Minutes

SPECIAL Open COUNCIL

Monday, 29 October 2018

AT 5:30 pm

Council Chamber, Town Hall


 

Minutes (Open Portion)

Special Council Meeting

Page 2

 

29/10/2018

 

 

 ORDER OF BUSINESS

 

PRESENT, APOLOGIES AND LEAVE OF ABSENCE

1.        Indications of Pecuniary and Conflicts of Interest. 4

Reports of Committee. 5

City Planning Committee

2.        Council Acting as Planning Authority. 5

2.1     10 Evans Street, Hobart and 6 Evans Street, Hobart and Adjacent Road Reserve - Cycleway Extension and Associated Works. 5

2.2     17 Beach Road, Sandy Bay & Includes Area Of Foreshore Of River Derwent Adjacent 17 Beach Road, Sandy Bay - Partial Demolition, Alterations, Extensions, Vegetation Removal, New Building For Change Rooms and Associated Works. 11

Motions of which notice has been given

3.        Standards and Controls for Residential Developments in Non-Residential Zones. 21

 


 

Minutes (Open Portion)

Special Council Meeting

Page 4

 

29/10/2018

 

 

PRESENT:

 

The Lord Mayor Alderman R G Christie, The Deputy Lord Mayor Alderman Dr P T Sexton, Aldermen M Zucco, J R Briscoe, Dr E R Ruzicka, H C Burnet, P S Cocker, D C Thomas, A M Reynolds, T M Denison and W F Harvey.

 

APOLOGIES:

Nil.

 

LEAVE OF ABSENCE:

Nil.

 

 

 

The Lord Mayor addressed the Chamber in the following terms:

 

Aldermen, I would like to take this opportunity to thank you for your cooperation in this Chamber over the past six months. History now shows five occasions where a Hobart Lord Mayor has not served a full term.  In 1859, 1869, 1922, 59 years ago when Sir Archibald Park died in office and was replaced by Deputy Lord Mayor Basil Osborne, and now in 2018, when Lord Mayor Sue Hickey stepped down as Lord Mayor  and entered State politics.

Council meetings in this chamber over the past six months have run efficiently and productively and I thank you for that.  Tomorrow evening the community of Hobart will have an idea who their new Lord Mayor and Deputy Lord Mayor will be.  With 11 contenders, it will make for an interesting evening and I’m sure, an interesting outcome. 

I personally thank the General Manager and all Directors for your assistance in this Chamber. It could not function without your contribution.  Speaking of contributions, I would like to acknowledge the contribution to this Council and to the community of Hobart of two Aldermen – Alderman Dr Eva Ruzicka and Alderman Philip Cocker.


Alderman Dr Eva Ruzena Ruzicka was first elected to Council on the 26 March 1999, 19 Years, 7 months 3 days ago.

Alderman Ruzicka served as Deputy Lord Mayor 1 November 2002 until 29 October 2009.

Alderman Ruzicka served on the following committees;

·         Finance & Governance Committee (Joint Chair - Governance)

·         Finance Committee

·         City Planning

·         Parks & Recreation

·         Parks & Customer Services

·         City Infrastructure

·         Heritage Account Special Committee

·         Economic Development and Communications

·         Strategic Governance Committee (Chair)

·         Development and Environmental Services

·         Infrastructure Services

·         Audit Committee

·         Finance and Corporate Services

·         Policy and Inter-government


 

Alderman Philip Scott Cocker was first elected to Council on the 28 October 2005, 13 Years, 1 day ago.  Happy anniversary for yesterday.

Alderman Cocker Served on the following committees:

·         Finance Committee (Chair)

·         Finance and Corporate Services Committee (Chair)

·         Infrastructure Services Committee

·         Strategic Governance Committee

·         Governance Committee

·         City Infrastructure

·         Audit Committee (Chair)

·         Risk and Audit Panel

·         Creative Hobart Special Committee

·         Hobart City Council Arts Advisory Special Committee

·         Hobart City Council Public Art Special Committee

·         Community Culture and Events

·         Economic Development and Communications (Chair)

·         Finance & Governance

Alderman, officers, ladies and gentlemen would you please show your appreciation to these two Hobart Aldermen.

 

 

1.       Indications of Pecuniary and Conflicts of Interest

Ref: Part 2, Regulation 8(7) of the Local Government (Meeting Procedures) Regulations 2015.

 

Aldermen are requested to indicate where they may have any pecuniary or conflicts of interest in respect to any matter appearing on the agenda, or any supplementary item to the agenda, which the committee has resolved to deal with.

 

No interest was indicated.OR

 

 

Reports of Committee

 

City Planning Committee

 

2.       Council Acting as Planning Authority

 

In accordance with the provisions of Part 2 Regulation 25 of the Local Government (Meeting Procedures) Regulations 2015, the intention of the Council to act as a planning authority pursuant to the Land Use Planning and Approvals Act 1993 is to be noted.

 

In accordance with Regulation 25, the Council will act as a planning authority in respect to those matters appearing under this heading on the agenda, inclusive of any supplementary items.

 

The Council is reminded that in order to comply with Regulation 25(2), the General Manager is to ensure that the reasons for a decision by a Council or Council Committee acting as a planning authority are recorded in the minutes.

 

2.1      10 Evans Street, Hobart and 6 Evans Street, Hobart and Adjacent Road Reserve - Cycleway Extension and Associated Works

            PLN-18-505 - File Ref: F18/121250

Ref:    Open CPC 7.1.1, 29/10/2018

Application Expiry Date: 7 December 2018

Extension of Time: Not applicable

 

That:   Pursuant to the Sullivans Cove Planning Scheme 1997, the Council approve the application for cycleway extension and associated works at 6 and 10 Evans Street, Hobart, and the adjacent road reserve, for the reasons outlined in the officer’s report, attached to item 7.1.1 of the Open City Planning Committee agenda of 29 October 2018, and a permit containing the following conditions be issued:

 

GEN

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­18­505 ­ 10 EVANS STREET HOBART TAS 7000 ­ Final Planning Documents, except where modified below.

 

Reason for condition

 

To clarify the scope of the permit.

 

TW

 

The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2018/01315­HCC dated 23/08/2018 as attached to the permit.

 

Reason for condition

 

To clarify the scope of the permit.

 

ENG sw1

 

All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to commencement of use.

 

Reason for condition

 

To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.

 

ENG 1

 

The cost of repair of any damage to the Council's infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre­existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

Reason for condition

 

To ensure that any of the Council's infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENG s1

 

Prior to the commencement of works within Evans Street, Davey Street and possible minor works in Tasman Highway provide detail plans.

 

In Davey Street the plans must show:

1.    Show plan view of the proposed works including any new signage.

2.    Show any existing infrastructure that maybe affected.

3.    Show levels to ensure that proposed works will match into the existing shared use path.

 

In Tasman Highway the plans must show:

1.    How the proposed works will integrate into the existing shared use path.

2.    Detail any changes required with the existing shared use path to facilitate this proposal.

 

In Evans Street the plans must show:

1.    Plan view of the proposed works including any new signage.

2.    Any existing infrastructure that maybe affected.

3.    Detail the levels of the proposed and existing paths, kerbs, ramps and median island.

4.    Submit a lighting plan of existing light levels showing if it meets the requirements for the proposed median island, to the satisfaction of the Director City Infrastructure by a suitably qualified person.

5.    If light levels are required to be increased either by changing the light on the existing light pole to the west of the path or a new light pole required, this shall be undertaken in accordance with TasNetworks requirements to the satisfaction of the Director City infrastructure by a suitable qualified person.

 

All works required by this condition must be undertaken at the developers cost in accordance with the approved plans.

 

Advice: once the plans have been approved Council will issue a condition endorsement and a permit from the City must be obtained by the contractor for works within the highway reservation to undertake the works.

 

Reason for condition

 

To ensure the City infrastructure is protected.

 

HER 6

 

All onsite excavation and disturbance must be monitored. Should any features or deposits of an archaeological nature be discovered on the site during excavation or disturbance:

 

1.    All excavation and/or disturbance must stop immediately; and

2.    A qualified archaeologist must be engaged to attend the site and provide advice and assessment of the features and/or deposits discovered and make recommendations on further excavation and/or disturbance; and

3.    All and any recommendations made by the archaeologist engaged in accordance with (2) above must be complied with in full; and

4.    All features and/or deposits discovered must be reported to the Council within 24 hours of the discovery; and

5.    A copy of the archaeologists advice, assessment and recommendations obtained in accordance with paragraph (2) above must be provided to Council within 7 days of receipt of the advice, assessment and recommendations.

 

Excavation and/or disturbance must not recommence unless and until approval is granted from the Council.

 

Reason for condition

 

To ensure that work is planned and implemented in a manner that seeks to understand, retain, protect, preserve and manage significant archaeological evidence.

 

ENVHE 1

 

Recommendations in the report 'Site Environmental Management Plan' by AECOM dated 17 November 2015 must be implemented for the duration of the proposed excavation works.

 

Reason for condition

 

To ensure that the risk to human health and the environment is suitably managed during excavation works.

 

ADVICE

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

CONDITION ENDORSEMENT ENGINEERING

 

All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP:

 

Value of Building Works Approved by Planning Permit Fee:

 

·     Up to $20,000: $150 per application.

·     Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.

 

These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations.

 

Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.

 

Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed.

 

BUILDING PERMIT

 

You may need building approval in accordance with the Building Act 2016. Click here for more information.

 

This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.

 

PLUMBING PERMIT

 

You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.

 

PERMIT TO CONSTRUCT PUBLIC INFRASTRUCTURE

 

You may require a permit to construct public infrastructure, with a 12 month maintenance period and bond (please contact the Hobart City Council's City Infrastructure Division to initiate the permit process).

 

ACCESS

 

Designed in accordance with LGAT­ IPWEA Tasmanian standard drawings. Click here for more information.

 

CROSS OVER CONSTRUCTION

 

The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design. Click here for more information.

 

DIAL BEFORE YOU DIG

 

Click here for dial before you dig information.

 

 

 

Briscoe

Burnet                                                  That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Christie

 

Deputy Lord Mayor Sexton

 

Zucco

 

Briscoe

 

Ruzicka

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

 

 

2.2      17 Beach Road, Sandy Bay & Includes Area Of Foreshore Of River Derwent Adjacent 17 Beach Road, Sandy Bay - Partial Demolition, Alterations, Extensions, Vegetation Removal, New Building For Change Rooms and Associated Works

            PLN-18-492 - File Ref: F18/122971

Ref:    Open CPC 7.2.1, 29/10/2018

Application Expiry Date: 5 November 2018

Extension of Time: Not applicable

 

That:   Pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for partial demolition, alterations, extensions, vegetation removal, new building for change rooms and associated works at 17 Beach Road, Sandy Bay and includes area of foreshore of River Derwent and adjacent 17 Beach Road, Sandy Bay for the reasons outlined in the officer’s report, attached to item 7.2.1 of the Open City Planning Committee agenda of 29 October 2018, and a permit containing the following conditions be issued:

 

GEN

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­18­492 ­ 17 BEACH ROAD & INCLUDES AREA OF FORESHORE OF RIVER DERWENT ADJACENT TO 17 BEACH ROAD SANDY BAY TAS 7005 ­ Final Planning Documents except where modified below.

 

Reason for condition

 

To clarify the scope of the permit.

 

TW

 

The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2018/01406­HCC dated 17 September 2018 as attached to the permit.

 

Reason for condition

 

To clarify the scope of the permit.

 

ENG sw6

 

Stormwater disposal for stormwater runoff from the site adequate for all 5% AEP events must be installed prior to commencement of use or issue of a Certificate of Completion (whichever occurs first). All costs associated with works required by this condition are to be met by the owner.

 

A stormwater management report and design drawings must be submitted and approved prior to the issuing of any consent under the Building Act or commencement of works (whichever occurs first).

 

The stormwater management report and design drawings must:

 

1.    Be prepared by a suitably qualified and experienced person;

2.    Include a Site and Soil evaluation, including soil permeability, depth to groundwater, minimum setbacks from features such as boundaries, sewer trenching and footings.

3.    Include detailed design and supporting calculations of the soakage trenches.

4.    Include a Stormwater Management Summary Plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; cleanout procedures; descriptions and diagrams of how the installed systems operate; details of the life of assets and replacement requirements.

 

All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and design.

 

Advice: The applicant is advised to submit detailed design drawings and calculations as part of their Plumbing Permit Application. If detailed design to satisfy this condition is submitted via the planning condition endorsement process there may be fees associated with the assessment, and once approved the applicant will still need to obtain a plumbing permit for the works.

 

Reason for condition

 

To ensure adequate stormwater storage and soakage capacity.

 

ENG 12

 

The alterations to the car parking must be generally designed and constructed in accordance with the Australian Standard Parking facilities, Part 1: Off­Street Carparking, AS 2890.1 2004 or a Council approved alternative design, prior to commencement of use.

 

 

 

Design drawings must be submitted and approved by Council's Director City Infrastructure and Council's Director Parks and City Amenity, prior to issue of any building consent under the Building Act 2016 or commencement of work, whichever occurs first. The design drawings must include but limited to:

 

1.    Show all parking bays to be removed and the method used for concealing the existing line marking.

2.    Show the provision of pavement arrows for the control and direction of circulating traffic within the car park.

3.    Show the bollard type and installation details.

4.    Show one parking space for people with disabilities as close as practicable to the entry point of the building and in accordance to Australian/NZS standard, Parking facilities Part 6: Off­street parking for people with disabilities AS/NZS 2890.6:2009.

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

Advice: Once the design drawing has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Please contact Council's City Infrastructure Division Manager Traffic Engineering to determine suitable location for the provision of the car parking space for people with disabilities. The car parking space for people with disabilities may replace existing car parking spaces.

 

Please contact Council's City Infrastructure Division Road Services Engineer with regard to the accepted method for concealing existing linemarking, provision of pavement arrows and the type of bollards to be installed.

 

Reason for condition

 

To ensure that the parking layout for the development is to accepted standards.

 

 

ENG 1

 

The cost of repair of any damage to the Council's infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council. Any damage must be reported immediately to Council.

 

A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre­existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

Reason for condition

 

To ensure that any of the Council's infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENV 2

 

Sediment and erosion control measures, sufficient to prevent sediment leaving the site and in accordance with an approved soil and water management plan (SWMP), must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.

 

A SWMP must be submitted prior to the issue of any approval under the Building Act 2016 or the commencement of work, whichever occurs first. The SWMP must be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008), available here.

 

All work required by this condition must be undertaken in accordance with the approved SWMP.

 

Advice: Once the SWMP has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.

 

ENV s1

 

The white gum on the western side of the existing building must not be removed unless the prior written consent of the Director Parks and City Amenity is obtained.

 

Unless the prior written consent of the Director Parks and City Amenity is obtained to remove the tree, an approved Tree Protection Plan must be implemented.

 

Prior to the commencement of works and prior to the granting of consent under the Building Act 2016, a Tree Protection Plan must be submitted and approved, unless the prior written consent of the Director Parks and City Amenity is obtained to remove the tree.

 

The plan (if required) must:

 

·     Identify potential risks to the health and structural stability of the tree from the proposed development; and

 

·     Include tree protection measures to be followed during the development to minimise the risk of significant impacts to the health and structural stability of the tree.

 

Advice: Once the Tree Protection Plan has been approved, or evidence that the Director Parks and City Amenity has granted approval to remove the tree has been provided, Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.

 

Reason for condition

 

To ensure that impact on erosion potential resulting from the removal of native vegetation is negligible

 

 

OPS 1

 

The boundary of the applicant’s lease must be clearly marked by the owner on the ground before any works commence.

 

Reason for condition

 

To protect the values of the Council’s reserve Long Beach Reserve.

 

 

OPS s1

 

The applicant will be responsible for the cost of re­instatement or rehabilitation of any impacts and/or damage caused to Long Beach Reserve and its values and assets by works undertaken by the developer that are outside of those approved in this permit.

 

Reason for condition

 

To protect the values of the Councils reserve Long Beach Reserve.

 

 

 

OPS s2

 

Any vegetation to be removed must be paid for by the developer prior to the commencement of use. To determine the cost of vegetation being removed, a valuation is to be undertaken to the satisfaction of the Director, Parks and City Amenity and at full cost to the developer.

 

Vegetation removal must be in accordance with the recommendations of a Coastal Hazards Inundation Report by a suitably qualified professional. Plantings in excess of the vegetation removed must be undertaken to the satisfaction of the Director, Parks and City Amenity.

 

Advice: Council is currently undertaking a Coastal Hazards Inundation Report that will assist in the implementation of this condition.

 

Reason for condition

 

To protect the values of the Council's reserve, Long Beach Reserve.

 

ADVICE

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

CONDITION ENDORSEMENT ENGINEERING

 

All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP:

 

Value of Building Works Approved by Planning Permit Fee:

 

·     Up to $20,000: $150 per application.

 

·     Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.

 

These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations.

 

Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.

 

Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed.

 

BUILDING PERMIT

 

You may need building approval in accordance with the Building Act 2016. Click here for more information.

 

 

This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.

 

PLUMBING PERMIT

 

You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.

 

STORM WATER

 

Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information.

 

WASTE DISPOSAL

 

It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill.

 

Further information regarding waste disposal can also be found on the Council’s website.


FEES AND CHARGES

 

Click here for information on the Council's fees and charges.

 

DIAL BEFORE YOU DIG

 

Click here for dial before you dig information.

 

 

 

 

Briscoe

Thomas                                                  That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Christie

 

Deputy Lord Mayor Sexton

 

Zucco

 

Briscoe

 

Ruzicka

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

 

 

 

 

 

Motions of which notice has been given

 

IN ACCORDANCE WITH REGULATION 16(5) OF THE LOCAL GOVERNMENT (MEETING PROCEDURES) REGULATIONS 2015

 

3.         Standards and Controls for Residential Developments in Non-Residential Zones

            File Ref: F18/122726; 13-1-9

Ref:    Open CPC 9.1, 29/10/2018

 

 That a report be prepared on what standards and controls that might be applied to residential development occurring in Zones other than the Residential Zone, and specifically with regard to the trend for multiple dwelling inner city living complexes impacting on existing and future residential amenity values.

 

 

RUZICKA

COCKER                                                           That the motion be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Christie

          Denison

Deputy Lord Mayor Sexton

 

Zucco

 

Briscoe

 

Ruzicka

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Harvey

 

      

 

There being no further business the meeting closed at 5.53pm.

 

 

 

TAKEN AS READ AND SIGNED AS A CORRECT RECORD THIS
19th DAY OF November 2018.

CHAIRMAN