than the ridgeline of the roof of the existing house on the subject site.

 

Prior to the issue of any building permit, drawings demonstrating compliance with this condition to the satisfaction of the Council's Director City Planning must be submitted to and approved by the Council.

 

All work required by this condition must be undertaken in accordance with the approved drawings.

 

Advice: Once the drawings have been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To minimise the potential impact of the extension upon neighbouring properties

 

ENG 4

 

 

The driveway and car parking area approved by this permit must be constructed to a sealed standard and surface drained prior to the commencement of use.

 

Reason for condition

 

 

To ensure safe access is provided for the use.

 

 

ENG 5

 

 

The number of car parking spaces approved on the site, for use is two (2).

 

 

Reason for condition

 

 

To ensure safe and efficient parking adequate to provided for the use.

 

 

ENG 8

 

 

The use of the car parking spaces is restricted to User Class 1A (residential, domestic and employee parking) in accordance with Australian Standards AS/NZS2890.1 2004 Table 1.1.

 

Reason for condition

 

 

In the interests of vehicle user safety and the amenity of the development.

 

 

ENG 3

 

 

The car parking area must be 2.7m wide in accordance with the Australian standards AS/NZS 2890.1

 

 

Reason for condition

 

 

To ensure that the safety of users of the driveway/parking.

 

 

ENG 1

 

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails

to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

 

ENG 10

 

 

The front fencing and gate must allow adequate sight distance between user vehicles, cyclists and pedestrians. The "pool style" fencing must be at least

50% transparent.

 

 

Reason for condition

 

To ensure the safety of vehicles entering and leaving the development and of pedestrians and traffic in the vicinity.

 

 

ENV 1

 

 

Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site. Sediment controls must be maintained until all areas of disturbance have been stabilized or re­vegetated.

 

 

Advice: For further guidance in preparing a Soil and Water Management Plan – in accordance with Fact sheet 3 Derwent Estuary Program click here.

 

 

Reason for condition

 

 

To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State legislation.

 

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.

 

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

 

BUILDING PERMIT

 

 

Building permit in accordance with the Building Act 2016. Click here for more information.

 

 

PLUMBING PERMIT

 

 

Plumbing permit in accordance with the Building Act 2016, Building Regulations

2016 and the National Construction Code. Click here for more information.

 

 

WORK PLACE HEALTH AND SAFETY

 

 

Appropriate occupational health and safety measures must be employed during the works to minimise direct human exposure to potentially­contaminated soil, water, dust and vapours. Click here for more information.

 

 

PROTECTING THE ENVIRONMENT

 

 

In accordance with the Environmental Management and Pollution Control Act 1994, local government has an obligation to "use its best endeavours to prevent or control acts or omissions which cause or are capable of causing pollution." Click here for more information.

 

 

NOISE REGULATIONS

 

 

Click here for information with respect to noise nuisances in residential areas.

 

 

WASTE DISPOSAL

 

 

It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill.

 

 

Further information regarding waste disposal can also be found on the Council’s website.

 

 

FEES AND CHARGES

 

 

Click here for information on the Council's fees and charges.

 

 

DIAL BEFORE YOU DIG

 

 

Click here for dial before you dig information.

 

 

Briscoe

Thomas                                                 That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 

9.5      1 / 63 Salamanca Place, Battery Point and adjacent Road Reserve - Outdoor Dining

            PLN-17-537 - File Ref: F17/109418

Ref:    Special Open CP 2.1.1, 18/09/2017

Application Expiry Date: 27 October 2017

Extension of Time: Not applicable

 

Pursuant to the Sullivans Cove Planning Scheme 1997, the Council approve the application for Outdoor Dining and 63 Salamanca Place and Adjacent Road Reserve, Battery Point for the reasons outlined in the officer’s report attached to item 2.1.1 of the Special Open City Planning Committee agenda of 18 September 2017 and a permit containing the following conditions be issued:

 

GEN

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­17­537 ­ 1/63 SALAMANCA PLACE AND ADJACENT ROAD RESERVE BATTERY POINT TAS 7004 ­ Final Planning Documents except where modified below.

 

Reason for condition

 

To clarify the scope of the permit.

 

ENG 3

 

The umbrella structure, must be constructed in accordance with approved certified design drawings, prior to the commencement of use.

 

Upon completion of the works, documents signed by a suitably qualified engineer, certifying that the umbrella structure has been constructed in accordance with the approved certified design drawings, must be lodged with the Council.

 

Reason for condition

 

To ensure the safety of users.

 

ENG 14

 

Design drawings of the umbrella structure and gas connection point must be submitted and approved, prior to commencement of work.

 

The design drawings must:

 

1.         Be prepared and certified by a suitable qualified engineer.

 

2.         Show footing details of the umbrella structure including cross sections that identifies the method of connection between the umbrella structure and footing such that the umbrella structure can be detached from the footing.

 

3.         Show that the top surface of the footing is flush with the footpath surface when the umbrella structure is detached from the footing and no objects protrude above the footpath surface.

 

4.         Show details of the gas connection point including cross sections that shows that the top surface of the gas connection point is flush with the footpath surface when the gas fire place is removed and no objects protrude above the footpath surface.

 

5.         Show the extent of the removal of existing footpath pavers and details of the reinstatement of existing footpath pavers to minimise the loss of pavers.

 

6.         Show a notation that excess footpath pavers must be returned to Council.

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

Advice:

 

Once the design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that the Council infrastructure is protected and the structure is provided in accordance acceptable standards.

 

ENG 1

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

A photographic record of the Council’s infrastructure (e.g. existing property

service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

Reason for condition

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENG s1

 

The entire umbrella structure above ground level must be removed from the site and the site made good when the use of the property associated with the umbrella structure ceases. The footpath must be left in a neat and tidy condition without hazard to any highway reservation users.  The works shall be undertaken at no cost to Council.

 

Reason for condition

 

To protect Council infrastructure at no cost to Council.

 

ENV 1

 

Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site. Sediment controls must be maintained until all areas of disturbance have been stabilized or re­vegetated.

 

Advice: For further guidance in preparing a Soil and Water Management Plan – in accordance with Fact sheet 3 Derwent Estuary Program click here.

 

Reason for condition

 

To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State legislation.

 

ADVICE

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

CONDITION ENDORSEMENT

 

If a condition endorsement is required by a planning condition above, you will need to submit the relevant documentation to satisfy the condition via the Condition Endorsement Submission on Council's online services e­planning

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Once approved, the Council will respond to you via email that the condition has been endorsed (satisfied). Detailed instructions can be found here.

 

BUILDING PERMIT

 

Building permit in accordance with the Building Act 2016. Click here for more information.

 

PLUMBING PERMIT

 

Plumbing permit in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.

 

OCCUPATION OF THE PUBLIC HIGHWAY

 

Permit for the occupation of the public highway for construction or special event (e.g. placement of skip bin, crane, scissor lift etc). Click here for more information.

 

Occupational licence for use of Hobart City Council highway reservation (outdoor seating, etc). Click here for more information.

 

Occupational license for structures in the Hobart City Council highway reservation, in accordance with conditions to be established by the Council. Click here for more information.

 

Road closure permits for construction or special event. Click here for more information.

 

Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information.

 

TEMPORARY PARKING PERMITS

 

General Exemption permits for construction vehicles i.e. residential or meter parking/loading zones. Click here for more information.

 

STORMWATER

 

Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information.

 

WORK WITHIN THE HIGHWAY RESERVATION

 

Please note development must be in accordance with the Hobart City Council’s Highways By law. Click here for more information.

 

STORMWATER / ROADS / ACCESS

 

Services to be designed and constructed in accordance with the (IPWEA) LGAT­ standard drawings. Click here for more information.

 

FEES AND CHARGES

 

Click here for information on the Council's fees and charges.

 

DIAL BEFORE YOU DIG

 

Click here for dial before you dig information.

 

OUTDOOR DINING AND UMBRELLA INFRASTRUCTURE GUIDELINES

 

For your information, you are advised that until such time as the Council resolves the future direction for the management of the southern footpath on Salamanca Place between Montpelier Retreat and the Silos, the following guidelines apply:

·      The City of Hobart as highway authority only consider requests for the installation of additional fixed or permanent umbrellas on the southern footpath if the installation of those umbrellas would not conflict with the future provision of:

 

1.         A 3 metre clear pedestrian path (that may only be covered by temporary umbrellas) adjacent to the building line;

 

2.         A 1.5 metre wide clear pedestrian path (that may only be covered by temporary umbrellas) between outdoor dining furniture and parked cars; and

 

3.         A 1.2 metre wide clear pedestrian path between outdoor dining areas.

·      The City of Hobart as highway authority only consider requests for the installation of tables, chairs and barriers to facilitate outdoor dining that can be removed from the public footpath when not in use.

·      Subject to the recommendations above, in relation to request for new or adjusted occupation licences for outdoor dining on the Salamanca Place southern footpath between Kennedy Lane and Wooby's Lane, the City of Hobart as highway authority permit the installation of removable tables, chairs and barriers to facilitate outdoor dining on the equivalent alignment to those currently in front of the businesses Maldini, Jack Greene, Cargo and Grape.

·      The General Manager advise any applicant considering the purchase and installation of furniture on the Salamanca Place footpath of the above recommendations, and further advise that until such time that the Council considers and resolves its future direction for the management of that footpath, that any furniture purchased and installed that is not compatible with the future direction may need to be removed at the applicant's cost.

·      When the Council implements changes to the regulations in this area, the applicants must ensure compliance with the new regulations at their own cost.

 

 

Briscoe

Burnet                                                  That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

Ruzicka

Deputy Lord Mayor Christie

Cocker

Zucco

 

Briscoe

 

Sexton

 

Burnet

 

Thomas

 

Denison

 

Harvey

 

 

 

 

 

10.      Hobart Interim Planning Scheme 2015 - Sullivans Cove Planning Scheme 1997 - Royal Hobart Hospital Helipad Airspace - Proposed Amendments

            File Ref: F17/107684; 17/167

Ref:    Open CP 7.2, 11/09/2017

 

That:   1.    Pursuant to Section 34(1) (b) of the former provisions of the Land Use Planning and Approvals Act 1993, Council resolve to initiate the following amendments:

(i)      Amendment PSA-17-6  to the Hobart Interim Planning Scheme 2015 as detailed in Attachment B; attached to item 7.2 of the Open City Planning agenda of 11 September 2017 and

(ii)     Amendment PSA-17-7 to the Sullivans Cove Planning Scheme1997 as detailed in Attachment C, attached to item 7.2 of the Open City Planning agenda of 11 September 2017.

2.    Pursuant to Section 35 of the former provisions of the Land Use Planning and Approvals Act 1993, Council certify that Amendment PSA-17-6 to the Hobart Interim Planning Scheme 2015 and Amendment PSA-17-7 to the Sullivans Cove Planning Scheme 1997 meets the requirements of Section 32 of the former provisions of the Land Use Planning and Approvals Act 1993 and authorise the General Manager and the Deputy General Manager to sign the Instruments of Certification (Attachments D&E, attached to item 7.2 of the Open City Planning agenda of 11 September 2017).

3.    Pursuant to Section 38 of the former provisions of the Land Use Planning and Approvals Act 1993, Council place Amendment PSA-17-6 to the Hobart Interim Planning Scheme 2015 and Amendment PSA-17-7 to the Sullivans Cove Planning Scheme 1997 on public exhibition for a 28 day period following certification.

 

 

Briscoe

Thomas                                                  That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 

11.      European Union World Cities Project - Katowice Poland

            File Ref: F17/107477

Ref:    Open CP 8.1, 11/09/2017

 

That:  1.     The Council note that the European World Cities Project with the City of Katowice in Poland is now focused on the operational and technical levels.

2.    Alderman Briscoe (subject to availability) be nominated to attend the Cities and Regions Conference in Brussels from 9 to 13 October 2017, with the cost of attendance to be attributed to the City Government Function under conference attendance.

3.    A report be provided, for information, on the progress of the project following the meetings City of Katowice Poland and Cities and Regions Conference from 9 – 13 October 2017.

 

 

Briscoe

Christie                                                That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

  


 

 

Community, Culture and Events Committee

 

12.      Lunar New Year Activities

            File Ref: F17/107065;  25-1-1

Ref:    Open CCE 6.1, 13/09/2017

 

That:   1.    The Lunar New Year Working Group continue to be convened, and be chaired by an Alderman of the City of Hobart to be nominated by the Council, with the next meeting to be held in early October 2017.

(i)      The Deputy Lord Mayor Christie be nominated as the chair of the Lunar New Year Working Group.

2.    The following assistance will be provided in respect to Lunar New Year 2018:

(i)      Capacity building developmental support and advice for working group members looking to stage events; and

(ii)     Overarching marketing and media support for the event program at a similar level to the provision in 2017, using the existing design templates and promotional materials (street banners, Town Hall banners, pull up banners and caps) and the development of a ‘Year of the Dog’ program event guide and promotional campaign.

 

 

Harvey

Sexton                                                  That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 


 

 

Governance Committee

 

13.      Hobart not Highrise - Second Petition

            File Ref: F17/105148

Ref:    Open GC 6.1, 5/09/2017

 

That:   1.    The Council note the petition submitted by Hobart Not Highrise received by the Council on 7 August 2017, which requests the following action by the Council:

(a)  Protect Hobart’s skyline and prevent oversized buildings obscuring views of the mountain and waterfront.

(b)  Support and defend the current planning rules for building height limits in Hobart, to avoid the problems with wind and shadow.

(c)   Reject the development applications for buildings that breach height limits, such as the Fragrance Group’s proposals for 2-6 Collins Street and 28-30 Davey Street.

(d)  Hold a public meeting as the first step for residents to vote on these issues in an electors poll under section 59 of the Local Government Act 1993.

2.    Noting that the number of signatories to the petition meet the criteria required under s 59 2 of the Local Government Act 1993, the Council resolve to hold a public meeting on Monday 16 October 2017 at 6.00pm at a venue to be determined.

3.    The General Manager take all appropriate steps to facilitate the public meeting in accordance with the requirements of the Local Government Act 1993 and also in regard to logistics.

4.    In resolving to conduct the public meeting, the Council note its statutory obligations as the local government planning authority.

5.    Hobart Not Highrise be advised of the Council’s decision.

 

 

Ruzicka

Burnet                                                  That the recommendation be adopted.

 

 

 

 

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 

 

14.      2016–17 Annual Plan Final Report - Period Ended 30 June 2017

            File Ref: F17/105007; 21-1-1

Ref:    Open GC 6.3, 5/09/2017

 

That the Council endorse the Annual Plan Final Report for the period ended 30 June 2017, marked as attachment A to item 6.3 of the Open Governance Agenda of 5 September 2017.

 

 

Ruzicka

Burnet                                                  That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

15.      By-Laws Review - Public Consultation Outcomes

            File Ref: F17/92284;  15/179

Ref:    Open GC 6.4, 5/09/2017

 

That:   1.    The Council resolve (by an absolute majority) of its intention to make the following by-laws, specifically:

·       Public Spaces By-law, marked as Attachment A to item 6.4 of the Open Governance Committee agenda of 5 September 2017 ;

·       Infrastructure By-law, marked as attachment B to item 6.4 of the Open Governance Committee agenda of 5 September 2017;

·       Car Parks By-law marked as attachment C to item 6.4 of the Open Governance Committee agenda of 5 September 2017;

·       Environmental Health By-law marked as attachment D to item 6.4 of the Open Governance Committee agenda of 5 September 2017;  and

·       Waste Management By-law, marked as Attachment E to item 6.4 of the Open Governance Committee agenda of 5 September 2017.

2.    The Council delegate authority to the General Manager to prepare Regulatory Impact Statements for each of the by-laws listed above, with the view to presenting these and the five by-laws to the Director of Local Government for a certificate of approval, pursuant to section 156A of the Local Government Act 1993.

3.    Subject to a certificate of approval from the Director of Local Government, the Council delegate authority to the General Manager to give notice of the proposed by-law in order to advertise a further public consultation process, whereby the by-laws and associated regulatory impact statements are made available for inspection and comment.

 

 

Ruzicka

Burnet                                                  That the recommendation be adopted.


 

 

MOTION CARRIED BY ABSOLUTE MAJORITY

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

16.      City of Hobart - Draft Customer Service Charter

            File Ref: F17/104245

Ref:    Open GC 6.5, 5/09/2017

 

That:   1.    The revised draft Customer Service Charter, shown as Attachment B to item 6.5 of the Open Governance Committee agenda of 5 September 2017, be endorsed for public comment for a four week period.

2.    Following the comment period, a further report be provided presenting the results of the consultation.

3.    Following the implementation of the organisation’s customer request management system, scheduled to occur in April 2018, the Charter be further reviewed to include the revised customer management arrangements available through that business system.

 

Ruzicka

Burnet                                                    That the recommendation be adopted.

 

Procedural Motion

 

Thomas

Sexton                                                                                                                        

 

 

That the revised draft Customer Service Charter shown as Attachment B to item 6.5 of the Open Governance Committee agenda of 5 September 2017, be referred back to the Governance Committee for further consideration.

 

 

 

 

PROCEDURAL MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

Parks and Recreation Committee

 

17.      Wellington Park Pinnacle - Broadcast Australia - Temporary Transmission Tower

            File Ref: F17/91604

Ref:    Open PR 6.1, 14/09/2017

 

That:   1.    The temporary transmission mast and associated works, as outlined in planning permit PLN-17-488 marked as Attachment B to item 6.1 of the Open Parks and Recreation Committee agenda of 14 September 2017, that is required for critical upgrades to Broadcast Australia’s facility, be approved for a period of up to 7 months commencing October 2017, as required under the terms of the current lease.

2.    Broadcast Australia be required to provide the City with a traffic management plan and liaise with the City around the timing of the works.

3.    Broadcast Australia be required to develop and implement a communications plan for the activity, including fielding all public enquiries.

4.    The Wellington Park Management Trust be advised of the Council’s decision.

 

Sexton

Burnet                                                    That the recommendation be adopted.

 

Amendment

 

Cocker

Harvey                                                                                                                       

 

That an additional clause be included as follows:

 

5.    The General Manager write to the owners of the current transmission tower and request that alternatives in technology be explored with a view to the removal of the tower at the earliest opportunity.

 

 

AMENDMENT CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

Deputy Lord Mayor Christie

Briscoe

Zucco

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

SUBSTANTIVE MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

 

COUNCIL RESOLUTION:

 

That:   1.    The temporary transmission mast and associated works, as outlined in planning permit PLN-17-488 marked as Attachment B to item 6.1 of the Open Parks and Recreation Committee agenda of 14 September 2017, that is required for critical upgrades to Broadcast Australia’s facility, be approved for a period of up to 7 months commencing October 2017, as required under the terms of the current lease.

2.    Broadcast Australia be required to provide the City with a traffic management plan and liaise with the City around the timing of the works.

3.    Broadcast Australia be required to develop and implement a communications plan for the activity, including fielding all public enquiries.

4.    The Wellington Park Management Trust be advised of the Council’s decision.

5.    The General Manager write to the owners of the current transmission tower and request that alternatives in technology be explored with a view to the removal of the tower at the earliest opportunity.

 

 

 

18.      Healthy Hobart 2017/2018 - Proposed Program

            File Ref: F17/106489; 72-1-1

Ref:    Open PR 6.2, 14/09/2017

 

That   1.     Approval be provided for the City to deliver the 2017/2018 Healthy Hobart program, as proposed in Attachment B to item 6.2 of the Open Parks and Recreation agenda of 14 September 2017, at an estimated cost of $30,000 to be funded from the Recreation and Project Management Budget Function in the 2017/2018 Annual Plan.

           2.     The General Manager be authorised to submit a grant application to the State Government’s Healthy Tasmania Community Innovations Grants program of $25,000 ex GST, in order to fund a winter program of the City’s Healthy Hobart Program in 2018.

 

 

Sexton

Burnet                                                  That the recommendation be adopted.


 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

 

Special Report – General Manager

 

19.      Australian Local Government Association - National Local Roads & Transport Congress 2017 - Albany, Western Australia - 6 to 8 November 2017 - Aldermanic Nominations

            File Ref: F17/109068

 

That:   1.    The Council nominate Aldermen Ruzicka and Burnet (subject to confirmation) to represent the Council at the ALGA National Roads & Transport Congress 2017, to be held in Albany, Western Australia from 6 to 8 November 2017.

2.    The estimated cost of $3,900 per person be attributed to the general Aldermanic conferences allocation within the City Government function of the 2017-18 Annual Plan.

 

 

 

Christie

Sexton                                                   That the recommendation be adopted.


 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

     

20.     Closed Portion of the Meeting

 

The following items were discussed:-

 

Item No. 1          Minutes of the last meeting of the Closed Portion of the Council Meeting

Item No. 2          Communication from the Chairman

Item No. 3          Leave of Absence

Item No. 4          Consideration of supplementary Items to the agenda

Item No. 5          Indications of pecuniary and conflicts of interest 

Item No. 6          City of Hobart Art Prize Review

LG(MP)R 15(2)(c)(i) and  (g)

Item No. 7          Sale of Land for Unpaid Rates - Update

LG(MP)R 15(2)(f) and  (g) 

 

Sexton

Christie                                                                           That the items be noted.

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Cocker

 

Thomas

 

Denison

 

Harvey

 

 

  

The Chairman adjourned the meeting at 5.45 pm to conduct the closed portion of the meeting.

 

The meeting reconvened at 6.38 pm.

 

Item 20 was then taken.

 

There being no further business the meeting closed at 6.38 pm

 

 

 

 

 