Minutes
Open Portion
Monday, 4 February 2019
AT 5:14 pm
Council Chamber, Town Hall
|
Minutes (Open Portion) Council Meeting |
Page 3 |
|
4/2/2019 |
|
PRESENT, APOLOGIES AND LEAVE OF ABSENCE
3. Communication from the Chairman
4. Notification of Council Workshops
7. Consideration of Supplementary Items
8. Indications of Pecuniary and Conflicts of Interest
9. Council Acting as Planning Authority
9.3 Pirie Street and New Town Road, New Town and Road Reserve - Bus Shelter
9.4 2 Churchill Avenue, Sandy Bay - Temporary Buildings for Residential College
10. Monthly Building Statistics - 1 December 2018 - 31 December 2018.
Economic Development & Communications Committee
11. kunanyi/Hobart Visitation Policy and Strategy
12. Closed Portion of the Meeting
Special Report – General Manager
13. Representation on Internal and External Bodies
|
Minutes (Open Portion) Council Meeting |
Page 5 |
|
4/02/2019 |
|
PRESENT:
The Lord Mayor Councillor A M Reynolds, The Deputy Lord Mayor Councillor H Burnet, Aldermen M Zucco, J R Briscoe, Dr P T Sexton, D C Thomas, T M Denison, Councillor W F Harvey, Alderman S Behrakis, Councillors M Dutta, H Ewin and Z Sherlock.
APOLOGIES:
Nil.
LEAVE OF ABSENCE:
Nil.
Councillor Dutta arrived at the meeting at 5.16 pm and was not present for item 1.
Alderman Thomas arrived at the meeting at 5.30 pm and was not present for items 1 to 9.1.
Alderman Briscoe left the meeting at 5.16 pm, returning at 5.17 pm.
Councillor Sherlock left the meeting at 6.12 pm, returning at 6.13pm.
Alderman Behrakis left the meeting at 6.28 pm, returning at 6.30 pm.
The Chairman reports that she has perused the minutes of the meeting of the Open Portion of the Council meeting held on Monday, 21 January 2019, finds them to be a true record and recommends that they be taken as read and signed as a correct record.
DEPUTY LORD MAYOR HARVEY That the recommendation be adopted. |
||||||||||||||||||||||
MOTION CARRIED VOTING RECORD
The minutes were signed. |
Are there any items, which the meeting believes, should be transferred from this agenda to the closed agenda or from the closed agenda to the open agenda, in accordance with the procedures allowed under Section 15 of the Local Government (Meeting Procedures) Regulations 2015?
No items were transferred.
In accordance with the requirements of the Local Government (Meeting Procedures) Regulations 2015, the General Manager reports that the following workshop has been conducted since the last ordinary meeting of the Council.
Date: 30 January 2019
Purpose: Review of Capital City Strategic Plan
|
The General Manager advised that this petition was tabled at the last Council meeting on 21 January 2019. At the time the petition noted that there were 1662 signatories on the petition. In line with the legislative requirement to have the signatures of 1,000 eligible electors in the municipal area to comply with the request for a public meeting, the number of signatures was verified, arriving at 972. Hobart Not Highrise has today provided an additional 146 valid signatures, taking the total complying number to 1,118. The General Manager tabled the additional signatures to the petition accordingly. BRISCOE SEXTON That the petition be received and noted and referred to the appropriate committee. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
a Part 1 - Petition - Heights Heritage and Viewlines ⇨ b Part 2 - Petition - Heights Heritage and Viewlines ⇨ c Part 3 - Petition - Heights Heritage and Viewlines ⇨ d Part 4 - Petition - Heights Heritage and Viewlines ⇨ e Part 5 - Petition - Heights Heritage and Viewlines ⇨ f Part 6 - Petition - Heights Heritage and Viewlines ⇨ g Part 7 - Petition - Heights Heritage and Viewlines ⇨ |
|
The General Manager tabled a petition from Ms Anne McConnell on behalf of the residents of Fern Tree, in particular the near neighbours of Fern Tree Park requesting for the Hobart City Council to respect the historic, landscape and community values of the Fern Tree Park by retaining the stone bus shelter built by local community members post 1967 bushfires, and by redesigning the proposed toilet, which will be highly visible from the road, to be more sympathetic to the historic as well as natural values of the Huon Road corridor through its design, materials and finish. We request further community consultation on the revised design. There were 74 signatories to the petition. BRISCOE SEXTON That the petition be received and noted and referred to the appropriate committee. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
a Petition - Fern Tree Stone Bus Shelter - New Toilet Sympathetic Redesign ⇨ |
Ref: Part 2, Regulation 8(6) of the Local Government (Meeting Procedures) Regulations 2015.
That the Council resolve to deal with any supplementary items not appearing on the agenda, as reported by the General Manager in accordance with the provisions of the Local Government (Meeting Procedures) Regulations 2015.
|
||||||||||||||||||||||||
DEPUTY LORD MAYOR SEXTON That the recommendation be adopted. |
||||||||||||||||||||||||
MOTION CARRIED VOTING RECORD
|
Ref: Part 2, Regulation 8(7) of the Local Government (Meeting Procedures) Regulations 2015.
Elected Members are requested to indicate where they may have any pecuniary or conflicts of interest in respect to any matter appearing on the agenda, or any supplementary item to the agenda, which the Council has resolved to deal with.
No interest was indicated.
In accordance with the provisions of Part 2 Regulation 25 of the Local Government (Meeting Procedures) Regulations 2015, the intention of the Council to act as a planning authority pursuant to the Land Use Planning and Approvals Act 1993 is to be noted.
In accordance with Regulation 25, the Council will act as a planning authority in respect to those matters appearing under this heading on the agenda, inclusive of any supplementary items.
The Council is reminded that in order to comply with Regulation 25(2), the General Manager is to ensure that the reasons for a decision by a Council or Council Committee acting as a planning authority are recorded in the minutes.
9.1 66 Burnett Street, North Hobart & Adjacent Road Reserve - Demolition and New Building for 57 Multiple Dwellings, 13 Visitor Accommodation Units, Food Services, and Signage (Re-Advertised Amended Proposal) PLN-17-1066 - File Ref: F19/7158 Ref: Open CPC 7.1.1, 29/01/2019 Application Expiry Date: 6 February 2019 Extension of Time: Not applicable |
|||||||||||||||||||||||||
|
That: Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for demolition and new building for 57 multiple dwellings, 13 visitor accommodation units, food services, and signage at 66 Burnett Street, North Hobart for the reasons outlined in the officer’s report, attached to item 7.1.1 of the Open City Planning Committee agenda of 29 January 2019 and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN171066 66 BURNETT STREET NORTH HOBART TAS 7000 Final Planning Documents except where modified below.
Reason for condition
To clarify the scope of the permit.
TW
The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2018/0015HCC dated 28 August 2018 as attached to the permit.
Reason for condition
To clarify the scope of the permit.
PLN s1
Apartment 3U21 must be designed to provide internal noise levels that accord a reasonable level of residential amenity for the occupants.
Prior to the issue of any approval under the Building Act 2016, revised plans must be submitted and approved that demonstrate likely compliance with this condition.
All work required by this condition must be undertaken in accordance with the approved revised plans.
Reason for condition
To ensure that buildings for residential use provide reasonable levels of residential amenity
PLN s2
Either:
a) Lighting must be provided at the pedestrian entry to the development from
Elizabeth Street;
or, b) The pedestrian entry to the development from Elizabeth Street must be redesigned to avoid the creation of a potential entrapment space.
Prior to the issue of any approval under the Building Act 2016, revised plans must be submitted and approved that demonstrate likely compliance with this condition.
All work required by this condition must be undertaken in accordance with the approved revised plans.
Reason for condition
To ensure that building design for nonresidential uses provides for the safety of the public.
PLN s3
Prior to construction of the development commencing, a comprehensive landscaping plan with a particular focus on the issue of maintaining privacy with neighbours must be developed for the podium garden and submitted to Council. The landscaping plan must be to the satisfaction of Council's Director City Planning, and all landscaping shown on the approved landscaping plan must be completed prior to the commencement of the approved use. The landscaping must be maintained throughout the life of the development in accordance with the approved landscaping plan.
Reason for condition
To maintain the amenity of adjacent residential properties.
PLN s4
Any mechanical plant and miscellaneous equipment such as heat pumps, air conditioning units, switchboards, hot water units or similar must be screened from view from adjacent streets and other public spaces.
Prior to the issue of any approval under the Building Act 2016, revised plans must be submitted and approved showing screens for any mechanical plant and miscellaneous equipment such as heat pumps, air conditioning units, switchboards, hot water units or similar.
All work required by this condition must be undertaken in accordance with the approved revised plans.
Reason for condition
To ensure that building design contributes positively to the streetscape and the amenity and safety of the public.
ENG sw4
The development (including hardstand) must be drained directly to Council infrastructure on Elizabeth Street with adequate capacity for the 5% AEP event. The Burnett Street connection and associated private pipework must be investigated and, should it not be utilised by any other property than 66 Burnett Street, be abandoned and sealed.
The new stormwater connection must be constructed, and any existing redundant connections be abandoned and sealed. The connection works must be done at the owner’s expense prior to the first occupation.
Detailed engineering drawings must be submitted and approved, prior to commencement of work or issue of any consent under the Building Act 2016 (whichever occurs first). The detailed engineering drawings must include:
2. The size and design
of the connection such that it is appropriate to safely
service the development to the worstcase 5% AEP event; 3. Longsections of the proposed connection clearly showing clearances from any nearby
services, cover, size, material and delineation of public and private
infrastructure. Connections must be freeflowing gravity; 4. Details
of the investigation into the existing potentially shared drainage to
Burnett Street; 5. A safe overflow point where the private stormwater (sized to take 1% AEP flows beyond the building line) reduces.
All work required by this condition must be undertaken in accordance with the approved detailed engineering drawings.
Advice: · Once approved, an application for a new stormwater connection to Council's City Infrastructure Division will be required for abandonment, upgrade or new
connection. · Where building / plumbing approval is also required, it is recommended that documentation to satisfy this condition is submitted well before submitting documentation for building/plumbing approval. Failure to address planning condition requirements prior to submitting for building/plumbing approval may result in unexpected delays.
Reason for condition
To ensure the site is drained adequately.
ENG sw5
The Council stormwater main crossing Elizabeth Street must convey the 5% AEP flows from its catchment. Should the current main have insufficient capacity, a stormwater main upgrade must be designed and constructed prior to the commencement of the use. Engineering design drawings and report must be submitted and approved, prior to commencement of work or issue of any consent under the Building Act 2016 (whichever occurs first). The engineering drawings and report must:
1. Be certified by a qualified and experienced engineer; 2. Include
the associated calculations and catchment area
plans. The main must be sized to accommodate at least the 5% AEP flows from fully
developed catchment; 3. Show in both plan
and longsection any
required stormwater main upgrade, including but not limited to, connections, flows, velocities,
hydraulic grade
lines, clearances, cover, gradients, sizing, material, pipe
class, and inspection openings. Note: Council requires pipe upgrade
rather than duplication if practicable. Mains must be a minimum
class 4 RCP under roads.
4. Include a construction program and method for
any required upgrade of the stormwater main to maintain drainage of the road and thirdparty
land. 5. Be substantially in accordance with the LGAT Standard Drawings and Tasmanian Subdivision Guidelines
All work required by this condition must be undertaken in accordance with the approved engineering drawings.
Advice: · The applicant is required submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process
(noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain
condition endorsement and for fees and charges]). This is a separate
process to any building
approval under the Building
Act 2016. · Failure
to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. · Please note that once the condition endorsement has been issued you will need to contact Council’s City Infrastructure Division to obtain a Permit to Construct Public Infrastructure. A twelve month maintenance period, bond and CCTVs will apply.
Reason for condition
To ensure Council’s hydraulic infrastructure meets acceptable standards.
ENG sw7
Stormwater pretreatment for the site, and any detention required for stormwater discharges from the development, must be installed prior to commencement of use /issue of a Certificate of Completion (whichever occurs first).
A stormwater management report and design must be submitted and approved, prior to commencement of work / issue of any consent under the Building Act 2016 (whichever occurs first). The stormwater management report and design must:
1. be prepared
by a suitably qualified engineer; 2. include
detailed design of the proposed
treatment train, including final
estimations of contaminant removal; 3. include detailed design and supporting calculations of any
detention tank proposed to limit the 5% AEP flows from the site to the receiving
capacity of the public
infrastructure crossing Elizabeth Street. All
assumptions must be clearly
stated. 4. Include a Stormwater Management Summary Plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; cleanout procedures; descriptions and diagrams of how the installed systems operate; details of the life of assets and replacement requirements.
All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and design.
Advice: Once the stormwater management report and design has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement)
Reason for condition
To avoid the possible pollution of drainage systems and natural watercourses, to comply with relevant State legislation, and to ensure the development’s stormwater system takes into account limited receiving capacity of Council’s infrastructure.
ENG tr1
Traffic management within the car parking area must be installed prior to the commencement of the use.
Traffic management design drawing(s) of the proposed traffic management within the car park (including signage and linemarking), must be submitted and approved, prior to the issue of any approval under the Building Act 2016 or the commencement of works on site (whichever occurs first). The design drawing(s) and management plan must show but not limited to, the following information:
1. Road hump to be installed in the driveway 2 metres
back from the
footpath at the car park entrance/exit to ensure low vehicle speeds
when exiting onto Burnett Street; 2. Signage and
other warning devices within the car
park advising that vehicles travelling up the ramps should give way to vehicles travelling
down; 3. Signage
to be installed at the driveway entrance/exit informing users
access is restricted to left in –
left out only (as per Clause 3.2.3 of AS2890.1); 4. Pavement arrows for the control and direction of circulating traffic within the car park and associated access in accordance to Australian/NZS Standard, Parking facilities Part 1: Offstreet car parking AS/NZS 2890.1: 2004;
5. All small
car parking spaces must be delineated by means of white or yellow
pavement lines and suitable signage; and 6. All turning bays must be must be delineated by means of white or yellow pavement lines and suitable signage.
All work required by this condition must be undertaken in accordance with the approved traffic management design drawings.
Advice: Once the traffic management design drawings have been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
In the interests of user safety and the amenity of the occupiers of the development.
ENG tr2
A construction traffic and parking management plan must be implemented prior to the commencement of work on the site (including demolition).
The construction traffic (including cars, public transport vehicles, service vehicles, pedestrians and cyclists) and parking management plan must be submitted and approved, prior to the issue of any approval under the Building Act 2016 or the commencement of works on site (whichever occurs first). The construction traffic and parking management plan must include but not limited to, the following information:
1. Be prepared by a suitably qualified person; 2. Develop
a communications plan
to advise the
wider community of
the traffic and parking impacts during construction; 3. Include
a start date
and finish dates
of various stages
of works; 4. Include
times that trucks and other traffic associated with the works will
be allowed to operate; and 5. Nominate a superintendant, or the like, to advise the Council of the progress of works in relation to the traffic and parking management with regular meetings during the works.
All work required by this condition must be undertaken in accordance with the approved construction traffic and parking management plan.
Advice: Once the construction traffic and parking management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To ensure the safety of vehicles entering and leaving the development and the safety and access around the development site for the general public and adjacent businesses.
ENG 2a
Prior to first occupation or commencement of use (whichever occurs first), vehicular barriers compliant with the Australian Standard AS/NZS1170.1:2002 must be installed to prevent vehicles running off the edge of an access driveway or parking module (parking spaces, aisles and manoeuvring area) where the drop from the edge of the trafficable area to a lower level is 600mm or greater, and wheel stops (kerb) must be installed for drops between 150mm and 600mm. Barriers must not limit the width of the driveway access or parking and turning areas approved under the permit.
Advice: · The Council
does not consider a slope
greater than 1 in 4 to constitute a lower level as described in AS/NZS
2890.1:2004 Section 2.4.5.3. Slopes greater than 1 in 4 will require a vehicular barrier or wheel stop. · Designers are advised to consult the National Construction Code 2016 to determine if pedestrian handrails or safety barriers compliant with the NCC2016 are also required in the parking module this area may be considered as a path of access to a building.
Reason for condition
To ensure the safety of users of the access driveway and parking module and compliance with the standard.
ENG 3a
The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area) must be designed and constructed in accordance with Australian Standard AS/NZS2890.1:2004 (including the requirement for vehicle safety barriers where required), or a Council approved alternate design certified by a suitably qualified engineer to provide a safe and efficient access, and enable safe, easy and efficient use.
Advice: · It is advised that designers consider the detailed design of the access and parking module prior to finalising the Finished Floor Level (FFL) of the parking spaces (especially if located within a garage incorporated into the dwelling), as failure to do so may result in difficulty complying with this condition.
Reason for condition
To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard.
ENG 3b
The bicycle parking design must be submitted and approved, prior to the, issuing of any approval under the Building Act 2016 (excluding demolition).
The bicycle parking design must:
1. Be prepared and certified by a suitably qualified engineer. 2. Be
generally in accordance with the Australian Standard AS/NZS2890.3:2015. 3. Where
the design deviates from AS/NZS2890.3:2015 the
designer must demonstrate that the design will provide a safe and efficient access, and
enable safe,
easy and efficient use. 4. Show dimensions and other details as Council deem necessary to satisfy the above requirement.
Advice: · Once the design
has been approved, the Council will
issue a condition endorsement (see general advice on how
to obtain condition endorsement) · Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard.
ENG 3c
The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area) must be constructed in accordance with the design drawings approved by Condition ENG tr1 and the approved plans (and+design, Andrew Mckellar Design, drawing no. 20.0717.1.1D and 20.0717.1.2D, submitted 12 December 2018).
Prior to the first occupation, documentation by a suitably qualified engineer certifying that the access driveway and parking module has been constructed in accordance with the above drawings must be lodged with Council.
Advice: · Certification may be submitted to Council as part of the Building Act 2016 approval process or via condition endorsement (see general advice on how to obtain condition endorsement)
Reason for condition
To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard.
ENG 4
The access driveway and parking module (car parking spaces, aisles and manoeuvring area) approved by this permit must be constructed to a sealed standard (spray seal, asphalt, concrete, pavers or equivalent Council approved) and surface drained to the Council's stormwater infrastructure prior to the first occupation.
Reason for condition
To ensure the safety of users of the access driveway and parking module, and that it does not detract from the amenity of users, adjoining occupiers or the environment by preventing dust, mud and sediment transport.
ENG 5
The number of car parking spaces approved on the site, for use is sixty eight (68), including two (2) parking spaces for people with disabilities.
All parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white or yellow pavement markers in accordance with Australian Standards AS/NZS 2890.1 2004 and AS/NZS 2890.6: 2009, prior to first occupation.
Reason for condition
To ensure the provision of parking for the use is safe and efficient.
ENG 6
The number of bicycle parking spaces approved on the site is a minimum of forty six (46).
The bicycle parking areas must be constructed on the site compliant with the Australian Standards AS/NZS 2890.3:2015 prior to the commencement of the use.
Reason for condition
To ensure safe and efficient parking adequate to provide for the use.
ENG 7
The number of motorbike parking spaces approved on the site is a minimum of twenty seven (27). The motorcycle parking areas must be constructed on the site compliant with the Australian Standards AS/NZS 2890.1:2004 prior to the commencement of the use
Reason for condition
To ensure safe and efficient parking adequate to provide for the use.
ENG 8
The use of the car parking spaces approved by this permit is restricted to residential, domestic and employee parking associated with operations within the site.
A sign, approved by Council, and in accordance with Australian Standards AS/NZS1742.11:2016, must be erected at the entry of the parking access to indicate the parking area is for residents only prior to first occupation.
Reason for condition
In the interests of vehicle user safety and the amenity of the development.
ENG 9
All car parking spaces for people with disabilities must be delineated to Australian/NZS Standard, Parking facilities Part 6: Offstreet parking for people with disabilities AS/NZS 2890.6: 2009, prior to the commencement of the use.
Reason for condition
In the interests of vehicle user safety and the amenity of the development.
ENG 10
The driveway, access, parking and manoeuvring area design must be signed by a suitably qualified engineer, certifying the driveway, access, parking and manoeuvring areas have been constructed in accordance with the design drawings, must be lodged with the Council prior to the issuing of any Completion or Occupancy Certificate under the Building Act 2016.
Reason for condition
To ensure the safety of users of the access / parking / highway reservation / adjacent properties.
ENG 1
The cost of repair of any damage to the Council's infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council. Any damage must be immediately reported to Council.
A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.
A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, preexisting damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.
Reason for condition
To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.
ENG s1
The use of each tandem/jockey car parking space is restricted to serve the same dwelling and must not be designated for visitor or disabled parking.
Reason for condition
In the interests of vehicle user safety and the amenity of the development.
ENG s2
All garbage collection associated with the development must occur wholly within the site, therefore, onstreet garbage collection by private contractors within the Council's Burnett Street Highway Reservation is prohibited.
Reason for condition
To ensure the safety of vehicles entering and leaving the development and the safety and access around the development site for the general public and adjacent businesses.
ENV 2
Sediment and erosion control measures, sufficient to prevent sediment leaving the site and in accordance with an approved soil and water management plan (SWMP), must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.
A SWMP must be submitted prior to the issue of any approval under the Building
Act 2016 or the commencement of work, whichever occurs first. The SWMP must
be prepared in accordance with a) the Soil and Water
Management on Building and Construction Sites fact
sheets (Derwent Estuary Program, 2008), available here. b) the recommendations of any Contamination Management Plan or Environmental Site Assessment required.
All work must be undertaken in accordance with the approved SWMP and this condition.
Advice: Once the SWMP has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.
ENV s1
Units 1, 2, 3, 4, 16 and 17 on levels
3, 4 and 5 must have: · concrete panel facades; · bifold doors sufficient to allow complete enclose of their balconies; · inoperable windows where practicable; · casement or awning windows, with good acoustic seals on the entire perimeter that are positively engaged when shut; · minimum 6/12/6 double glazing with laminated panes for all window and door glazing (excluding balconies); and · minimum 6mm laminated glazing for all balcony glazing.
Plans submitted for building approval must demonstrate compliance with this condition.
Reason for condition
To ensure that new sensitive use does not conflict with, interfere with or constrain uses with potential to cause environmental harm.
HER 6
The Statement of Archaeological Potential and Archaeological Method Statement produced by Tasarc dated 5th June 2018 must be implemented in full in accordance with the recommendations of the report. Within the Zones identified as being of medium to high potential, all onsite excavation and disturbance must be conducted and monitored by a suitably qualified archaeologist.
All and any recommendations made by the archaeologist engaged in accordance with above must be complied with in full; and all features and/or deposits discovered must be reported to the Council within 2 working days of the discovery; and a copy of the archaeologist's advice, assessment and recommendations obtained in accordance with above must be provided to Council within 5 working days of receipt of the advice, assessment, and recommendations. Excavation and/or disturbance must not recommence unless and until approval is granted from the Council.
Reason for condition
To ensure that work is planned and implemented in a manner that seeks to understand, retain, protect, preserve and manage significant archaeological evidence.
HER 17
The palette of exterior colours and materials must reflect the primary palette of materials and colours within the local streetscape and precinct.
Prior to the issue of any approval under the Building Act 2016, revised plans must be submitted and approved showing exterior colours and materials in accordance with the above requirement.
All work required by this condition must be undertaken in accordance with the approved plans.
Reasons for condition
To ensure that development at a heritage precinct is undertaken in a sympathetic manner which does not cause loss of historic cultural heritage significance. To assist in reducing the apparent visual bulk of the development.
ENVHE 1
1. The advice and recommendations made in the Environmental Site Assessment (GeoEnvironmental Solutions 66 Burnett Street, North Hobart dated December 2017 Amended 11 January 2018), must be implemented prior to commencement of construction of the proposed new development. Reports for subsequent environmental site assessments must be submitted to Council and must be to the satisfaction of Council's Environmental Health Officer.
2. The Contamination Management Plan (GeoEnvironmental Solutions 66 Burnett Street North Hobart December 2017) must be implemented and if new information becomes available during the subsequent environmental site assessment undertaken prior to construction, that it be updated and implemented accordingly.
Reason for condition
To ensure the subject land is capable of supporting the proposed development and future use in terms of site contamination issues.
ENVHE 4
A construction management plan must be implemented throughout the construction works.
A construction management plan must be submitted and approved prior to the issuing of any building permit under the Building Act 2016. The plan must include but is not limited to the following:
1. Identification and disposal of any potentially contaminated waste and asbestos;
2. Proposed hours of work (including volume and timing of heavy vehicles entering and leaving the site, and works undertaken on site);
3. Proposed
hours of construction; 4. Identification of potentially noisy construction phases, such as
operation of rock breakers, explosives or
pile drivers, and
proposed means to minimise impact on the amenity of neighbouring buildings; 5. Control of dust and
emissions during working hours; 6. Proposed screening of
the site and vehicular access points during work; and 7. Procedures for washing down vehicles, to prevent soil and debris being carried onto the street.
All work required by this condition must be undertaken in accordance with the approved construction management plan.
Reason for condition
To ensure minimal impact on the amenity of adjoining properties and members of the public during the construction period.
SURV 8
The applicant, at no cost to the Council, must have prepared, entered into, and have registered at the Land Titles Office, a deed pursuant to Section 75CA of the Conveyancing and Law of Property Act 1884 for the awning encroachment over Elizabeth Street, prior to the issue of a completion certificate.
Advice: A Section 75CA Conveyancing & Law of Property Act 1884 certificate for the occupation of a Highway requires that the encroachment is a minimum 2.40 metres above the footpath or 4.25 metres above the road carriageway. A 600mm set back from the back of kerb may also be required.
The applicant must prepare and forward the required instrument pursuant to section 75CA Conveyancing & Law of Property Act 1884, including a survey plan of the encroachment (certified by a registered surveyor), the associated $220 Council application fee and the Land Titles Office registration fee, to the Council for execution and subsequent registration within the Land Titles Office.
Reason for condition
To ensure that the proposed or existing building encroachment over Elizabeth Street is formalised in accordance with statutory provisions.
ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
CONDITION ENDORSEMENT ENGINEERING
All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP:
Value of Building Works
Approved by Planning Permit Fee: · Up to $20,000:
$150 per application. · Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.
These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations.
Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.
Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information. This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.
PLUMBING PERMIT
You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.
OCCUPATION OF THE PUBLIC HIGHWAY
You may require an occupational license for structures in the Hobart City Council highway reservation, in accordance with conditions to be established by the Council. Click here for more information.
GENERAL EXEMPTION (TEMPORARY) PARKING PERMITS
You may qualify for a General Exemption permit for construction vehicles i.e. residential or meter parking/loading zones. Click here for more information.
PERMIT TO CONSTRUCT PUBLIC INFRASTRUCTURE
You may require a permit to construct public infrastructure, with a 12 month maintenance period and bond (please contact the Hobart City Council's City Infrastructure Division to initiate the permit process).
STORM WATER
Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information.
WORK WITHIN THE HIGHWAY RESERVATION
Please note development must be in accordance with the Hobart City Council’s Highways By law. Click here for more information.
DRIVEWAY SURFACING OVER HIGHWAY RESERVATION
If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future.
REDUNDANT CROSSOVERS
Redundant crossovers are required to be reinstated under the Hobart City Council’s Highways By law in accordance with TSD R14 , TSD 16 and TSD R11 at the developer's cost. Click here for more information.
WORK PLACE HEALTH AND SAFETY
Appropriate occupational health and safety measures must be employed during the works to minimise direct human exposure to potentiallycontaminated soil, water, dust and vapours. Click here for more information. PROTECTING THE ENVIRONMENT
In accordance with the Environmental Management and Pollution Control Act 1994, local government has an obligation to "use its best endeavours to prevent or control acts or omissions which cause or are capable of causing pollution." Click here for more information.
LEVEL 1 ACTIVITIES
The activity conducted at the property is an environmentally relevant activity and a Level 1 Activity as defined under s.3 of the Environmental Management and Pollution Control Act 1994. For further information on what your responsibilities are, click here.
NOISE REGULATIONS
Click here for information with respect to noise nuisances in residential areas.
FEES AND CHARGES
Click here for information on the Council's fees and charges.
DIAL BEFORE YOU DIG
Click here for dial before you dig information.
|
||||||||||||||||||||||||
|
DEPUTY LORD MAYOR BRISCOE That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
9.2 125 Bathurst Street, Hobart - Partial Demolition, Alterations and Redevelopment for General Retail and Hire, Food Services and 33 Multiple Dwellings - PLN-18-530 File Ref: F19/8886 Ref: Open CPC 7.1.2, 29/01/2019 |
|||||||||||||||||||||||||
|
That: Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for partial demolition, alterations and redevelopment for general retail and hire, food services and 33 multiple dwellings at 125 Bathurst Street, Hobart for the reasons outlined in the officer’s report, attached to item 7.1.2 of the Open City Planning Committee agenda of 29 January 2019 and a permit containing the following conditions be issued: GEN The
use and/or development must be substantially in accordance with the documents
and drawings that comprise PLN-18-530 - 125 BATHURST STREET HOBART TAS 7000 -
Final Planning Documents except where modified below. TW The
use and/or development must comply with the requirements of TasWater as
detailed in the form Submission to Planning Authority Notice, Reference No.
TWDA 2018/01336-HCC dated 22/08/2018 as attached to the permit. PLN 15 A
demolition waste management plan must be implemented throughout demolition.
PLN s1 Prior
to the issue of any approval under the Building Act 2016 (excluding
demolition or excavation), plans must be submitted and approved showing
exterior colours and materials to the satisfaction of the Director City
Planning. PLN s2
A landscaping
plan must be submitted and approved by the Director City Planning prior to
the issue of any approval under the Building Act 2016. 1. Show the species and number of the trees, shrubs and plants for all landscaped areas shown on the application's final planning documents;
2. Include mature trees and shrubs to reflect those shown on the photomontages that form part of the application's final planning documents;
3. Show the location and dimensions of all associated garden beds and planters, including dimensioned elevations/sections of all associated planters showing their relationship to apartment and property boundaries.
ENG sw1 All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to first occupation.
Reason for
condition ENG sw4 Stormwater must be directed to Council infrastructure with
sufficient receiving capacity. Any new stormwater connection
required must be constructed and existing redundant connections be
abandoned and sealed. These works must be done at the
owner’s expense, prior to the first occupation or issue of any
completion (whichever occurs first).
Detailed engineering drawings must be submitted and approved, prior to commencement of work or any consent under the Building Act 2016 (whichever occurs first). The detailed engineering drawings must include: 1. The location of the proposed connections and all existing connections, including any shared connections; 2. The size and design of a single connection per Lot to Council's piped infrastructure such that it is appropriate to safely service the development; 3. An Indicative long-section of the proposed connection clearly showing clearances from any nearby services, cover, size, material and delineation of public and private infrastructure. Connections must be free-flowing gravity.
Advice: · A single connection for each Lot is required under the Urban Drainage Act 2013. Council has some records of the shared private systems burdening the property. · The applicant is advised to submit detailed design drawings via a Council City Infrastructure Division application for a new stormwater connection. If detailed design to satisfy this condition is submitted via the planning condition endorsement process there may be fees associated with the assessment, and once approved the applicant will still need to submit an application for a new stormwater connection with Council City Infrastructure Division. · Where building / plumbing approval is also required, it is recommended that documentation to satisfy this condition is submitted well before submitting documentation for building/plumbing approval. Failure to address planning condition requirements prior to submitting for building/plumbing approval may result in unexpected delays.
ENG tr1 Traffic management within the access driveway, circulation
roadway and parking module (parking spaces and aisles) must be installed
prior to the commencement of the use. 1. Be prepared by a suitably qualified person. 2. Signage indicating that the car parking area is a private car park. 3. Pedestrian safety bollards for egress to/from lifts and doorways.
4. Delineation of pedestrian pathways along the shared vehicular circulation roadway (including access to both tenancies off of the circulation roadway). 5. Include line marking and signage defining the turning area. 6. Warning devices (both active and static) at the car park exit to alert drivers and pedestrians on Trafalgar Place that a vehicle is exiting the car park. 7. Warning devices on the approaches to the service lift doors on all levels of the car park advising drivers that they may encounter a pedestrian at the lift.
· Once the traffic management design drawings have been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement and associated fees).
ENG tr2 A construction traffic and parking management plan must be
implemented prior to the commencement of work on the site (including
demolition).
1. Be prepared by a suitably qualified person. 2. Develop a communications plan to advise the wider community of the traffic and parking impacts during construction. 3. Include a start date and finish dates of various stages of works. 4. Include times that trucks and other traffic associated with the works will be allowed to operate. 5. Nominate a superintendant, or the like, to advise the Council of the progress of works in relation to the traffic and parking management with regular meetings during the works.
· The applicant is required submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain condition endorsement and for fees and charges]). This is a separate process to any building approval under the Building Act 2016.
· Once the construction traffic and parking management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
· Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
· It is noted that if the development is proposed to progress in stages, that a construction traffic and parking management plan may be submitted for just that stage which addresses the traffic and parking issues relevant to that particular stage.
ENG 3a The access driveway, circulation roadways and parking
module (parking spaces, aisles and manoeuvring area) must be designed and
constructed in accordance with Australian Standard AS/NZS2890.1:2004
(excluding circulation roadway width which should be a minimum 5.2m wide). · It is advised that designers consider the detailed design of the access and parking module prior to finalising the Finished Floor Level (FFL) of the parking spaces (especially if located within a garage incorporated into the dwelling), as failure to do so may result in difficulty complying with this condition.
· The reduced two way circulation roadway width pinch point of 5.2m (with a 4m wide garage door) has been approved on the basis that onsite turning is provided such that any conflict between entering and exiting vehicles is by forward travelling vehicles.
ENG 5 The number of parking spaces approved on the site is: 1. Three (3) User Class 1A car parking spaces. 2. A minimum of one (1) bicycle parking space.
1. All car parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white or yellow pavement markers in accordance with Australian Standards AS/NZS 2890.1 2004. 2. All bicycle parking spaces must be installed in accordance with AS/NZS 2890.3 2015 (Security Class C).
ENG 1 The
cost of repair of any damage to the Council's infrastructure resulting from
the implementation of this permit, must be met by the owners within 30 days
of the completion of the development or as otherwise determined by the
Council. Any damage must be immediately reported to
Council. ENV 2 Sediment
and erosion control measures, sufficient to prevent sediment leaving the site
and in accordance with an approved soil and water management plan (SWMP),
must be installed prior to the commencement of work and maintained until such
time as all disturbed areas have been stabilised and/or restored or sealed to
the Council’s satisfaction.
HER 6 All onsite excavation and disturbance within the area
identified as being of moderate archaeological potential within
Fig.23 of the Statement of Archaeological Potential produced by Austral
Tasmania, dated 30 July 2018 must be monitored by a suitably qualified archaeologist.
Should any features or deposits of an archaeological nature be discovered on
the site during excavation or disturbance: 1. All excavation and/or disturbance must stop immediately; and 2. A qualified archaeologist must provide advice and assessment of the features and/or deposits discovered and make recommendations on further excavation and/or disturbance; and 3. All and any recommendations made by the archaeologist engaged in accordance with (2) above must be complied with in full; and 4. All features and/or deposits discovered must be reported to the Council with 3 days of the discovery; and 5. A copy of the archaeologist's advice, assessment and recommendations obtained in accordance with paragraph (2) above must be provided to Council within 10 days of receipt of the advice, assessment and recommendations.
ENVHE 1 The following must be submitted and approved prior to the
issue of any approval under the Building Act 2016 (excluding
demolition): 1. A contamination Environmental Site Assessment report prepared by a suitably qualified and experienced person in accordance with the procedures and practices detailed in the National Environment Protection (Assessment of Site Contamination) Measure 1999 (NEPM) as amended 2013 must be provided. The report must conclude: 1. Whether any site contamination presents a risk to workers involved in redevelopment of the site, or future users of the site, as a result of proposed excavation of the site. 2. Whether any site contamination presents an environmental risk from excavation conducted during redevelopment of the site. 3. Whether any specific remediation and/or protection measures are required to ensure proposed excavation does not adversely impact human health or the environment before excavation commences. 2. If the Environmental Site Assessment report concludes that remediation and/or protection measures are necessary to avoid risks to human health or the environment, a proposed remediation and/or management plan must be submitted. Any remediation or management plan involving soil disturbance must include a detailed soil and water management plan to prevent off-site transfer of potentially-contaminated soil or stormwater. 3. A statement based on the results of the Environmental Site Assessment that the excavation as part of the planned works will not adversely impact on human health or the environment is to be provided (subject to implementation of any identified remediation and/or protection measures as required).
ENVHE 4 A construction management plan must be implemented
throughout the construction works. 1. Identification and disposal of any potentially contaminated waste and asbestos. 2. Proposed hours of work (including volume and timing of heavy vehicles entering and leaving the site, and works undertaken on site). 3. Proposed hours of construction. 4. Identification of potentially noisy construction phases, such as operation of rock- breakers, explosives or pile drivers, and proposed means to minimise impact on the amenity of neighbouring buildings. 5. Control of dust and emissions during working hours. 6. Proposed screening of the site and vehicular access points during work. 7. Procedures for washing down vehicles, to prevent soil and debris being carried onto the street.
ADVICE The
following advice is provided to you to assist in the implementation of the
planning permit that has been issued subject to the conditions above. The
advice is not exhaustive and you must inform yourself of any other
legislation, by-laws, regulations, codes or standards that will apply to your
development under which you may need to obtain an approval. Visit the
Council's website for further information. CONDITION ENDORSEMENT ENGINEERING All engineering drawings required to be submitted and
approved by this planning permit must be submitted to the City of Hobart as a
CEP (Condition Endorsement) via the City’s Online
Service Development Portal. When lodging a CEP, please reference the PLN number of the
associated Planning Application. Each CEP must also include an estimation of
the cost of works shown on the submitted engineering drawings. Once that
estimation has been confirmed by the City’s Engineer, the following
fees are payable for each CEP submitted and must be paid prior to the City of
Hobart commencing assessment of the engineering drawings in each CEP: · Up to $20,000: $150 per application. · Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.
BUILDING PERMIT You
may need building approval in accordance with the Building Act
2016. Click here for more
information. PLUMBING PERMIT You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information. OCCUPATION OF THE PUBLIC HIGHWAY You may require a Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information. NEW SERVICE CONNECTION Please contact the Hobart City Council's City Infrastructure Division to initiate the application process for your new stormwater connection. STORM WATER Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information. STRUCTURES CLOSE TO DRAINS OR WITHIN EASEMENTS Any works within 1m of any private third-party pipes or within service easements will need separate permission under s73 and s74 of the Building Act 2016.
REDUNDANT CROSSOVERS Redundant crossovers are required to be reinstated under the Hobart City Council’s Highways By law. Click here for more information. ACCESS Designed
in accordance with LGAT- IPWEA – Tasmanian standard drawings.
Click here for more information. CROSS
OVER CONSTRUCTION WEED CONTROL Effective measures are detailed in the Tasmanian Washdown Guidelines for Weed and Disease Control: Machinery, Vehicles and Equipment (Edition 1, 2004). The guidelines can be obtained from the Department of Primary Industries, Parks, Water and Environment website. NOISE REGULATIONS Click here for information with respect to noise nuisances in residential areas. WASTE DISPOSAL It
is recommended that the developer liaise with the Council’s Cleansing
and Solid Waste Unit regarding reducing, reusing and recycling materials
associated with demolition on the site to minimise solid waste being directed
to landfill. FEES AND CHARGES Click here for information on the Council's fees and charges. DIAL BEFORE YOU DIG Click here for dial before you dig information.
|
||||||||||||||||||||||||
|
DEPUTY LORD MAYOR SHERLOCK That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
9.3 Pirie Street and New Town Road, New Town and Road Reserve - Bus Shelter PLN-18-802 - File Ref: F19/7554 Ref: Open CPC 7.1.3, 29/01/2019 Application Expiry Date: 14 February 2019 Extension of Time: Not applicable |
|||||||||||||||||||||||||||
|
That: Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for a bus shelter at Pirie Street and New Town Road, New Town and road reserve for the reasons outlined in the officer’s report, attached to item 7.1.3 of the Open City Planning Committee agenda of 29 January 2019 and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN18802 185187 NEW TOWN ROAD NEW TOWN TAS 7008 except where modified below.
Reason for condition
To clarify the scope of the permit.
ENG sw1
All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to first occupation or commencement of use (whichever occurs first).
Reason for condition
To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.
ENG sw3
The proposed bus shelter footings must be designed to ensure the protection of the Council’s storm water main.
A detailed design must be submitted and approved prior to construction. The detailed design must:
1. Demonstrate how the design will ensure the protection of the Council’s stormwater main. (see advice section of permit)
All work required by this condition must be undertaken in accordance with the approved detailed design.
Advice: · The applicant may submit detailed design documentation to satisfy this
condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see
general advice on how to obtain condition endorsement and for
fees and charges]). This is a
separate process to
any building approval under the Building
Act 2016. · Failure to address condition requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To ensure the protection of the Council’s hydraulic infrastructure.
ENG sw4
The new storm water connection must be constructed, prior to the first occupation.
Detailed engineering drawings must be submitted and approved, prior to commencement of work. The detailed engineering drawings must include:
1. the location of the proposed connection; and
2. the size of the connection appropriate to satisfy the needs of the development.
All work required by this condition must be undertaken in accordance with the approved detailed engineering drawings.
Advice: · The applicant is advised to submit
detailed design drawings via a Council City Infrastructure Division application for a new stormwater connection. If detailed
design to satisfy this condition is submitted via the planning condition endorsement process there may be fees associated with the assessment, and
once approved the
applicant will still
need to submit
an application for a new stormwater connection with Council City Infrastructure
Division. · Where building / plumbing approval is also required, it is recommended that documentation to satisfy this condition is submitted well before submitting documentation for building/plumbing approval. Failure to address planning condition requirements prior to submitting for building/plumbing approval may result in unexpected delays.
Reason for condition
To ensure the site is drained adequately.
ENG 1
Any damage to council infrastructure resulting from the implementation of this permit, must, at the discretion of the Council:
1. Be met by the owner
by way of reimbursement (cost of repair and
reinstatement to be
paid by the
owner to the
Council); or 2. Be repaired and reinstated by the owner to the satisfaction of the Council.
A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.
A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, preexisting damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.
Reason for condition
To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.
ENV 1
Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site, and maintained until all areas of disturbance have been stabilized or revegetated.
Advice: For further guidance in preparing a Soil and Water Management Plan – in accordance with Fact sheet 3 Derwent Estuary Program click here.
Reason for condition
To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State legislation.
ENVHE 2
A contamination Environmental Site Assessment report prepared by a suitably qualified and experienced person in accordance with the procedures and practices detailed in the National Environment Protection (Assessment of Site Contamination) Measure 1999 (NEPM) as amended 2013 must be submitted to council prior to commencement of work. The report must conclude:
· Whether any site contamination presents a risk to workers
involved in redevelopment of the site, or future users of the site, as a result
of proposed excavation of
the site. · Whether any site contamination presents an environmental risk from
excavation conducted during
redevelopment of the
site. · Whether any specific remediation and/or protection measures are required
to ensure proposed excavation does not adversely impact human health
or the environment before excavation commences. · Based on the results of the Environmental Site Assessment that the excavation as part of the planned works will not adversely impact on human health or the environment (subject to implementation of any identified remediation and/or protection measures as required).
If the Environmental Site Assessment report concludes that remediation and/or protection measures are necessary to avoid risks to human health or the environment, a proposed remediation and/or management plan must be submitted prior to commencement of work. Any remediation or management plan involving soil disturbance must include a detailed soil and water management plan to prevent offsite transfer of potentiallycontaminated soil or stormwater.
Reason for condition
To determine the level of site contamination, and to identify any recommended remediation/management practices/safeguards which need to be followed/put in place during any excavations/ground disturbance on, or for use of the site, to provide for a safe living environment.
ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
CONDITION ENDORSEMENT PLANNING
If a condition endorsement is required by a planning condition above, you will need to submit the relevant documentation to satisfy the condition via the Condition Endorsement Submission on Council's online services eplanning portal.
Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Once approved, the Council will respond to you via email that the condition has been endorsed (satisfied). Detailed instructions can be found here.
CONDITION ENDORSEMENT ENGINEERING
All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP:
Value of Building Works Approved by Planning Permit Fee: · Up to $20,000:
$150 per application. · Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.
These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations.
Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.
Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information.
This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.
OCCUPATION OF THE PUBLIC HIGHWAY
You may require an occupational license for structures in the Hobart City Council highway reservation, in accordance with conditions to be established by the Council. Click here for more information.
You may require a Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information.
WORK PLACE HEALTH AND SAFETY
Appropriate occupational health and safety measures must be employed during the works to minimise direct human exposure to potentially contaminated soil, water, dust and vapours. Click here for more information.
FEES AND CHARGES
Click here for information on the Council's fees and charges.
DIAL BEFORE YOU DIG
Click here for dial before you dig information.
|
||||||||||||||||||||||||||
|
DEPUTY LORD MAYOR HARVEY That the recommendation be adopted. |
||||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
9.4 2 Churchill Avenue, Sandy Bay - Temporary Buildings for Residential College PLN-18-929 - File Ref: F19/10854 Ref: Special Open CPC 2.1.1, 4/02/2019 Application Expiry Date: 18 February 2019 Extension of Time: Not applicable |
|||||||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for temporary buildings for residential college at 2 Churchill Avenue, Sandy Bay for the reasons outlined in the officer’s report and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN18929 2 CHURCHILL AVENUE SANDY BAY TAS 7005 Final Planning Documents, except where modified below.
Reason for condition
To clarify the scope of the permit.
TW
The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2018/02107HCC dated 03/01/2019 as attached to the permit.
Reason for condition
To clarify the scope of the permit.
PLN s1
If the temporary student accommodation sought under PLN1920 is approved, the temporary student accommodation approved by this permit (PLN18929) must not commence, or continue to operate, while the temporary student accommodation use under PLN1920 (if approved) is occurring on the site.
Advice: Building works for this permit (PLN18929) may be completed whilst the Temporary Student Accommodation sought under PLN1920 is in use. This condition only prevents the two facilities from being occupied concurrently. This condition does not imply or guarantee approval of PLN1920.
Reason for condition
To ensure that adequate car parking is provided for the potential number of residents on the site.
PLN s2
This permit is valid for a maximum period of five (5) years from the approval date. At the completion of this period all development associated with this permit must be removed, and the site made good.
Advice: For the purposes of this condition the approval date is 04 February 2019. Five years from this date is 04 February 2024.
Reason for condition
To clarify the scope of the permit in accordance with the application documentation.
ENG sw1
All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to first occupation or commencement of use (whichever occurs first).
Reason for condition
To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.
ENG sw4
The new stormwater connection must be constructed, prior to the first occupation.
Detailed engineering drawings must be submitted and approved, prior to any plumbing approval under the Building Act 2016. The detailed engineering drawings must include:
1. The
location of the proposed connection; 2. The
size of the
connection appropriate to
satisfy the needs
of the development; 3. The shape
and size of any headwall, referencing IPWEA LGAT Tasmanian Standard Drawings where relevant; and 4. The erosion control measures proposed.
All work required by this condition must be undertaken in accordance with the approved detailed engineering drawings.
Advice: · The applicant is advised to submit
detailed design drawings via a Council City Infrastructure Division application for a new stormwater connection. If detailed
design to satisfy this condition is submitted via the planning condition endorsement process there may be fees associated with the assessment, and
once approved the
applicant will still
need to submit
an application for a new stormwater connection with the Council’s City Infrastructure
Division. · Where building / plumbing approval is also required, it is recommended that documentation to satisfy this condition is submitted well before submitting documentation for building/plumbing approval. Failure to address planning condition requirements prior to submitting for building/plumbing approval may result in unexpected delays.
Reason for condition
To ensure the site is drained adequately.
ENG sw7
Stormwater pretreatment for storm water discharges from the development must be installed prior to commencement of use.
The stormwater pretreatment system must incorporate a treatment system of a size and design sufficient to achieve the stormwater quality targets in accordance with the State Stormwater Strategy 2010. The treatment system may be via water sensitive urban design (SWUD) or mechanical treatment system. The stormwater pretreatment system must be maintained for the life of the development.
Stormwater pretreatment design (including calculations) must be submitted and approved by the Council, prior to any plumbing approval under the Building Act 2016. The design must:
1. Be
prepared by a suitably qualified person; 2. Demonstrate how
stormwater quality targets will be achieved; and 3. Include supporting maintenance plan.
All work required by this condition must be undertaken in accordance with the approved design.
Advice: · The applicant is required to submit
detailed design documentation to satisfy this condition via the Council's planning condition endorsement process
(noting there is a fee
associated with condition endorsement approval of
engineering drawings [see
general advice on how to obtain condition endorsement and for
fees and charges]). This is a separate process to any plumbing approval under the Building Act 2016. · Once the design has been approved the
Council will issue a condition endorsement. · Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To avoid the possible pollution of drainage systems and natural watercourses, and to comply with relevant State legislation.
ENG sw8
A 25,000 litre stormwater detention system must be installed to limit stormwater discharges from the development to 20L/s for a 5 minute 5% AEP storm event, prior to first occupation
A detailed detention design must be submitted and approved by the Council, prior to the issuing of any plumbing approval under the Building Act 2016. The design must:
1. Be
prepared by a
suitably qualified engineer; 2. Include design
drawings of the
detention tank showing the layout, the inlet and outlet (including long section), the overflow mechanism;
and 3. Include a Stormwater Management Summary Plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; cleanout procedures; descriptions and diagrams of how the installed systems operate; details of the life of assets and replacement requirements.
All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and design.
Advice: · The applicant is required to submit
detailed design documentation to satisfy this condition via the Council's planning condition endorsement process
(noting there is a fee
associated with condition endorsement approval of
engineering drawings [see
general advice on how to obtain condition endorsement and for
fees and charges]). This is a separate process to any plumbing approval under the Building Act 2016. · Once the stormwater management report and design has been approved the Council
will issue a condition endorsement. · It is advised that documentation for condition endorsement is lodged well before a Building / Plumbing Permit is required, as failure to address design requirements until Building / Plumbing Permit stage may result in unexpected delays.
Reason for condition
To ensure that the stormwater runoff quantity is managed to take into account the limited receiving capacity of the downstream the Council’s stormwater infrastructure.
ENG tr2
A construction traffic and parking management plan must be implemented prior to the commencement of work on the site (including demolition).
The construction traffic (including cars, public transport vehicles, service vehicles, pedestrians and cyclists) and parking management plan must be submitted and approved, prior to any approval under the Building Act 2016 (including demolition). The construction traffic and parking management plan must:
1. Be prepared by a suitably qualified person; 2. Develop
a communications plan
to advise the
wider community of
the traffic and parking
impacts during construction; 3. Include
a start date and finish
dates of various stages of works;
4. Include
times that trucks and other traffic associated with the works will
be allowed to
operate; and 5. Nominate a superintendent, or the like, to advise the Council of the progress of works in relation to the traffic and parking management with regular meetings during the works.
All work required by this condition must be undertaken in accordance with the approved construction traffic and parking management plan.
Advice: Once the construction traffic and parking management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To ensure the safety of vehicles entering and leaving the development and the safety and access around the development site for the general public and adjacent businesses.
ENG 2a
Prior to first occupation or commencement of use (whichever occurs first), vehicular barriers compliant with the Australian Standard AS/NZS1170.1:2002 must be installed to prevent vehicles running off the edge of an access driveway or parking module (parking spaces, aisles and manoeuvring area) where the drop from the edge of the trafficable area to a lower level is 600mm or greater, and wheel stops (kerb) must be installed for drops between 150mm and 600mm. Barriers must not limit the width of the driveway access or parking and turning areas approved under the permit.
Advice: · The Council
does not consider a slope
greater than 1 in 4 to constitute a lower level as described in AS/NZS
2890.1:2004 Section 2.4.5.3. Slopes greater than 1 in 4 will require a vehicular barrier or wheel stop. · Designers are advised to consult the National Construction Code 2016 to determine if pedestrian handrails or safety barriers compliant with the NCC2016 are also required in the parking module this area may be considered as a path of access to a building.
Reason for condition
To ensure the safety of users of the access driveway and parking module and compliance with the standard.
ENG 4
Any proposed or modified access driveway, circulation roadways or parking module (car parking spaces, aisles and manoeuvring area) approved by this permit must be constructed to a sealed standard (spray seal, asphalt, concrete, pavers or equivalent Council approved) and surface drained to the Council's stormwater infrastructure prior to the commencement of use.
Reason for condition
To ensure the safety of users of the access driveway and parking module, and that it does not detract from the amenity of users, adjoining occupiers or the environment by preventing dust, mud and sediment transport.
ENG 5
The number of parking spaces within the site allocated to residential college tenants must include:
1. A minimum number of car
parking spaces of
one hundred and
ninety seven (197) (via residential parking permits); 2. A minimum number of accessible car parking spaces of two (2);
3. A minimum number of motorcycle parking spaces of three (3);
and 4. A minimum number of Class B (AS2890.3) bicycle parking spaces of ten (10).
Advice: · The
minimum car parking spaces was calculated via the following: 124 existing college
precinct spaces plus
34 commerce building car park residential
permit spaces minus 36 spaces removed to allow accommodation construction plus 75 additional commerce building car
park residential permit spaces. · It is recommended to allocate parking spaces in blocks such that tenants from different residential housing unit have a similar walking distance to their car parking space.
· It is noted that the Commerce Building car park will be allocated for residential college parking. Any proposed future use of the Commerce Building will need to take into consideration the lack of parking from a planning scheme perspective.
Reason for condition
To ensure the provision of parking for the use is safe and efficient.
ENG 1
Any damage to council infrastructure resulting from the implementation of this permit, must, at the discretion of the Council:
1. Be met by the owner
by way of reimbursement (cost of repair and
reinstatement to be
paid by the
owner to the
Council); or 2. Be repaired and reinstated by the owner to the satisfaction of the Council.
A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.
A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, preexisting damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.
Reason for condition
To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.
ENG s1
The free University shuttle bus between Mount Nelson, the College Precinct, UTas Campus, Hunter Street Fine Arts Centre and the Menzies Centre must remain operational whilst the temporary accommodation is in use.
Advice: This condition is intended to ensure residential college tenants have adequate shuttle bus services to meet transportation needs for study purposes. The intent is not to require 24/7 shuttle bus operation, but that operation should be maintained at or more frequently than the current shuttle bus arrangements. Shuttle bus services should not operate 24/7 as this may cause a detriment to amenity of the surrounding area.
Reason for condition
To ensure the car parking demand is reduced and that regular car parking overspill does not occur.
ENG s2
All commercial vehicle (delivery and waste removal) activities associated with the proposed development must be via existing commercial loading bays located within the site, or new facilities which comply with Australian Standard AS2890.2:2002.
Reason for condition
To ensure that acceptable facilities for commercial vehicles are provided on site.
ENG s3
Baintree Avenue vehicular access not to be used for vehicular access to the proposed development.
Prior to occupancy, temporary bollards (or a Council Approved alternative) must be installed on the circulation roadway within 2m of the property boundary to prevent vehicular access from the southernmost Baintree Avenue vehicular access.
Reason for condition
To ensure that access to the site is safe and efficient.
ENV 15
All construction vehicles and machinery must be effectively cleaned of soil, mud and plant matter before entering the property.
Soil, mud and plant matter cleaned from construction vehicles and machinery must not be allowed, either directly or indirectly, to enter waterways or the Council’s stormwater system.
Note: further information on effective measures for washdown can be found here.
Reason for condition
To minimise the spread of weeds and pathogens.
ENV 2
Sediment and erosion control measures, in accordance with an approved soil and water management plan (SWMP), must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.
A SWMP must be submitted prior to the issue of any approval under the Building Act 2016 or the commencement of work, whichever occurs first. The SWMP must be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008), available here.
All work required by this condition must be undertaken in accordance with the approved SWMP.
Advice: Once the SWMP has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.
ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
CONDITION ENDORSEMENT ENGINEERING
All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP:
Value of Building Works Approved by Planning Permit Fee:
· Up to $20,000:
$150 per application. · Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.
These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations.
Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.
Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information.
This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.
PLUMBING PERMIT
You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.
NEW SERVICE CONNECTION
Please contact the Hobart City Council's City Infrastructure Division to initiate the application process for your new stormwater connection.
STORM WATER
Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information.
WEED CONTROL
Effective measures are detailed in the Tasmanian Washdown Guidelines for Weed and Disease Control: Machinery, Vehicles and Equipment (Edition 1, 2004). The guidelines can be obtained from the Department of Primary Industries, Parks, Water and Environment website.
NOISE REGULATIONS
Click here for information with respect to noise nuisances in residential areas.
FEES AND CHARGES
Click here for information on the Council's fees and charges.
DIAL BEFORE YOU DIG
Click here for dial before you dig information.
|
||||||||||||||||||||||||||
|
DEPUTY LORD MAYOR BRISCOE That the recommendation be adopted. |
||||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
10. Monthly Building Statistics - 1 December 2018 - 31 December 2018 File Ref: F19/6415 Ref: Open CPC 8.1, 29/01/2019 |
|||||||||||||||||||||||||||
|
That the Director City Planning reports:
A. 1. During the period 1 December 2018 to 31 December 2018, 50 permits were issued to the value of $16,640,861 which included:
(i) 30 for Extensions/Alterations to Dwellings to the value of $8,597,444;
(ii) 6 New Dwellings to the value of $2,445,895; and
(iii) 3 Major Projects: (a) 284-290 Elizabeth Street, Hobart - Apartments, Carpark and Public Assembly - $6,570,862; (b) 2 Cross Street, New Town – Sacred Heart College – Alterations and Additions - $1,800,000; (c) 96 Bathurst Street, Hobart - UTAS (Mid City Hobart) - Student Accommodation -Alterations -$1,400,000 2. During the period 1 December 2017 to 31 December 2017, 59 permits were issued to the value of $17,209,292 which included:
(i) 25 Extensions/Alterations to Dwellings to the value of $2,932,284
(ii) 12 New Dwellings to the value of $4,919,330; and
(iii) 3 Major Projects: (a) 119-119A New Town Road , New Town - Demolition and New Development for Food Services and 16 Multiple Dwellings - $4,900,000; (b) 8A Romily Street, South Hobart - New Building (9 Units) - $2,385,000; (c) 38 Argyle Street, Hobart - Alterations and Additions (Kemp Street) - $1,480,0008 B. 1. In the twelve months ending 31 December 2018, 648 permits were issued to the value of $521,061,352; and
2. In the twelve months ending 31 December 2017, 714 permits were issued to the value of $256,556,651.
|
||||||||||||||||||||||||||
|
DEPUTY LORD MAYOR THOMAS
That the recommendation be adopted. |
||||||||||||||||||||||||||
|
MOTION CARRIED
VOTING RECORD
|
11. kunanyi/Hobart Visitation Policy and Strategy File Ref: F18/137624 Ref: Open EDCC 6.1, 24/01/2019 |
|||||||||||||||||||||||||||
|
That: 1. The Council agree in principle to develop a tourism strategy for the City of Hobart subject to consultation with the State Government and appropriate tourism stakeholder groups. 2. The scope of the strategy be reported back to the Council.
|
||||||||||||||||||||||||||
|
THOMAS SEXTON That the recommendation be adopted. |
||||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
Supplementary item 13 was then taken.
That the Council resolve by absolute majority that the meeting be closed to the public pursuant to regulation 15(1) of the Local Government (Meeting Procedures) Regulations 2015 because the items included on the closed agenda contain the following matters:
· Leave of absence. · A personnel matter.
The following items were discussed:-
Item No. 1 Minutes of the last meeting of the Closed Portion of the Council Meeting Item No. 2 Communication from the Chairman Item No. 3 Leave of Absence Item No. 4 Consideration of supplementary Items to the agenda Item No. 5 Indications of pecuniary and conflicts of interest Item No. 6 2018 Accountabilities and Key Priorities Progress Report LG(MP)R 15(2)(a)
HARVEY SEXTON
That the recommendation be adopted.
|
||||||||||||||||||||||||||
MOTION CARRIED VOTING RECORD
|
Item 12 was then taken.
There being no further business the meeting closed at 6:30 pm.
TAKEN AS READ AND SIGNED AS A CORRECT RECORD
THIS
18th DAY OF FEbruary 2019.
CHAIRMAN