Minutes
Open Portion
Monday, 16 December 2019
AT 5:00 pm
Council Chamber, Town Hall
|
Minutes (Open Portion) Council Meeting |
Page 3 |
|
16/12/2019 |
|
PRESENT, APOLOGIES AND LEAVE OF ABSENCE
3. Communication from the Chairman
4. Notification of Council Workshops
7. Consideration of Supplementary Items
8. Indications of Pecuniary and Conflicts of Interest
9. Council Acting as Planning Authority
9.1 19 Plaister Court, Sandy Bay - Change of Use to Visitor Accommodation
9.2 40 Melville Street, 44 Melville Street, Adjacent Road Reserve, Hobart
9.3 2 Davies Avenue (Queens Domain, Council Facilities), Hobart - Bin Storage Shelter
9.6 31-31a & 33 New Town Road, New Town - Partial Demolition, Extension and Alterations
9.7 11 Denison Street, South Hobart - Partial Demolition, Alterations, Extension and Front Fencing
Motions of which notice has been given
11. Elizabeth Street Bus Mall - South West Side Upgrade
12. Huon Road - Uphill Bicycle Passing Opportunity Project
13. Campbell Street and Argyle Street Bicycle Connections
Community, Culture and Events Committee
15. Aboriginal Commitment and Action Plan - Final Endorsement
17. Social Inclusion Index - Connected Community Program
18. Public Art - From the Shadows Submission
Finance and Governance Committee
19. City of Hobart Multi-Storey Car Parks - Removal of Early Bird Parking
Parks and Recreation Committee
20. Draft City to Gardens Way Connectivity and Wayfinding Plan - Community Engagement
21. Wilson Street, North Hobart - Proposed Upgrade to Pocket Park.
24. Closed Portion of the Meeting
|
Minutes (Open Portion) Council Meeting |
Page 21 |
|
16/12/2019 |
|
PRESENT:
The Lord Mayor Councillor A M Reynolds, Deputy Lord Mayor Councillor H Burnet, Aldermen M Zucco, J R Briscoe, D C Thomas, T M Denison, Councillor W F Harvey, Alderman S Behrakis, Councillors M S C Dutta, H A Ewin and Z R Sherlock.
APOLOGIES:
Nil.
LEAVE OF ABSENCE:
Alderman Dr P T Sexton.
Alderman Behrakis left the meeting at 6.36pm, returning at 6.38pm.
Alderman Zucco left the meeting at 6.55pm, returning at 6.59pm and was not present for item 16.
Councillor Sherlock left the meeting at 7.05pm, returning at 7.07pm.
Councillor Dutta left the meeting at 8.02pm prior to the substantive vote for item 19, returning following the adjournment.
The Chairman reports that she has perused the minutes of the meeting of the Open Portion of the Council meeting held on Monday, 2 December 2019, finds them to be a true record and recommends that they be taken as read and signed as a correct record.
Ewin That the recommendation be adopted. |
||||||||||||||||||||||||
MOTION CARRIED VOTING RECORD
The minutes were signed. |
Are there any items, which the meeting believes, should be transferred from this agenda to the closed agenda or from the closed agenda to the open agenda, in accordance with the procedures allowed under Section 15 of the Local Government (Meeting Procedures) Regulations 2015?
No items were transferred.
Burnet
BRISCOE
That items 9.4, 9.5 and 9.7 be taken first under item 9.
MOTION CARRIED
VOTING RECORD
AYES |
NOES |
Lord Mayor Reynolds |
|
Deputy Lord Mayor Burnet |
|
Zucco |
|
Briscoe |
|
Thomas |
|
Denison |
|
Harvey |
|
Behrakis |
|
Dutta |
|
Ewin |
|
Sherlock |
|
In accordance with the requirements of the Local Government (Meeting Procedures) Regulations 2015, the General Manager reports that no Council workshops have been conducted since the last ordinary meeting of the Council.
|
Mr Lohberger put the following question and was provided with the corresponding response by the Lord Mayor.
Questions:
Less than six months ago, the Council voted to declare a Climate Emergency. At the most recent Council meeting, seven members who voted to declare an emergency also voted to investigate three new Sister City relationships, in a debate that included bickering about budget allocations.
Travel to any of the three cities under consideration will involve more than three tonnes of carbon emissions, per person.
Do elected members truly believe we are in climate emergency and, if so, why are they not taking steps to reduce their own flight-related carbon emissions?
Do the elected members accept that City relationships involve far more than international flights, and can exist without them?
Response:
Elected members opt to travel when there is a strong reason to do so and only if the budget allows.
Based on previous experience, the city, on average, visits its sister or friendship city every three and a half years. Any visit requires a decision made by the Council, and an appropriate budget being available. All Elected Members must stay within a $6,000 per 4 year term allocation for sister city engagement.
Whether the Council has two sister cities or six sister cities, the budget allocated to Elected Members does not change.
From experience built from managing international relationships, the oldest of which is 42 years, the Council believes that face to face contact cannot always be replaced by other forms of communication for four reasons:
1. Travelling to a sister or friendship city is a strong demonstration of commitment to the relationship which results in investment in projects and school connections.
2. In travelling to a place, elected members and officers are able to understand it more deeply than via desk research.
3. Meeting fellow officers and elected members face to face helps to develop trust and strong working relationships.
4. Tools such as Skype, Webchat and email are used to bridge the gap between visits but given cultural and language barriers, emails, skype and webchat can create confusion and delays, all of which can be overcome quickly in person.
Having said this, the vast majority of inter-state and international Council business is undertaken via correspondence, telephone, video-conferencing, or local meetings wherever possible.
In the case of many of our sister city relationships – much of the activity and connection is built through the work and projects of community groups, schools and businesses from both cities finding common ground. In many cases Council simply provides the framework for these connections.
When flying is considered appropriate for Elected Members, it often represents just a small fraction of the time and effort invested into the relationship.
When isolated as a single activity, yes there is no doubt that flights do create carbon emissions, but so do many activities. For example driving a car is another activity that Elected Members do as part of their work. It is estimated that a typical passenger car emits 4.6 tonnes of carbon dioxide per year.
I have no doubt that Elected Members who are concerned about climate change weigh up all of these issues before making a decision to fly nationally or internationally. Once you are aware of the impact of climate change, there are many decisions you make every day where you weigh up the strategic impact of the action and whether the carbon emissions can be justified. Elected Members are able to opt to purchase carbon offsets for their flights booked through Council. While some people are rightly concerned about the value of carbon offsets invested in tree planting projects, there are a number of flight offset providers who provide investment in energy and transport projects that meet the international Gold Standard (see - https://www.goldstandard.org).
While offsets will never be the same as not flying at all, they are a credible alternative for the business traveller who has made an assessment that the face-to-face journey is strategically important.
Mr Lohberger then put the following supplementary questions which the Lord Mayor took on notice.
Questions:
Will the tool being developed to measure benefits of sister city relationships include a section that measures the specific benefit or not, of international delegations? Is it true that one of the sister cities investigated, before this matter came before Council, offered an e-relationship that involved no flights? |
No petitions were received.
Ref: Part 2, Regulation 8(6) of the Local Government (Meeting Procedures) Regulations 2015.
That the Council resolve to deal with any supplementary items not appearing on the agenda, as reported by the General Manager in accordance with the provisions of the Local Government (Meeting Procedures) Regulations 2015.
No supplementary items were received.
|
Ref: Part 2, Regulation 8(7) of the Local Government (Meeting Procedures) Regulations 2015.
Elected Members are requested to indicate where they may have any pecuniary or conflicts of interest in respect to any matter appearing on the agenda, or any supplementary item to the agenda, which the Council has resolved to deal with.
No interest was indicated.
In accordance with the provisions of Part 2 Regulation 25 of the Local Government (Meeting Procedures) Regulations 2015, the intention of the Council to act as a planning authority pursuant to the Land Use Planning and Approvals Act 1993 is to be noted.
In accordance with Regulation 25, the Council will act as a planning authority in respect to those matters appearing under this heading on the agenda, inclusive of any supplementary items.
The Council is reminded that in order to comply with Regulation 25(2), the General Manager is to ensure that the reasons for a decision by a Council or Council Committee acting as a planning authority are recorded in the minutes.
Item 9.4 was then taken.
9.1 19 Plaister Court, Sandy Bay - Change of Use to Visitor Accommodation PLN-19-697 - File Ref: F19/152582 Ref: Open CPC 7.1.1, 9/12/2019 Application Expiry Date: 12 January 2020 |
|||||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council refuse the application for change of use to visitor accommodation at 19 Plaister Court Sandy Bay for the following reasons:
1. The proposal does not meet the acceptable solution or the performance criterion with respect clauses A1 and P1 of Planning Directive 6 Exemption and Standards for Visitor Accommodation in Planning Schemes because the visitor accommodation use is not compatible with the character and use of the area, and causes an unreasonable loss of residential amenity having regard to (c) the scale of the use and its compatibility with the surrounding character and uses within the area. |
||||||||||||||||||||||||
|
Briscoe
That in accordance with the applicants request, the application withdrawn. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
COUNCIL RESOLUTION: |
||||||||||||||||||||||||
|
That in accordance with the applicants request, the item be withdrawn from the agenda. |
9.2 40 Melville Street, 44 Melville Street, Adjacent Road Reserve, Hobart PLN-19-689 - File Ref: F19/154906 Ref: Open CPC 7.1.5, 9/12/2019 Application Expiry Date: 17 December 2019 |
|||||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for alterations to approved development and tree removal at 4044 Melville Street, Hobart and adjacent road reserve for the reasons outlined in the officer’s report, attached to item 7.1.5 of the Open City Planning Committee agenda of 9 December 2019 and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN19689 40 MELVILLE STREET HOBART TAS 7000 Final Planning Documents except where modified below.
Reason for condition
To clarify the scope of the permit.
PLN s1
The proposed works approved under this permit must be undertaken in accordance with the relevant conditions of the associated planning permit PLN18422 dated 8 October 2018.
Reason for condition
To clarify the scope of the permit
ENG sw1
All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to first occupation or commencement of use (whichever occurs first).
Advice: Under section 23 of the Urban Drainage Act 2013 it is an offence for a property owner to direct stormwater onto a neighbouring property.
Reason for condition
To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.
ENG sw4
Any new stormwater connection must be constructed and existing abandoned connections sealed by the Council at the owner’s expense, prior to issue of a Certificate of Completion or the first occupation, whichever occurs first.
Detailed engineering drawings must be submitted and approved, prior to commencement of work. The detailed engineering drawings must be check and certified by a qualified and experienced engineer and include:
1. the location of the proposed connection(s) and all existing connection(s); 2. the size and design of the connection appropriate to satisfy the needs of the development given the limited receiving capacity of Council infrastructure; 3. longsections of the proposed connection clearly showing any nearby/crossing services, cover size, material and delineation of public and private infrastructure; and 4. clarification between public and private infrastructure;
All work required by this condition must be undertaken in accordance with the approved detailed engineering drawings.
Advice:
The applicant is advised to submit detailed design drawings via a Council City Amenity Division application for a new stormwater connection. If detailed design to satisfy this condition is submitted via the planning condition endorsement process there may be fees associated with the assessment, and once approved the applicant will still need to submit an application for a new stormwater connection with Council City Amenity Division.
Where building / plumbing approval is also required, it is recommended that documentation to satisfy this condition is submitted well before submitting documentation for building/plumbing approval. Failure to address planning condition requirements prior to submitting for building/plumbing approval may result in unexpected delays.
Reason for condition
To ensure the site is drained adequately.
ENG 1
Any damage to Council infrastructure resulting from the implementation of this permit, must, at the discretion of the Council:
1. Be met by the owner by way of reimbursement (cost of repair and reinstatement to be paid by the owner to the Council); or 2. Be repaired and reinstated by the owner to the satisfaction of the Council.
A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.
A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, preexisting damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.
Reason for condition
To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.
ENGR 3
Prior to the commencement of use, the proposed driveway crossover to Melville Street highway reservation must be designed and constructed at the developer's cost and generally in accordance with:
· LGAT Standard Drawing Commercial Urban TSDR09v1 – Urban Roads Driveways and TSD R16v1 Type KCR & B1 or Type KCRB & B1 · LGAT Standard Drawing Footpath Urban Roads Footpaths TSDR11v1 · Or a Council City Infrastructure Division approved alternate design.
Design drawings must be submitted and approved prior to the commencement of work. The design drawing must:
1. Show the cross and long section of the driveway crossover within the highway reservation and onto the property 2. Detail any services or infrastructure (ie light poles, pits, awnings) at or near the proposed driveway crossover 3. Be designed for the expected vehicle loadings. A structural certificate to note that driveway is suitable for heavy vehicle loadings. 4. Show swept path templates in accordance with AS/NZS 2890.2 2002 (for largest anticipated vehicle to access the site). 5. If the design deviates from the requirements of the TSD then the drawings must demonstrate that the largest anticipated vehicle to access the site can access the driveway from the road pavement into the property without scraping the underside of the vehicle. 6. Be prepared and certified by a suitable qualified person, to satisfy the above requirement.
All work required by this condition must be undertaken in accordance with the approved drawings.
Advice:
The applicant is required submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain condition endorsement and for fees and charges]). This is a separate process to any building approval under the Building Act 2016.
Local Government Association (LGAT) Tasmanian Standard Drawings (TSD) can be viewed electronically via the LGAT Website.
Please contact Council's City Amenity Division to discuss approval of alternate designs.
You are likely to require a Permit to Open Up and Temporarily Occupy a Highway (for works within the highway reservation)
Reason for condition
To ensure that works will comply with the Council’s standard requirements.
OPS s1
The Alnus glutinosa and Fraxinus angustifolia street trees adjacent to the development must be retained and protected from damage during the works.
Prior to commencement of tree removal works, the amenity value of the third street tree, the Acer rubrum identified for removal in plan 10573_DA002 Issue F, must be paid by the developer to the City of Hobart. The amenity fee for this tree is $1,160. To arrange payment of this fee, please contact Council's Open Space Planning Team on 6238 2488.
The developer must carry out and pay for all works associated with the removal of this street tree.
A replacement street tree must be planted, to the satisfaction of the City's Director City Amenity, within 12 months of the issue of this planning permit, or such further period as approved in writing by the Director City Amenity. The developer will bear the costs of the replacement tree and its planting.
Reason for condition
To maintain the amenity value of street trees as per the City of Hobart Street Tree Strategy and the amenity value calculation method endorsed by a meeting of the full Council on the 18th February 2019.
ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
CONDITION ENDORSEMENT ENGINEERING
All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP:
Value of Building Works Approved by Planning Permit Fee: Up to $20,000: $150 per application.
Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.
These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations.
Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.
Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information.
This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.
PLUMBING PERMIT
You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.
OCCUPATION OF THE PUBLIC HIGHWAY
You may require a permit for the occupation of the public highway for construction or special event (e.g. placement of skip bin, crane, scissor lift etc). Click here for more information.
You may require an occupational license for structures in the Hobart City Council highway reservation, in accordance with conditions to be established by the Council. Click here for more information.
You may require a road closure permit for construction or special event. Click here for more information.
You may require a Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information.
NEW SERVICE CONNECTION
Please contact the Hobart City Council's City Amenity Division to initiate the application process for your new stormwater connection.
STORMWATER
Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Infrastructure By law. Click here for more information.
WORK WITHIN THE HIGHWAY RESERVATION
Please note development must be in accordance with the Hobart City Council’s Infrastructure By law. Click here for more information.
CBD AND HIGH VOLUME FOOTPATH CLOSURES
Please note that the City of Hobart does not support the extended closure of public footpaths or roads to facilitate construction on adjacent land.
It is the developer's responsibility to ensure that the proposal as designed can be constructed without reliance on such extended closures.
In special cases, where it can be demonstrated that closure of footpaths in the CBD and/or other high volume footpaths can occur for extended periods without unreasonable impact on other businesses or the general public, such closures may only be approved by the full Council.
For more information about this requirement please contact the Council's Traffic Engineering Unit on 6238 2804.
DRIVEWAY SURFACING OVER HIGHWAY RESERVATION
If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future.
ACCESS
Designed in accordance with LGAT IPWEA – Tasmanian standard drawings. Click here for more information.
CROSS OVER CONSTRUCTION
The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design. Click here for more information.
FEES AND CHARGES
Click here for information on the Council's fees and charges.
DIAL BEFORE YOU DIG
Click here for dial before you dig information. |
||||||||||||||||||||||||
|
Behrakis That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
9.3 2 Davies Avenue (Queens Domain, Council Facilities), Hobart - Bin Storage Shelter PLN-19-769 - File Ref: F19/154941 Ref: Open CPC 7.1.6, 9/12/2019 Application Expiry Date: 17 December 2019 |
|||||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for a bin storage shelter at Queens Domain, Hobart TAS 7000 for the reasons outlined in the officer’s report, attached to item 7.1.6 of the Open City Planning Committee agenda of 9 December 2019 and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN19769 2 DAVIES AVENUE HOBART (QUEENS DOMAIN COUNCIL FACILITIES) TAS 7000 Final Planning Documents except where modified below.
Reason for condition
To clarify the scope of the permit.
ENG sw1
All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure or an approved alternative disposal system / point prior to commencement of use.
Advice: Under section 23 of the Urban Drainage Act 2013 it is an offence for a property owner to direct stormwater onto a neighbouring property.
Reason for condition
To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.
ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information.
This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.
PLUMBING PERMIT
You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information. |
||||||||||||||||||||||||
|
Sherlock That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
Item 10 was then taken.
9.4 431 Elizabeth Street, North Hobart - Demolition and New Building for 29 Multiple Dwellings and General Retail and Hire, Food Services and Professional Services PLN-18-754 - File Ref: F19/156233 Ref: Supplementary Open CPC 12, 9/12/2019 Application Expiry Date: 26 December 2019 |
|||||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for demolition and new building for 29 Multiple Dwellings and general retail and hire, food services and business and professional services at 431 Elizabeth Street, North Hobart for the reasons outlined in the officer’s report, attached to supplementary item 12 of the Open City Planning Committee agenda of 9 December 2019 and a permit containing the following conditions be issued: GEN The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN18745 431 ELIZABETH STREET NORTH HOBART TAS 7000 Final Planning Documents, except where modified below. Reason for condition To clarify the scope of the permit. TW The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2018/01730HCC dated 02/11/2018 as attached to the permit. Reason for condition To clarify the scope of the permit. PLN 8 The fence along the front south and south western boundary must be no more than 1.8m in height above natural ground level.
Reason for condition To provide reasonable opportunity for privacy for dwellings and to maintain the streetscape. PLN s1 Documentation confirming the proposed external design details must be retained and implemented in the final detailed design of the building. The external colours, finished and details must be submitted to and approved by Council's Director City Planning prior to the issuing of any Building permits or works on site. All work required by this condition must be undertaken in accordance with the approved (enter type of documentation, e.g. revised plans). Advice: Once the (type of document) have been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure that the building responds positively to the surrounding streetscape as required by Clause 15.4 Development Standards for Buildings and Works of the Hobart Interim Planning Scheme 2015.
PLN s2
The site must be landscaped within 3 months of
completion. 1. a scale, dimensions and north point; 2. buildings and trees (including botanical names) on neighbouring properties within three metres of the boundary; 3. details of surface finishes of pathways and driveways; 4. a planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant; 5. landscaping and planting within all open areas of the site.
ENG 12 A construction waste management plan must be implemented throughout construction. A construction waste management plan must be submitted and approved, prior to commencement of work on the site. The construction waste management plan must include: · Provisions for commercial waste services for the handling, storage, transport and disposal of postconstruction solid waste and recycle bins from the development; and · Provisions for the handling, transport and disposal of demolition material, including any contaminated waste and recycling opportunities, to satisfy the above requirement. All work required by this condition must be undertaken in accordance with the approved construction waste management plan.
Advice: Once the construction waste management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill. Further information can also be found on the Council’s website. Reason for condition To ensure that solid waste management from the site meets the Council’s requirements and standards. ENG sw1 All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to issue of a Certificate of Completion, first occupation or commencement of use (whichever occurs first). Advice: Under section 23 of the Urban Drainage Act 2013 it is an offence for a property owner to direct stormwater onto a neighbouring property. Reason for condition To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.
ENG sw4 Stormwater drainage for the development must be drained to Council stormwater drainage infrastructure taking into account the limited receiving capacity of Council's existing stormwater drainage Infrastructure. Any new stormwater connection(s) required must be constructed and existing redundant connections sealed by the Council at the owner’s expense, prior to issue of a Certificate of Completion, first occupation, or commencement of use, whichever occurs first. Detailed engineering design drawings showing both the existing and proposed stormwater drainage service must be submitted and approved, prior to issue of any consent under the Building Act 2016 (excluding demolition or excavation). The detailed engineering design drawings must include: 1. The location of the proposed connection(s) and all existing connection; 2. The size and design of the connection(s) such that they are appropriate to adequately service the development given the limited receiving capacity of Council's stormwater drainage infrastructure ( e.g. backflow prevention, temporary stormwater storage, overflows); 3. Longitudinal sections of the proposed connection(s) clearly showing any nearby services, cover, size, material and delineation of public and private infrastructure;and 4. A clear distinction between public and private stormwater drainage infrastructure. All work required by this condition must be undertaken in accordance with the approved detailed engineering drawings. Advice: Once the detailed design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building / plumbing approval is also required, it is recommended that documentation to satisfy this condition is submitted well before submitting documentation for building/plumbing approval. Failure to address planning condition requirements prior to submitting for building/plumbing approval may result in unexpected delays. Please note that once the condition endorsement has been issued you will need to contact Council's City Amenity Division to initiate an application for service connection. Reason for condition To ensure the site is drained adequately. ENG sw7 Stormwater pre treatment from the development on site car park areas must be installed prior to issue of a Certificate of Completion, first occupancy or commencement of use, whichever occurs first. A stormwater management report, and design must be submitted and approved, prior to issue of any consent under the Building Act 2016 (excluding demolition or excavation). The stormwater management report, and design must: 1. be prepared by a suitably qualified engineer; 2. Include detailed design of the proposed treatment train, including final estimations of contaminant removal; and 3. Include a storm water management summary plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency, cleanout procedures, descriptions and diagram of how the installed systems operate, details of the life of assets and replacement requirements. All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and design and at the Owner's expense. Advice: Once the stormwater management report and design has been approved, Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Where building/plumbing approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building/plumbing approval. Failure to address condition endorsement requirements prior to submitting for building/plumbing approval may result in unexpected delays. Reason for condition To avoid the possible pollution of drainage systems and natural watercourses, and to comply with relevant State legislation. ENG sw8 Stormwater detention for stormwater discharges from the development must be installed prior to first occupation issue of a Certificate of Completion, first occupancy or commencement of use, whichever occurs first. A stormwater management report and detention design must be submitted and approved by Council, prior to the issuing of any approval under the Building Act 2016 (excluding demolition or excavation). The stormwater management report and detention design must: 1. be prepared by a suitably qualified engineer; 2. include detailed design and supporting calculations of the detention tank, sized such that there is no increase in flows from the developed site up to 12 l/s for a worst case 5% AEP storm event. All assumptions must be clearly stated; 3. include design drawings of the detention tank showing the layout, the inlet and outlet (including long section), the overflow mechanism; 4. Include clarification of emptying times and outlet size; and 5. include a stormwater management summary plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; cleanout procedures; descriptions and diagrams of how the installed systems operate; details of the life of assets and replacement requirements.
All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and detention design. Advice: Once the stormwater management report and detention design has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement and the associated fees). Where building/plumbing permit is also required, it is recommended that documentation for condition endorsement is lodged well before submitting documentation for building / plumbing approval. Failure to address condition endorsement requirements prior to submitting for building/plumbing approval may result in unexpected delays. Reason for condition To ensure that the stormwater runoff quantity is managed to take into account the limited receiving capacity of the downstream Council stormwater infrastructure. ENG 13 An ongoing waste management plan for all commercial and domestic waste and recycling must be implemented post construction. A waste management plan must be submitted and approved, prior to commencement of work on the site. A waste management plan must: 1. include provisions for commercial waste services for the handling, storage, transport and disposal of domestic waste and recycle bins from the development. All work required by this condition must be undertaken in accordance with the approved waste management plan. Advice: Once the waste management plan has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure that solid waste management from the site meets the Council’s requirements and standards. ENG tr2 A construction traffic and parking management plan must be implemented prior to the commencement of work on the site (including demolition). The construction traffic (including cars, public transport vehicles, service vehicles, pedestrians and cyclists) and parking management plan must be submitted and approved, prior to commencement work (including demolition). The construction traffic and parking management plan must: 1. Be prepared by a suitably qualified person. 2. Develop a communications plan to advise the wider community of the traffic and parking impacts during construction. 3. Include a start date and finish dates of various stages of works. 4. Include times that trucks and other traffic associated with the works will be allowed to operate. 5. Nominate a superintendant, or the like, to advise the Council of the progress of works in relation to the traffic and parking management with regular meetings during the works. All work required by this condition must be undertaken in accordance with the approved construction traffic and parking management plan. Advice: Once the construction traffic and parking management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. A separate construction traffic and parking management plan may be submitted for each stage of the proposed development (i.e. demolition, excavation, construction). Reason for condition To ensure the safety of vehicles entering and leaving the development and the safety and access around the development site for the general public and adjacent businesses. ENG 2a Prior to first occupation or commencement of use (whichever occurs first), vehicular barriers compliant with the Australian Standard AS/NZS1170.1:2002 must be installed to prevent vehicles running off the edge of an access driveway or parking module (parking spaces, aisles and manoeuvring area) where the drop from the edge of the trafficable area to a lower level is 600mm or greater, and wheel stops (kerb) must be installed for drops between 150mm and 600mm. Barriers must not limit the width of the driveway access or parking and turning areas approved under the permit. Advice: The Council does not consider a slope greater than 1 in 4 to constitute a lower level as described in AS/NZS 2890.1:2004 Section 2.4.5.3. Slopes greater than 1 in 4 will require a vehicular barrier or wheel stop. Designers are advised to consult the National Construction Code 2016 to determine if pedestrian handrails or safety barriers compliant with the NCC2016 are also required in the parking module this area may be considered as a path of access to a building. Reason for condition To ensure the safety of users of the access driveway and parking module and compliance with the standard. ENG 3a The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces must be designed and constructed in accordance with Australian Standard AS/NZS2890.1:2004 and AS2890.3:2015 (including the requirement for vehicle safety barriers where required), or a Council approved alternate design certified by a suitably qualified engineer to provide a safe and efficient access, and enable safe, easy and efficient use. Reason for condition To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard. ENG 3b The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces design must be submitted and approved, prior to the issuing of any approval under the Building Act 2016 (exlcuding demolition or excavation). The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces design must: 1. Be prepared and certified by a suitably qualified engineer; 2. Be generally in accordance with the Australian Standard AS/NZS2890.1:2004 and AS 2890.3:2015; 3. Demonstrate safe and efficient access, and use, where the design deviates from AS/NZS2890.1:2004 or AS 2890.3:2015; 4. Show all class 1A car parking spaces; 5. Show the locations of all structural columns and obstructions with regard to car parking spaces and provide clearance in accordance with Figure 5.2 AS/NZS 2890.1:2004; 6. Show signage and pavement marking; 7. Show all bicycle parking spaces; 8. Show pedestrian bollards for egress to/from lifts and doorways; 9. Show jockey parking spaces are associated with the same domestic unit and are suitably marked (pavement marking or signed); 10. Show small car parking spaces to be suitably marked (pavement marking or signed);and 11. Show dimensions, levels, gradients and transitions, and other details as Council deem necessary to satisfy the above requirement. Advice: Once the design has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement) Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard. ENG 3c The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces must be constructed in accordance with the design drawings approved by Condition ENG 3b. Prior to the issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first, documentation by a suitably qualified engineer certifying that the access driveway and parking module has been constructed in accordance with the above drawings must be lodged with Council. Advice: Certification may be submitted to Council as part of the Building Act 2016 approval process or via condition endorsement (see general advice on how to obtain condition endorsement). Reason for condition To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard. ENG 4 The access driveway and parking module (car parking spaces, aisles and manoeuvring area) approved by this permit must be constructed to a sealed standard (spray seal, asphalt, concrete, pavers or equivalent Council approved) and surface drained to the Council's stormwater infrastructure prior to the issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first. Reason for condition To ensure the safety of users of the access driveway and parking module, and that it does not detract from the amenity of users, adjoining occupiers or the environment by preventing dust, mud and sediment transport. ENG 5 The number of car parking spaces approved on the site is thirty two (32), including six (6) car parking spaces in jockey configuration, unless approved otherwise by Council. All car parking spaces must be designed in accordance with Australian Standard AS/NZS 2890.1:2004 or a Council approved alternate design. All parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white or yellow pavement markers in accordance with Australian Standards AS/NZS 2890.1 2004, prior to issue of certificate of completion, first occupation or commencement of use whichever occurs first. Advice: The jockey parking space is to be allocated to the same domestic unit as the parking space that prevents vehicle exit maneourve when occupied. Reason for condition To ensure the provision of parking for the use is safe and efficient.
ENG 6 The minimum number of bicycle parking spaces to be provided on the site is eight (8), unless approved otherwise by Council. All bicycle parking spaces must be designed in accordance with the Australian Standard AS/NZS 2890.3:2015 or a Council approved alternate design and provided prior to issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first. Reason for condition To ensure that bicycle parking areas are located, designed and constructed to enable safe, easy and efficient use. ENG 7 The minimum number of motorcycle parking spaces to be provided on the site is five (5), unless approved otherwise by Council. All motorcycle parking spaces must be designed in accordance with the Australian Standard AS/NZS 2890.1:2004 or a Council approved alternate design. All parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white of yellow pavement markers in accordance with Australian Standard AS/NZS 2890.1:2004, prior to issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first. Reason for condition To ensure that bicycle parking areas are located, designed and constructed to enable safe, easy and efficient use. ENG 11 Prior to the issue of a Certificate of Completion, first occupation, commencement of the use, whichever occurs first, the proposed crossover to the Elizabeth Street and Commercial Road highway reservation must be designed and constructed in general accordance with: 1. LGAT Standard Drawing Urban TSDR09v1 – Urban Roads Driveways and TSD R14v1 Type KC vehicular crossing; 2. LGAT Standard Drawing Footpath Urban Roads Footpaths TSDR11 v1; or 3. A Council City Infrastructure Division approved alternate design. Design drawings must be submitted to and approved by Council prior to the issue of any approval under the Building Act 2016 (excluding demolition or excavation). The design drawings must: 1. Show the cross and longitudinal section of the driveway crossover within the highway reservation and onto the property; 2. Show the width of the driveway crossover is in accordance with AS/NZS 2890.1:2004; 3. Detail any services or infrastructure (i.e. light pole, pits, awnings) at or near the proposed driveway crossover including any propose relocation of infrastructure; 4. Be designed for the expected vehicle loadings. A structural certificate to note that the driveway is suitable for heavy vehicle loadings; 5. Show swept path templates in accordance with AS/NZS 2890.1:2004 (B85 or B99 depending on use, design template) are fully contained within the extents of the driveway crossover. 6. Demonstrate on the drawings that a B85 vehicle or B99 vehicle depending on use (AS/NZS 2890.1 2004, section 2.6.2) can access the driveway from the road pavement into the property without scraping the cars underside if the design deviates from the requirements of the TSD; 7. Show that vehicular and pedestrian sight lines are met as per AS/NZS 2890.1:2004. 8. Be prepared and certified by a suitably qualified and experience engineer, to satisfy the above requirements. All works required by this condition must be undertaken in accordance with the approved certified drawings and at the owner's expense. Advice: Local Government Association (LGAT) Tasmanian Standard Drawings (TSD) can be viewed electronically via the LGAT Website. It is advised that designers consider the detailed design of the crossover, access and parking module prior to finalising the Finished Floor Level (FFL) of the parking spaces, as failure to do so may result in difficulty complying with this condition. Any adjustment to footpath levels necessary to suit the design of proposed floor, parking module or driveway levels will require separate agreement from Council's Road Services Engineer and may require further planning approvals. It is advised to place a note to this affect on construction drawings for the site and/or other relevant engineering drawings to ensure that contractors are made aware of this requirement. Redundant crossovers are required to be reinstated under the Hobart City Council's Highways Bylaw. Please contact Council City Infrastructure Division to discuss approval of alternate designs. You are likely to require a Permit to Open Up and Temporarily Occupy a Highway (for work within the highway reservation). Click here for more information. The applicant is required to submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain condition endorsement and for fees and charges]). This is a separate process to any building approval under the Building Act 2016. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition In the interests of vehicle user safety and the amenity of the development. ENG 1 Any damage to council infrastructure resulting from the implementation of this permit, must, at the discretion of the Council: 1. Be met by the owner by way of reimbursement (cost of repair and reinstatement to be paid by the owner to the Council); or 2. Be repaired and reinstated by the owner to the satisfaction of the Council. A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.
A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, preexisting damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner. Reason for condition To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost. ENG r1 The excavation and/or earthretaining structures (ie embankments, cuttings, retaining walls) and/or footings supporting the highway reservation must not undermine the stability and integrity of the highway reservation and its infrastructure. Detailed design drawings, structural certificates and associated geotechnical assessments of the earthretaining structures (ie embankments, cuttings, retaining walls) and/or footings supporting the Elizabeth Street and Commercial Road highway reservation must be submitted and approved, prior to the commencement of work (including demolition) and must: 1. Be prepared and certified by a suitable qualified person and experienced engineer; 2. Not undermine the stability of the highway reservation; 3. Be designed in accordance with AS4678, with a design life in accordance with table 3.1 typical application major public infrastructure works; 4. Take into account any additional surcharge loadings as required by relevant Australian Standards; 5. Take into account and reference accordingly any Geotechnical findings; 6. Detail any mitigation measures required; 7. Detail the design and location of the footing adjacent to the Elizabeth Street and Commercial Road Highway reservation; and 8. The structure certificated and/or drawings should note accordingly the above. All work required by this condition must be undertaken in accordance with the approved select design drawing and structural certificates. Advice: The applicant is required submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain condition endorsement and for fees and charges]). This is a separate process to any building approval under the Building Act 2016. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure that the stability and integrity of the Council’s highway reservation is not compromised by the development. ENG s1 Gates and doors must not open in such a way as to encroach upon any road reservation. The entire gate and/or door (in any position) including all associated mechanisms must be fully contained within the boundaries of the subject property. Advice: Gates and doors that encroach upon road reservation are in contravention of section 52 of the Local Government (Highways) Act 1982. Reason for condition For the safety of all road reservation users.
ENG s2 All stairs or ramps associated with pedestrian access to the development must be fully contained within the boundaries of the subject property and not encroach upon any road reservation. Advice: Any adjustment to footpath levels necessary to suit the design of any proposed stairs or ramps will require separate agreement from Council's Road Services Engineer and may require further planning approvals. It is advised to place a note to this affect on construction drawings for the site and/or other relevant engineering drawings to ensure that contractors are made aware of this requirement. Reason for condition For the safety of all road reservation users. ENV 2 Sediment and erosion control measures, in accordance with an approved soil and water management plan (SWMP), must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction. A SWMP must be submitted prior to the issue of any approval under the Building Act 2016 or the commencement of work, whichever occurs first. The SWMP must be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008), available here. All work required by this condition must be undertaken in accordance with the approved SWMP. Advice: Once the SWMP has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development. ENVHE 1 Recommendations in the report by GES (GeoEnvironmental Solutions) Site Assessment V3, dated July 2019 must be implemented, for the duration of the development. Reason for condition: To ensure that the risk to future occupants of the building remain low and acceptable. ENVHE 2 A Soil, Water and Gas Management Plan prepared by a suitably qualified and experienced person/company in accordance with the procedures and practices detailed in the Environmental Management And Pollution Control (Waste Management) Regulations 2010 & EPA Information Bulletin 105, must be submitted to council prior to commencement of work. The report must include: Identification, management, transport & disposal of any potentially contaminated soils, waters, and gasses, to prevent offsite transfer of potentiallycontaminated soil or stormwater. Whether any specific remediation and/or protection measures are required to ensure proposed excavation does not adversely impact human health or the environment before excavation commences. Protective/safety measures for the public, workers and environment during redevelopment of the site. Identification of contamination plumes that may have spread from/left the site prior to development commencing. An ongoing remediation or management plan for contamination (soil, water, leachates, gas) that could not, or was not removed, remediated during the site development. The remediation management plan should identify and incorporate contamination plumes that may have spread from/left the site prior to development commencing.
Reason for condition To determine the level of site contamination, to manage stockpiles, transport and disposal of identified contaminants to identify any recommended remediation/management practices/safeguards which need to be followed/put in place during any excavations/ground disturbance on and/or for use/future use of the site and surrounds, to provide for a safe living environment. ENVHE 3 A Decommissioning Assessment Report, prepared by a suitably qualified and experienced person/company, and in accordance with the procedures and practices detailed in the Environmental Management and Control (Underground Petroleum Storage Systems) Regulations 2010 and other appropriate Legislation, Standards and Guidelines must be provided prior to commencement of work. The report must satisfy the specific requirements of the EPA Contaminated Sites Unit and Workplace Standards Tasmania. Advice: The EPA Contaminated Sites Unit and Workplace Standards Tasmania have requirements in relation to the decommissioning and/or removal of underground petroleum storage systems and should be contacted prior to Building Permit application submission. The same Report/information required by the EPA and Workplace Standards may be submitted to Council as a part of the Building Application. Certified Environmental Practitioners that may prepare the Decommissioning Assessment Report may be located at: https://www.cenvp.org/directory/ Reason for condition: To ensure the safe and compliant decommissioning of underground petroleum storage systems. ENVHE 4 A Construction Management Plan (CMP) written by a suitably qualified person/company, in accordance with the Recommendations of the GES (Geo Environmental Solutions) Site Assessment V3, dated July 2019, must be implemented throughout the construction works. A construction management plan must be submitted and approved prior to the issuing of any building permit under the Building Act 2016. The plan must include but is not limited to the following: 1. Identification, management and transport/disposal of any potentially waste and asbestos; 2. Proposed hours of work (including volume and timing of heavy vehicles entering and leaving the site, and works undertaken on site); 3. Proposed hours of construction; 4. Identification of potentially noisy construction phases, such as operation of rock breakers, explosives or pile drivers, and proposed means to minimise impact on the amenity of neighbouring buildings; 5. Control of dust and emissions during working hours; 6. Proposed screening of the site and vehicular access points during work; and 7. Procedures for washing down vehicles, to prevent soil and debris being carried onto the street. All work required by this condition must be undertaken in accordance with the approved construction management plan. Advice: Once the construction management plan has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure minimal impact on the amenity of adjoining properties and members of the public during the construction period. ENVHE s3 Documentation demonstrating compliance with the recommendations of the Phase II Environmental Site Assessment V3 (Dated July 2019) Prepared by GES must be submitted and approved, prior to commencement of work. A certified Contamination Management Plan and a certified Soil and Water Management Plan prepared by a suitably qualified Environmental Consultant to satisfy the above requirements, must be provided to the Council prior to the commencement of work. All works, required by this condition must be undertaken in accordance with the certified Contamination Management Plan and a Soil and Water Management Plan prepared by a suitably qualified Environmental Consultant. Reason for condition To ensure that the works is carried out to the satisfaction of the Council. Part 5 r1 The owner(s) of the property must enter into an agreement with the Council pursuant to Part 5 of the Land Use Planning and Approvals Act 1993 with respect to the protection of (ie retaining wall, anchors, building) adjacent to the Elizabeth Street and Commercial Road highway reservation prior to the commencement of work. The owner must not undertake any works at any time (including excavation and building) that will have any effect on the integrity of the Elizabeth Street and Commercial Road highway reservation or any retaining structure adjacent to the Elizabeth Street and Commercial Road highway reservation or the road formation themselves or undermine the structural integrity of the highway reservation. All costs for the preparation and registration of the Part 5 Agreement must be met by the owner. The owner must comply with the Part 5 Agreement which will be placed on the property title. Note: For further information with respect to the preparation of a part 5 agreement please contact Council Development Engineering Staff on (03) 6238 2715. Reason for condition To ensure the protection of Council are retained.
ADVICE The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information. Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council. CONDITION ENDORSEMENT ENGINEERING All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP: Value of Building Works Approved by Planning Permit Fee: Up to $20,000: $150 per application. Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment. These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations. Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.
Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed. BUILDING PERMIT You may need building approval in accordance with the Building Act 2016. Click here for more information. This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993. PLUMBING PERMIT You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information. OCCUPATION OF THE PUBLIC HIGHWAY You may require a permit for the occupation of the public highway for construction or special event (e.g. placement of skip bin, crane, scissor lift etc). Click here for more information. You may require a road closure permit for construction or special event. Click here for more information. You may require a Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information. GENERAL EXEMPTION (TEMPORARY) PARKING PERMITS You may qualify for a General Exemption permit for construction vehicles i.e. residential or meter parking/loading zones. Click here for more information. PERMIT TO CONSTRUCT PUBLIC INFRASTRUCTURE You may require a permit to construct public infrastructure, with a 12 month maintenance period and bond (please contact the Hobart City Council's City Amenity Division to initiate the permit process).
NEW SERVICE CONNECTION Please contact the Hobart City Council's City Amenity Division to initiate the application process for your new stormwater connection. STORMWATER Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information. STRUCTURES CLOSE TO COUNCILS' STORMWATER MAIN The design of structures (including footings) must provide protection for the Council’s infrastructure. For information regarding appropriate designs please contact the Council's City Infrastructure Division. WORK WITHIN THE HIGHWAY RESERVATION Please note development must be in accordance with the Hobart City Council’s Highways By law. Click here for more information. CBD AND HIGH VOLUME FOOTPATH CLOSURES Please note that the City of Hobart does not support the extended closure of public footpaths or roads to facilitate construction on adjacent land. It is the developer's responsibility to ensure that the proposal as designed can be constructed without reliance on such extended closures. In special cases, where it can be demonstrated that closure of footpaths in the CBD and/or other high volume footpaths can occur for extended periods without unreasonable impact on other businesses or the general public, such closures may only be approved by the full Council. For more information about this requirement please contact the Council's Traffic Engineering Unit on 6238 2804. DRIVEWAY SURFACING OVER HIGHWAY RESERVATION If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future. REDUNDANT CROSSOVERS Redundant crossovers are required to be reinstated under the Hobart City Council’s Highways By law. Click here for more information. ACCESS Designed in accordance with LGAT IPWEA – Tasmanian standard drawings. Click here for more information. CROSS OVER CONSTRUCTION The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design. Click here for more information. STORM WATER / ROADS / ACCESS Services to be designed and constructed in accordance with the (IPWEA) LGAT – standard drawings. Click here for more information. WORK PLACE HEALTH AND SAFETY Appropriate occupational health and safety measures must be employed during the works to minimise direct human exposure to potentiallycontaminated soil, water, dust and vapours. Click here for more information. PROTECTING THE ENVIRONMENT In accordance with the Environmental Management and Pollution Control Act 1994, local government has an obligation to "use its best endeavours to prevent or control acts or omissions which cause or are capable of causing pollution." Click here for more information. NOISE REGULATIONS Click here for information with respect to noise nuisances in residential areas. WASTE DISPOSAL It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill. Further information regarding waste disposal can also be found on the Council’s website. FEES AND CHARGES Click here for information on the Council's fees and charges. DIAL BEFORE YOU DIG Click here for dial before you dig information. RESIDENTIAL PARKING PERMITS ELIGIBILITY It is advised that this development will not be eligible for residential parking permits for onstreet parking
ADDITIONAL BICYCLE PARKING
The applicant consider the provision of additional bicycle parking facilities and storage lockers. |
||||||||||||||||||||||||
|
Ewin That the recommendation be adopted. |
||||||||||||||||||||||||
|
Sherlock
That an advice clause be added requesting the applicant to consult with The Friends’ School and representors regarding conditions of approval Eng12, TR2 and Env4.
|
||||||||||||||||||||||||
|
Procedural Motion
THOMAS
That consideration of the item be adjourned to enable Council officers to seek a deferral of the application from the applicant so as to enable discussion of conditions of approval Eng12, TR2 and Env4 with The Friends’ School, in accordance with its request.
|
||||||||||||||||||||||||
|
PROCEDURAL MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
Item 9.4 was then adjourned and item 9.5 was taken. |
||||||||||||||||||||||||
|
Item 9.4 resumed following item 10. |
||||||||||||||||||||||||
|
AMENDMENT CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
SUBSTANTIVE MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
COUNCIL RESOLUTION: |
||||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for demolition and new building for 29 Multiple Dwellings and general retail and hire, food services and business and professional services at 431 Elizabeth Street, North Hobart for the reasons outlined in the officer’s report, attached to supplementary item 12 of the Open City Planning Committee agenda of 9 December 2019 and a permit containing the following conditions be issued: GEN The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN18745 431 ELIZABETH STREET NORTH HOBART TAS 7000 Final Planning Documents, except where modified below. Reason for condition To clarify the scope of the permit. TW The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2018/01730HCC dated 02/11/2018 as attached to the permit. Reason for condition To clarify the scope of the permit. PLN 8 The fence along the front south and south western boundary must be no more than 1.8m in height above natural ground level. Reason for condition To provide reasonable opportunity for privacy for dwellings and to maintain the streetscape.
PLN s1 Documentation confirming the proposed external design details must be retained and implemented in the final detailed design of the building. The external colours, finished and details must be submitted to and approved by Council's Director City Planning prior to the issuing of any Building permits or works on site. All work required by this condition must be undertaken in accordance with the approved (enter type of documentation, e.g. revised plans). Advice: Once the (type of document) have been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure that the building responds positively to the surrounding streetscape as required by Clause 15.4 Development Standards for Buildings and Works of the Hobart Interim Planning Scheme 2015.
PLN s2
The site must be landscaped within 3 months of
completion. 1. a scale, dimensions and north point; 2. buildings and trees (including botanical names) on neighbouring properties within three metres of the boundary; 3. details of surface finishes of pathways and driveways; 4. a planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant; 5. landscaping and planting within all open areas of the site.
ENG 12 A construction waste management plan must be implemented throughout construction. A construction waste management plan must be submitted and approved, prior to commencement of work on the site. The construction waste management plan must include: · Provisions for commercial waste services for the handling, storage, transport and disposal of postconstruction solid waste and recycle bins from the development; and · Provisions for the handling, transport and disposal of demolition material, including any contaminated waste and recycling opportunities, to satisfy the above requirement. All work required by this condition must be undertaken in accordance with the approved construction waste management plan. Advice: Once the construction waste management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill. Further information can also be found on the Council’s website. Reason for condition To ensure that solid waste management from the site meets the Council’s requirements and standards. ENG sw1 All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to issue of a Certificate of Completion, first occupation or commencement of use (whichever occurs first). Advice: Under section 23 of the Urban Drainage Act 2013 it is an offence for a property owner to direct stormwater onto a neighbouring property. Reason for condition To ensure that stormwater from the site will be discharged to a suitable Council approved outlet. ENG sw4 Stormwater drainage for the development must be drained to Council stormwater drainage infrastructure taking into account the limited receiving capacity of Council's existing stormwater drainage Infrastructure. Any new stormwater connection(s) required must be constructed and existing redundant connections sealed by the Council at the owner’s expense, prior to issue of a Certificate of Completion, first occupation, or commencement of use, whichever occurs first. Detailed engineering design drawings showing both the existing and proposed stormwater drainage service must be submitted and approved, prior to issue of any consent under the Building Act 2016 (excluding demolition or excavation). The detailed engineering design drawings must include: 1. The location of the proposed connection(s) and all existing connection; 2. The size and design of the connection(s) such that they are appropriate to adequately service the development given the limited receiving capacity of Council's stormwater drainage infrastructure ( e.g. backflow prevention, temporary stormwater storage, overflows); 3. Longitudinal sections of the proposed connection(s) clearly showing any nearby services, cover, size, material and delineation of public and private infrastructure;and 4. A clear distinction between public and private stormwater drainage infrastructure. All work required by this condition must be undertaken in accordance with the approved detailed engineering drawings. Advice: Once the detailed design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building / plumbing approval is also required, it is recommended that documentation to satisfy this condition is submitted well before submitting documentation for building/plumbing approval. Failure to address planning condition requirements prior to submitting for building/plumbing approval may result in unexpected delays. Please note that once the condition endorsement has been issued you will need to contact Council's City Amenity Division to initiate an application for service connection. Reason for condition To ensure the site is drained adequately.
ENG sw7 Stormwater pre treatment from the development on site car park areas must be installed prior to issue of a Certificate of Completion, first occupancy or commencement of use, whichever occurs first. A stormwater management report, and design must be submitted and approved, prior to issue of any consent under the Building Act 2016 (excluding demolition or excavation). The stormwater management report, and design must: 1. be prepared by a suitably qualified engineer; 2. Include detailed design of the proposed treatment train, including final estimations of contaminant removal; and 3. Include a storm water management summary plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency, cleanout procedures, descriptions and diagram of how the installed systems operate, details of the life of assets and replacement requirements. All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and design and at the Owner's expense. Advice: Once the stormwater management report and design has been approved, Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building/plumbing approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building/plumbing approval. Failure to address condition endorsement requirements prior to submitting for building/plumbing approval may result in unexpected delays. Reason for condition To avoid the possible pollution of drainage systems and natural watercourses, and to comply with relevant State legislation. ENG sw8 Stormwater detention for stormwater discharges from the development must be installed prior to first occupation issue of a Certificate of Completion, first occupancy or commencement of use, whichever occurs first. A stormwater management report and detention design must be submitted and approved by Council, prior to the issuing of any approval under the Building Act 2016 (excluding demolition or excavation). The stormwater management report and detention design must: 1. be prepared by a suitably qualified engineer; 2. include detailed design and supporting calculations of the detention tank, sized such that there is no increase in flows from the developed site up to 12 l/s for a worst case 5% AEP storm event. All assumptions must be clearly stated; 3. include design drawings of the detention tank showing the layout, the inlet and outlet (including long section), the overflow mechanism; 4. Include clarification of emptying times and outlet size; and 5. include a stormwater management summary plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; cleanout procedures; descriptions and diagrams of how the installed systems operate; details of the life of assets and replacement requirements. All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and detention design. Advice: Once the stormwater management report and detention design has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement and the associated fees). Where building/plumbing permit is also required, it is recommended that documentation for condition endorsement is lodged well before submitting documentation for building / plumbing approval. Failure to address condition endorsement requirements prior to submitting for building/plumbing approval may result in unexpected delays. Reason for condition To ensure that the stormwater runoff quantity is managed to take into account the limited receiving capacity of the downstream Council stormwater infrastructure. ENG 13 An ongoing waste management plan for all commercial and domestic waste and recycling must be implemented post construction. A waste management plan must be submitted and approved, prior to commencement of work on the site. A waste management plan must: 1. include provisions for commercial waste services for the handling, storage, transport and disposal of domestic waste and recycle bins from the development. All work required by this condition must be undertaken in accordance with the approved waste management plan. Advice: Once the waste management plan has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure that solid waste management from the site meets the Council’s requirements and standards. ENG tr2 A construction traffic and parking management plan must be implemented prior to the commencement of work on the site (including demolition).
The construction traffic (including cars, public transport vehicles, service vehicles, pedestrians and cyclists) and parking management plan must be submitted and approved, prior to commencement work (including demolition). The construction traffic and parking management plan must: 1. Be prepared by a suitably qualified person. 2. Develop a communications plan to advise the wider community of the traffic and parking impacts during construction. 3. Include a start date and finish dates of various stages of works. 4. Include times that trucks and other traffic associated with the works will be allowed to operate. 5. Nominate a superintendant, or the like, to advise the Council of the progress of works in relation to the traffic and parking management with regular meetings during the works. All work required by this condition must be undertaken in accordance with the approved construction traffic and parking management plan. Advice: Once the construction traffic and parking management plan has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. A separate construction traffic and parking management plan may be submitted for each stage of the proposed development (i.e. demolition, excavation, construction).
Reason for condition To ensure the safety of vehicles entering and leaving the development and the safety and access around the development site for the general public and adjacent businesses. ENG 2a Prior to first occupation or commencement of use (whichever occurs first), vehicular barriers compliant with the Australian Standard AS/NZS1170.1:2002 must be installed to prevent vehicles running off the edge of an access driveway or parking module (parking spaces, aisles and manoeuvring area) where the drop from the edge of the trafficable area to a lower level is 600mm or greater, and wheel stops (kerb) must be installed for drops between 150mm and 600mm. Barriers must not limit the width of the driveway access or parking and turning areas approved under the permit. Advice: The Council does not consider a slope greater than 1 in 4 to constitute a lower level as described in AS/NZS 2890.1:2004 Section 2.4.5.3. Slopes greater than 1 in 4 will require a vehicular barrier or wheel stop. Designers are advised to consult the National Construction Code 2016 to determine if pedestrian handrails or safety barriers compliant with the NCC2016 are also required in the parking module this area may be considered as a path of access to a building. Reason for condition To ensure the safety of users of the access driveway and parking module and compliance with the standard. ENG 3a The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces must be designed and constructed in accordance with Australian Standard AS/NZS2890.1:2004 and AS2890.3:2015 (including the requirement for vehicle safety barriers where required), or a Council approved alternate design certified by a suitably qualified engineer to provide a safe and efficient access, and enable safe, easy and efficient use.
Reason for condition To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard. ENG 3b The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces design must be submitted and approved, prior to the issuing of any approval under the Building Act 2016 (exlcuding demolition or excavation). The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces design must: 1. Be prepared and certified by a suitably qualified engineer; 2. Be generally in accordance with the Australian Standard AS/NZS2890.1:2004 and AS 2890.3:2015; 3. Demonstrate safe and efficient access, and use, where the design deviates from AS/NZS2890.1:2004 or AS 2890.3:2015; 4. Show all class 1A car parking spaces; 5. Show the locations of all structural columns and obstructions with regard to car parking spaces and provide clearance in accordance with Figure 5.2 AS/NZS 2890.1:2004; 6. Show signage and pavement marking; 7. Show all bicycle parking spaces; 8. Show pedestrian bollards for egress to/from lifts and doorways; 9. Show jockey parking spaces are associated with the same domestic unit and are suitably marked (pavement marking or signed); 10. Show small car parking spaces to be suitably marked (pavement marking or signed);and 11. Show dimensions, levels, gradients and transitions, and other details as Council deem necessary to satisfy the above requirement. Advice: Once the design has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement) Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard. ENG 3c The access driveway, circulation roadways, ramps and parking module (parking spaces, aisles and manoeuvring area), bicycle parking spaces and motorcycle parking spaces must be constructed in accordance with the design drawings approved by Condition ENG 3b. Prior to the issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first, documentation by a suitably qualified engineer certifying that the access driveway and parking module has been constructed in accordance with the above drawings must be lodged with Council. Advice: Certification may be submitted to Council as part of the Building Act 2016 approval process or via condition endorsement (see general advice on how to obtain condition endorsement) Reason for condition To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard.
ENG 4 The access driveway and parking module (car parking spaces, aisles and manoeuvring area) approved by this permit must be constructed to a sealed standard (spray seal, asphalt, concrete, pavers or equivalent Council approved) and surface drained to the Council's stormwater infrastructure prior to the issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first. Reason for condition To ensure the safety of users of the access driveway and parking module, and that it does not detract from the amenity of users, adjoining occupiers or the environment by preventing dust, mud and sediment transport. ENG 5 The number of car parking spaces approved on the site is thirty two (32), including six (6) car parking spaces in jockey configuration, unless approved otherwise by Council. All car parking spaces must be designed in accordance with Australian Standard AS/NZS 2890.1:2004 or a Council approved alternate design. All parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white or yellow pavement markers in accordance with Australian Standards AS/NZS 2890.1 2004, prior to issue of certificate of completion, first occupation or commencement of use whichever occurs first. Advice: The jockey parking space is to be allocated to the same domestic unit as the parking space that prevents vehicle exit maneourve when occupied. Reason for condition To ensure the provision of parking for the use is safe and efficient. ENG 6 The minimum number of bicycle parking spaces to be provided on the site is eight (8), unless approved otherwise by Council. All bicycle parking spaces must be designed in accordance with the Australian Standard AS/NZS 2890.3:2015 or a Council approved alternate design and provided prior to issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first. Reason for condition To ensure that bicycle parking areas are located, designed and constructed to enable safe, easy and efficient use. ENG 7 The minimum number of motorcycle parking spaces to be provided on the site is five (5), unless approved otherwise by Council. All motorcycle parking spaces must be designed in accordance with the Australian Standard AS/NZS 2890.1:2004 or a Council approved alternate design. All parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white of yellow pavement markers in accordance with Australian Standard AS/NZS 2890.1:2004, prior to issue of a Certificate of Completion, first occupation, commencement of use, whichever occurs first. Reason for condition To ensure that bicycle parking areas are located, designed and constructed to enable safe, easy and efficient use. ENG 11 Prior to the issue of a Certificate of Completion, first occupation, commencement of the use, whichever occurs first, the proposed crossover to the Elizabeth Street and Commercial Road highway reservation must be designed and constructed in general accordance with: 1. LGAT Standard Drawing Urban TSDR09v1 – Urban Roads Driveways and TSD R14v1 Type KC vehicular crossing; 2. LGAT Standard Drawing Footpath Urban Roads Footpaths TSDR11 v1; or 3. A Council City Infrastructure Division approved alternate design. Design drawings must be submitted to and approved by Council prior to the issue of any approval under the Building Act 2016 (excluding demolition or excavation). The design drawings must: 1. Show the cross and longitudinal section of the driveway crossover within the highway reservation and onto the property; 2. Show the width of the driveway crossover is in accordance with AS/NZS 2890.1:2004; 3. Detail any services or infrastructure (i.e. light pole, pits, awnings) at or near the proposed driveway crossover including any propose relocation of infrastructure; 4. Be designed for the expected vehicle loadings. A structural certificate to note that the driveway is suitable for heavy vehicle loadings; 5. Show swept path templates in accordance with AS/NZS 2890.1:2004 (B85 or B99 depending on use, design template) are fully contained within the extents of the driveway crossover. 6. Demonstrate on the drawings that a B85 vehicle or B99 vehicle depending on use (AS/NZS 2890.1 2004, section 2.6.2) can access the driveway from the road pavement into the property without scraping the cars underside if the design deviates from the requirements of the TSD; 7. Show that vehicular and pedestrian sight lines are met as per AS/NZS 2890.1:2004. 8. Be prepared and certified by a suitably qualified and experience engineer, to satisfy the above requirements. All works required by this condition must be undertaken in accordance with the approved certified drawings and at the owner's expense. Advice: Local Government Association (LGAT) Tasmanian Standard Drawings (TSD) can be viewed electronically via the LGAT Website. It is advised that designers consider the detailed design of the crossover, access and parking module prior to finalising the Finished Floor Level (FFL) of the parking spaces, as failure to do so may result in difficulty complying with this condition. Any adjustment to footpath levels necessary to suit the design of proposed floor, parking module or driveway levels will require separate agreement from Council's Road Services Engineer and may require further planning approvals. It is advised to place a note to this affect on construction drawings for the site and/or other relevant engineering drawings to ensure that contractors are made aware of this requirement. Redundant crossovers are required to be reinstated under the Hobart City Council's Highways Bylaw. Please contact Council City Infrastructure Division to discuss approval of alternate designs. You are likely to require a Permit to Open Up and Temporarily Occupy a Highway (for work within the highway reservation). Click here for more information. The applicant is required to submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain condition endorsement and for fees and charges]). This is a separate process to any building approval under the Building Act 2016. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition In the interests of vehicle user safety and the amenity of the development. ENG 1 Any damage to council infrastructure resulting from the implementation of this permit, must, at the discretion of the Council: 1. Be met by the owner by way of reimbursement (cost of repair and reinstatement to be paid by the owner to the Council); or 2. Be repaired and reinstated by the owner to the satisfaction of the Council. A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works. A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, preexisting damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner. Reason for condition To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost. ENG r1 The excavation and/or earthretaining structures (ie embankments, cuttings, retaining walls) and/or footings supporting the highway reservation must not undermine the stability and integrity of the highway reservation and its infrastructure. Detailed design drawings, structural certificates and associated geotechnical assessments of the earthretaining structures (ie embankments, cuttings, retaining walls) and/or footings supporting the Elizabeth Street and Commercial Road highway reservation must be submitted and approved, prior to the commencement of work (including demolition) and must: 1. Be prepared and certified by a suitable qualified person and experienced engineer; 2. Not undermine the stability of the highway reservation; 3. Be designed in accordance with AS4678, with a design life in accordance with table 3.1 typical application major public infrastructure works; 4. Take into account any additional surcharge loadings as required by relevant Australian Standards; 5. Take into account and reference accordingly any Geotechnical findings; 6. Detail any mitigation measures required; 7. Detail the design and location of the footing adjacent to the Elizabeth Street and Commercial Road Highway reservation; and 8. The structure certificated and/or drawings should note accordingly the above. All work required by this condition must be undertaken in accordance with the approved select design drawing and structural certificates. Advice: The applicant is required submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain condition endorsement and for fees and charges]). This is a separate process to any building approval under the Building Act 2016. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure that the stability and integrity of the Council’s highway reservation is not compromised by the development. ENG s1 Gates and doors must not open in such a way as to encroach upon any road reservation. The entire gate and/or door (in any position) including all associated mechanisms must be fully contained within the boundaries of the subject property. Advice: Gates and doors that encroach upon road reservation are in contravention of section 52 of the Local Government (Highways) Act 1982. Reason for condition For the safety of all road reservation users. ENG s2 All stairs or ramps associated with pedestrian access to the development must be fully contained within the boundaries of the subject property and not encroach upon any road reservation. Advice: Any adjustment to footpath levels necessary to suit the design of any proposed stairs or ramps will require separate agreement from Council's Road Services Engineer and may require further planning approvals. It is advised to place a note to this affect on construction drawings for the site and/or other relevant engineering drawings to ensure that contractors are made aware of this requirement. Reason for condition For the safety of all road reservation users.
ENV 2 Sediment and erosion control measures, in accordance with an approved soil and water management plan (SWMP), must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction. A SWMP must be submitted prior to the issue of any approval under the Building Act 2016 or the commencement of work, whichever occurs first. The SWMP must be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008), available here. All work required by this condition must be undertaken in accordance with the approved SWMP. Advice: Once the SWMP has been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development. ENVHE 1 Recommendations in the report by GES (GeoEnvironmental Solutions) Site Assessment V3, dated July 2019 must be implemented, for the duration of the development. Reason for condition: To ensure that the risk to future occupants of the building remain low and acceptable.
ENVHE 2 A Soil, Water and Gas Management Plan prepared by a suitably qualified and experienced person/company in accordance with the procedures and practices detailed in the Environmental Management And Pollution Control (Waste Management) Regulations 2010 & EPA Information Bulletin 105, must be submitted to council prior to commencement of work. The report must include: Identification, management, transport & disposal of any potentially contaminated soils, waters, and gasses, to prevent offsite transfer of potentiallycontaminated soil or stormwater. Whether any specific remediation and/or protection measures are required to ensure proposed excavation does not adversely impact human health or the environment before excavation commences. Protective/safety measures for the public, workers and environment during redevelopment of the site. Identification of contamination plumes that may have spread from/left the site prior to development commencing. An ongoing remediation or management plan for contamination (soil, water, leachates, gas) that could not, or was not removed, remediated during the site development. The remediation management plan should identify and incorporate contamination plumes that may have spread from/left the site prior to development commencing. Reason for condition To determine the level of site contamination, to manage stockpiles, transport and disposal of identified contaminants to identify any recommended remediation/management practices/safeguards which need to be followed/put in place during any excavations/ground disturbance on and/or for use/future use of the site and surrounds, to provide for a safe living environment. ENVHE 3 A Decommissioning Assessment Report, prepared by a suitably qualified and experienced person/company, and in accordance with the procedures and practices detailed in the Environmental Management and Control (Underground Petroleum Storage Systems) Regulations 2010 and other appropriate Legislation, Standards and Guidelines must be provided prior to commencement of work. The report must satisfy the specific requirements of the EPA Contaminated Sites Unit and Workplace Standards Tasmania.
Advice: The EPA Contaminated Sites Unit and Workplace Standards Tasmania have requirements in relation to the decommissioning and/or removal of underground petroleum storage systems and should be contacted prior to Building Permit application submission. The same Report/information required by the EPA and Workplace Standards may be submitted to Council as a part of the Building Application. Certified Environmental Practitioners that may prepare the Decommissioning Assessment Report may be located at: https://www.cenvp.org/directory/ Reason for condition: To ensure the safe and compliant decommissioning of underground petroleum storage systems. ENVHE 4 A Construction Management Plan (CMP) written by a suitably qualified person/company, in accordance with the Recommendations of the GES (Geo Environmental Solutions) Site Assessment V3, dated July 2019, must be implemented throughout the construction works. A construction management plan must be submitted and approved prior to the issuing of any building permit under the Building Act 2016. The plan must include but is not limited to the following: 1. Identification, management and transport/disposal of any potentially waste and asbestos; 2. Proposed hours of work (including volume and timing of heavy vehicles entering and leaving the site, and works undertaken on site); 3. Proposed hours of construction; 4. Identification of potentially noisy construction phases, such as operation of rock breakers, explosives or pile drivers, and proposed means to minimise impact on the amenity of neighbouring buildings; 5. Control of dust and emissions during working hours; 6. Proposed screening of the site and vehicular access points during work; and 7. Procedures for washing down vehicles, to prevent soil and debris being carried onto the street.
All work required by this condition must be undertaken in accordance with the approved construction management plan. Advice: Once the construction management plan has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Where building approval is also required, it is recommended that documentation for condition endorsement be submitted well before submitting documentation for building approval. Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays. Reason for condition To ensure minimal impact on the amenity of adjoining properties and members of the public during the construction period. ENVHE s3 Documentation demonstrating compliance with the recommendations of the Phase II Environmental Site Assessment V3 (Dated July 2019) Prepared by GES must be submitted and approved, prior to commencement of work. A certified Contamination Management Plan and a certified Soil and Water Management Plan prepared by a suitably qualified Environmental Consultant to satisfy the above requirements, must be provided to the Council prior to the commencement of work. All works, required by this condition must be undertaken in accordance with the certified Contamination Management Plan and a Soil and Water Management Plan prepared by a suitably qualified Environmental Consultant. Reason for condition To ensure that the works is carried out to the satisfaction of the Council. Part 5 r1 The owner(s) of the property must enter into an agreement with the Council pursuant to Part 5 of the Land Use Planning and Approvals Act 1993 with respect to the protection of (ie retaining wall, anchors, building) adjacent to the Elizabeth Street and Commercial Road highway reservation prior to the commencement of work. The owner must not undertake any works at any time (including excavation and building) that will have any effect on the integrity of the Elizabeth Street and Commercial Road highway reservation or any retaining structure adjacent to the Elizabeth Street and Commercial Road highway reservation or the road formation themselves or undermine the structural integrity of the highway reservation. All costs for the preparation and registration of the Part 5 Agreement must be met by the owner. The owner must comply with the Part 5 Agreement which will be placed on the property title. Note: For further information with respect to the preparation of a part 5 agreement please contact Council Development Engineering Staff on (03) 6238 2715. Reason for condition To ensure the protection of Council are retained. ADVICE The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information. Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council. CONDITION ENDORSEMENT ENGINEERING All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP: Value of Building Works Approved by Planning Permit Fee: Up to $20,000: $150 per application. Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment. These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations. Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted. Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed. BUILDING PERMIT You may need building approval in accordance with the Building Act 2016. Click here for more information. This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993. PLUMBING PERMIT You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information. OCCUPATION OF THE PUBLIC HIGHWAY You may require a permit for the occupation of the public highway for construction or special event (e.g. placement of skip bin, crane, scissor lift etc). Click here for more information. You may require a road closure permit for construction or special event. Click here for more information.
You may require a Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information. GENERAL EXEMPTION (TEMPORARY) PARKING PERMITS You may qualify for a General Exemption permit for construction vehicles i.e. residential or meter parking/loading zones. Click here for more information. PERMIT TO CONSTRUCT PUBLIC INFRASTRUCTURE You may require a permit to construct public infrastructure, with a 12 month maintenance period and bond (please contact the Hobart City Council's City Amenity Division to initiate the permit process). NEW SERVICE CONNECTION Please contact the Hobart City Council's City Amenity Division to initiate the application process for your new stormwater connection. STORMWATER Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law. Click here for more information. STRUCTURES CLOSE TO COUNCILS' STORMWATER MAIN The design of structures (including footings) must provide protection for the Council’s infrastructure. For information regarding appropriate designs please contact the Council's City Infrastructure Division. WORK WITHIN THE HIGHWAY RESERVATION Please note development must be in accordance with the Hobart City Council’s Highways By law. Click here for more information. CBD AND HIGH VOLUME FOOTPATH CLOSURES Please note that the City of Hobart does not support the extended closure of public footpaths or roads to facilitate construction on adjacent land. It is the developer's responsibility to ensure that the proposal as designed can be constructed without reliance on such extended closures.
In special cases, where it can be demonstrated that closure of footpaths in the CBD and/or other high volume footpaths can occur for extended periods without unreasonable impact on other businesses or the general public, such closures may only be approved by the full Council. For more information about this requirement please contact the Council's Traffic Engineering Unit on 6238 2804. DRIVEWAY SURFACING OVER HIGHWAY RESERVATION If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future. REDUNDANT CROSSOVERS Redundant crossovers are required to be reinstated under the Hobart City Council’s Highways By law. Click here for more information. ACCESS Designed in accordance with LGAT IPWEA – Tasmanian standard drawings. Click here for more information. CROSS OVER CONSTRUCTION The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design. Click here for more information. STORM WATER / ROADS / ACCESS Services to be designed and constructed in accordance with the (IPWEA) LGAT – standard drawings. Click here for more information. WORK PLACE HEALTH AND SAFETY Appropriate occupational health and safety measures must be employed during the works to minimise direct human exposure to potentiallycontaminated soil, water, dust and vapours. Click here for more information.
PROTECTING THE ENVIRONMENT In accordance with the Environmental Management and Pollution Control Act 1994, local government has an obligation to "use its best endeavours to prevent or control acts or omissions which cause or are capable of causing pollution." Click here for more information. NOISE REGULATIONS Click here for information with respect to noise nuisances in residential areas. WASTE DISPOSAL It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill. Further information regarding waste disposal can also be found on the Council’s website. FEES AND CHARGES Click here for information on the Council's fees and charges. DIAL BEFORE YOU DIG Click here for dial before you dig information. RESIDENTIAL PARKING PERMITS ELIGIBILITY It is advised that this development will not be eligible for residential parking permits for onstreet parking
ADDITIONAL BICYCLE PARKING
The applicant consider the provision of additional bicycle parking facilities and storage lockers.
CONSULTATION WITH NEARBY PROPERTY OWNERS The applicant is encouraged to consult with nearby property owners, including the Friends School, in relation to the proposal and in particular in relation to conditions of planning approval ENG 12, ENG tr2 and ENVHE 4. |
Item 9.6 was then taken.
9.5 PLN-19-478 - 21 Gregory Street, Sandy Bay - Partial Demolition, Alterations and Extension - Deferral File Ref: F19/156319 Ref: Supplementary Open CPC 13, 9/12/2019 |
|||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for partial demolition, alterations and extension at 21 Gregory Street, Sandy Bay as the proposal is consistent with the provisions within the Historic Heritage Code and the Gregory Street Specific Area Plan of the Hobart Interim Planning Scheme 2015 and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN19478 21 GREGORY STREET SANDY BAY TAS 7005 Final Planning Documents except where modified below.
Reason for condition
To clarify the scope of the permit.
THC
The use and/or development must comply with the requirements of the Tasmanian Heritage Council as detailed in the Notice of Heritage Decision, THC Works Ref: 5991 dated 17 October 2019, as attached to the permit.
Reason for condition
To clarify the scope of the permit.
PLN 15a
A demolition waste management plan must be implemented throughout demolition. The demolition waste management plan must include provisions for the handling, transport and disposal of demolition material, including any contaminated waste and recycling opportunities, to satisfy the above requirement.
Advice:
It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill.
Further information can also be found on the Council’s website.
Reason for condition To ensure that solid waste management from the site meets the Council’s requirements and standards
ENG sw1
All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to commencement of use.
Advice: Under section 23 of the Urban Drainage Act 2013 it is an offence for a property owner to direct stormwater onto a neighbouring property. Reason for condition
To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.
ENG 1
Any damage to council infrastructure resulting from the implementation of this permit, must, at the discretion of the Council:
1. Be met by the owner by way of reimbursement (cost of repair and reinstatement to be paid by the owner to the Council); or 2. Be repaired and reinstated by the owner to the satisfaction of the Council. 3. A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.
A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.
Reason for condition
To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.
ENV 1
Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site, and maintained until all areas of disturbance have been stabilized or re vegetated.
Advice: For further guidance in preparing a Soil and Water Management Plan – in accordance with Fact sheet 3 Derwent Estuary Program click here.
Reason for condition
To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State legislation.
HER 9
The chimney stack and fireplace in the bedroom directly adjacent the kitchen must be retained.
Reason for condition
To ensure that demolition in whole or part of a heritage place and precinct does not result in the loss of historic cultural heritage values.
HER 12
The external cladding of the proposed extension must be revised to reflect the colours, materials and finishes of the exterior of the existing house, (including the new galvanised roof) streetscape and precinct.
Prior to the issue of any approval under the Building Act 2016, revised plans must be submitted and approved showing a revised cladding details, materials, finishes and colour, in accordance with the above requirement.
All work required by this condition must be undertaken in accordance with the approved documentation.
Reason for condition
To ensure that development at a heritage place and in a heritage precinct is undertaken in a sympathetic manner which does not cause loss of historic cultural heritage significance.
HER 17
The reroofing shown on drawing A0400 and A0401, Proposed Elevations, dated 3/9/19 must utilise Barrington Slate Tile.
Prior to the issue of any approval under the Building Act 2016, revised plans must be submitted and approved showing demonstrating compliance with the above requirement to the satisfaction of the City of Hobart’s Director City Planning.
All work required by this condition must be undertaken in accordance with the approved plans.
Reason for condition
To ensure that development at a heritage place and precinct is undertaken in a sympathetic manner which does not cause loss of historic cultural heritage significance.
ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information.
This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.
PLUMBING PERMIT
You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.
STORMWATER
Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Infrastructure By law. Click here for more information.
WORK PLACE HEALTH AND SAFETY
Appropriate occupational health and safety measures must be employed during the works to minimise direct human exposure to potentiallycontaminated soil, water, dust and vapours. Click here for more information.
NOISE REGULATIONS
Click here for information with respect to noise nuisances in residential areas.
FEES AND CHARGES
Click here for information on the Council's fees and charges.
DIAL BEFORE YOU DIG
Click here for dial before you dig information.
|
||||||||||||||||||||||
|
Briscoe That the recommendation be adopted |
||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
Item 9.7 was then taken.
9.6 31-31a & 33 New Town Road, New Town - Partial Demolition, Extension and Alterations PLN-19-681 - File Ref: F19/152652 Ref: Supplementary Open CPC 14, 9/12/2019 Application Expiry Date: 17 December 2019 |
|||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for partial demolition, extension and alterations at 3131A and 33 New Town Road New Town as the proposal is consistent with the provisions within the Historic Heritage Code of the Hobart Interim Planning Scheme 2015 and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN19681 3131A & 33 New Town Road New Town TAS 7008 Final Planning Documents except where modified below.
Reason for condition
To clarify the scope of the permit.
TW
The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2019/01532HCC dated 29 October 2019 as attached to the permit.
Reason for condition
To clarify the scope of the permit.
ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, bylaws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information.
This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993.
PLUMBING PERMIT
You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.
SPECIAL CONNECTION PERMIT
You may need a Special Connection Permit (Trade Waste) in accordance with the Plumbing Regulations 2014 and the Tasmanian Plumbing Code. Click here for more information.
GENERAL EXEMPTION (TEMPORARY) PARKING PERMITS
You may qualify for a General Exemption permit for construction vehicles i.e. residential or meter parking/loading zones. Click here for more information.
NOISE REGULATIONS
Click here for information with respect to noise nuisances in residential areas.
WASTE DISPOSAL
It is recommended that the developer liaise with the Council’s Cleansing and Solid Waste Unit regarding reducing, reusing and recycling materials associated with demolition on the site to minimise solid waste being directed to landfill.
Further information regarding waste disposal can also be found on the Council’s website.
FEES AND CHARGES
Click here for information on the Council's fees and charges.
DIAL BEFORE YOU DIG
Click here for dial before you dig information. |
||||||||||||||||||
|
Behrakis That the recommendation be adopted. |
||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
Item 11 was then taken.
9.7 11 Denison Street, South Hobart - Partial Demolition, Alterations, Extension and Front Fencing File Ref: F19/158334 Ref: Special Open CPC 2.1.1, 16/12/2019 Application Expiry Date: 9 January 2020 |
|||||||||||||||||||||||||
|
That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for partial demolition, alterations, extension and front fencing at 11 Denison Street, South Hobart Tasmania 7004 as, subject to a condition requiring the proposal to be lowered to a maximum height of 2600mm, the proposal will not result in an unreasonable loss of amenity to the adjoining property at 3 Hennebry Street, and a permit containing the following conditions be issued:
GEN
The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN19401 11 DENISON STREET SOUTH HOBART TAS 7004 Final Planning Documents except where modified below.
Reason for condition
To clarify the scope of the permit.
PLN s1
Prior to the issue of any approval under
the Building Act
2016,
revised plans must be submitted and approved showing:
PLN s4
Prior to the issue of any approval under the Building Act 2016, revised plans must be submitted and approved showing:
1. The main roof height of the proposed dwelling extension is to be reduced by 0.7 of a metre.
All work required by this condition must be undertaken in accordance with the approved revised plans.
Reason for condition
To accord with an amendment to the publicly notified plans as proposed by the applicant, and in the interests of minimising the potential degree of impact on the amenity of neighbouring residential properties.
ENG sw1
All stormwater from the proposed development (including but not limited to: roofed areas, ag drains, retaining wall ag drains and impervious surfaces such as driveways and paved areas) must be drained to the Council’s stormwater infrastructure prior to first occupation or commencement of use (whichever occurs first).
Advice:
Under section 23 of the Urban Drainage Act 2013 it is an offence for a property owner to direct stormwater onto a neighbouring property.
Reason for condition
To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.
ENG 2a
Prior to first occupation or commencement of use (whichever occurs first), vehicular barriers compliant with the Australian Standard AS/NZS1170.1:2002 must be installed to prevent vehicles running off the edge of an access driveway or parking module (parking spaces, aisles and manoeuvring area) where the drop from the edge of the trafficable area to a lower level is 600mm or greater, and wheel stops (kerb) must be installed for drops between 150mm and 600mm. Barriers must not limit the width of the driveway access or parking and turning areas approved under the permit.
Advice: The Council does not consider a slope greater
than 1 in 4 to constitute a lower level as described in AS/NZS 2890.1:2004
Section 2.4.5.3. Slopes greater than 1 in 4 will require a vehicular barrier
or wheel stop. Designers are advised to consult the National Construction Code 2016 to determine if pedestrian handrails or safety barriers compliant with the NCC2016 are also required in the parking module this area may be considered as a path of access to a building.
Reason for condition
To ensure the safety of users of the access driveway and parking module and compliance with the standard.
ENG 2b
Prior to the issue of any approval under the Building Act 2016 or the commencement of works on site (whichever occurs first), a certified vehicle barrier design (including site plan with proposed location(s) of installation) prepared by a suitably qualified engineer, compliant with Australian Standard AS/NZS1170.1:2002, must be submitted to Council.
Advice: If the
development's building approval includes the need for a Building Permit from
Council, the applicant is advised to submit detailed design of vehicular
barrier as part of the Building Application. If the development's building approval is covered under Notifiable Work the applicant is advised to submit detailed design of vehicular barrier as a condition endorsement of the planning permit condition. Once the certification has been accepted, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).
Reason for condition
To ensure the safety of users of the access driveway and parking module and compliance with the standard.
ENG 2c
Prior to the commencement of use, vehicular barriers must be inspected by a qualified engineer and certification submitted to the Council confirming that the installed vehicular barriers comply with the certified design and Australian Standard AS/NZS1170.1:2002.
Advice: Certification may be submitted to the Council as part of the Building Act 2016 approval process or via condition endorsement (see general advice on how to obtain condition endorsement).
Reason for condition
To ensure the safety of users of the access driveway and parking module and compliance with the relevant standards.
ENG 3a
The access driveway and parking module (parking spaces, aisles and manoeuvring area) must be designed and constructed in accordance with Australian Standard AS/NZS2890.1:2004 (including the requirement for vehicle safety barriers where required), or a Council approved alternate design certified by a suitably qualified engineer to provide a safe and efficient access, and enable safe, easy and efficient use.
Advice: It is advised that designers consider the detailed design of the access and parking module prior to finalising the Finished Floor Level (FFL) of the parking spaces (especially if located within a garage incorporated into the dwelling), as failure to do so may result in difficulty complying with this condition.
Reason for condition
To ensure the safety of users of the access and parking module, and compliance with the relevant Australian Standard.
ENG 4
The access driveway and parking module (car parking spaces, aisles and manoeuvring area) approved by this permit must be constructed to a sealed standard (spray seal, asphalt, concrete, pavers or equivalent Council approved) and surface drained to the Council's stormwater infrastructure prior to the commencement of use.
Reason for condition
To ensure the safety of users of the access driveway and parking module, and that it does not detract from the amenity of users, adjoining occupiers or the environment by preventing dust, mud and sediment transport.
ENG 1
Any damage to council infrastructure resulting from the implementation of this permit, must, at the discretion of the Council:
1. Be met by the owner by way of reimbursement (cost of repair and reinstatement to be paid by the owner to the Council); or 2. Be repaired and reinstated by the owner to the satisfaction of the Council.
A photographic record of the Council's infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.
A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council's infrastructure found on completion of works will be deemed to be the responsibility of the owner.
Reason for condition
To ensure that any of the Council's infrastructure and/or siterelated service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.
ENG 13
Any fencing within 2.0 metres of the driveway entrance (3.5m wide) must be less than or equal to 1.2m in height in order to provide adequate sight distance between user vehicles, cyclists and pedestrians.
Reason for condition
To ensure the safety of vehicles entering and leaving the development and of pedestrians and traffic in the vicinity.
ENGR 3
Prior to the commencement of use, the proposed driveway crossover within the Hennebry Street highway reservation must be designed and constructed in accordance with:
o Urban
– TSD-R09-v1 – Urban Roads Driveways and TSD R14-v1 Type KC
vehicular crossing o Non-standard K&C- a concrete plinth
to Councils standards shall be constructed at the gutter,
contact Council’s Road Services Engineer for details o Footpath - Urban Roads Footpaths TSD-R11-v1
Design drawings must be submitted and approved prior to the commencement of work. The design drawing must:
1. Show the cross and long section of the driveway crossover within the highway reservation and onto the property; 2. Detail any services or infrastructure (ie light poles, pits, awnings) at or near the proposed driveway crossover; 3. Be designed for the expected vehicle loadings. A structural certificate to note that driveway is suitable for heavy vehicle loadings; 4. Note if the design deviates from the requirements of the TSD then the drawings must demonstrate that a B85 vehicle or B99 depending on use (AS/NZS 2890.1 2004, section 2.6.2) can access the driveway from the road pavement into the property without scraping the cars underside; and 5. Show the existing redundant crossover within the Hennebry Street highway reservation reinstated to footpath, kerb and gutter in general accordance with LGAT Standard Drawing - Urban - TSD-R09- v1 – Urban Roads Driveways and TSD R14-v1 Kerb and Channel Profiles, LGAT Standard Drawing - Footpath - Urban Roads Footpaths TSD-R11-v1 or a Council City Infrastructure Division approved alternate design. 6. Be prepared and certified by a suitable qualified person, to satisfy the above requirement.
All work required by this condition must be undertaken in accordance with the approved drawings.
Advice:
Please contact Council City Infrastructure Division to discuss approval of alternate designs. Based on a site specific assessment, Council City Infrastructure Division Road Engineer may permit extending non approved concrete slab crossover, and where nonstandard kerb and channel exists a concrete plinth to Council standards may be permitted for construction at the gutter.
Grated wedge, asphalt wedge and the standard open wedge driveway crossover may be considered. A drawing of a standard concrete plinth can be obtained from Council's Road Services Engineer. Note that the agreement of Council is required to adjust footpath levels.
The applicant is required submit detailed design documentation to satisfy this condition via Council's planning condition endorsement process (noting there is a fee associated with condition endorsement approval of engineering drawings [see general advice on how to obtain condition endorsement and for fees and charges]). This is a separate process to any building approval under the Building Act 2016.
Please note that your proposal does not include adjustment of footpath levels. Any adjustment to footpath levels necessary to suit the design of proposed floor, parking module or driveway levels will require separate agreement from Council's Road Services Engineer and may require further planning approvals. It is advised to place a note to this affect on construction drawings for the site and/or other relevant engineering drawings to ensure that contractors are made aware of this requirement.
Failure to address condition endorsement requirements prior to submitting for building approval may result in unexpected delays.
Reason for condition
To ensure that works will comply with the Council’s standard requirements.
ENV 1
Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site, and maintained until all areas of disturbance have been stabilized or re vegetated.
Advice:
For further guidance in preparing a Soil and Water Management Plan – in accordance with Fact sheet 3 Derwent Estuary Program click here.
Reason for condition
To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State legislation. ADVICE
The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by-laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit the Council's website for further information.
Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.
CONDITION ENDORSEMENT ENGINEERING
All engineering drawings required to be submitted and approved by this planning permit must be submitted to the City of Hobart as a CEP (Condition Endorsement) via the City’s Online Service Development Portal. When lodging a CEP, please reference the PLN number of the associated Planning Application. Each CEP must also include an estimation of the cost of works shown on the submitted engineering drawings. Once that estimation has been confirmed by the City’s Engineer, the following fees are payable for each CEP submitted and must be paid prior to the City of Hobart commencing assessment of the engineering drawings in each CEP:
Value of Building Works Approved by Planning Permit Fee: · Up to $20,000: $150 per application. · Over $20,000: 2% of the value of the works as assessed by the City's Engineer per assessment.
These fees are additional to building and plumbing fees charged under the Building and Plumbing Regulations.
Once the CEP is lodged via the Online Service Development Portal, if the value of building works approved by your planning permit is over $20,000, please contact the City’s Development Engineer on 6238 2715 to confirm the estimation of the cost of works shown on the submitted engineering drawings has been accepted.
Once confirmed, pleased call one of the City’s Customer Service Officers on 6238 2190 to make payment, quoting the reference number (ie. CEP number) of the Condition Endorsement you have lodged. Once payment is made, your engineering drawings will be assessed.
BUILDING PERMIT
You may need building approval in accordance with the Building Act 2016. Click here for more information.
This is a Discretionary Planning Permit issued in accordance with section 57 of the Land Use Planning and Approvals Act 1993. PLUMBING PERMIT
You may need plumbing approval in accordance with the Building Act 2016, Building Regulations 2016 and the National Construction Code. Click here for more information.
OCCUPATION OF THE PUBLIC HIGHWAY
You may require a permit for the occupation of the public highway for construction (e.g. placement of skip bin, crane, scissor lift etc). Click here for more information.
You may require a road closure permit for construction. Click here for more information.
You may require a Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve). Click here for more information. WORK WITHIN THE HIGHWAY RESERVATION
Please note development must be in accordance with the Hobart City Council’s Infrastructure By law. Click here for more information.
DRIVEWAY SURFACING OVER HIGHWAY RESERVATION
If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future.
REDUNDANT CROSSOVERS
Redundant crossovers are required to be reinstated under the Hobart City Council’s Infrastructure By law. Click here for more information.
ACCESS
Designed in accordance with LGAT IPWEA – Tasmanian standard drawings. Click here for more information.
CROSS OVER CONSTRUCTION
The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design. Click here for more information.
FEES AND CHARGES
Click here for information on the Council's fees and charges.
DIAL BEFORE YOU DIG
Click here for dial before you dig information. |
||||||||||||||||||||||||
|
Thomas That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
Item 9.1 was then taken.
IN ACCORDANCE WITH REGULATION 16(5) OF THE LOCAL GOVERNMENT (MEETING PROCEDURES) REGULATIONS 2015
File Ref: F19/152056; 13-1-9 Ref: Open FGC 7.1, 10/12/2019 |
|||||||||||||||||||||||||
|
Alderman Tanya Denison Motion: “That a report be prepared (including an external audit) to review the ongoing environmental and financial case for continuing with the program of installing solar panels on Council buildings that was commenced in 2016, given the increasing proportion of renewable energy generation in Tasmania and technological advances in other sectors such as transport over the past three years.” |
||||||||||||||||||||||||
|
Rationale:
In June, 2016, the Finance Committee and subsequently Council supported a motion to install solar panels on several Council buildings. The motion proposed the following installations:
The total cost for the program was estimated at $571,400 and an annual saving of $82,500 was projected, delivering a payback period of 7 years, with an asset life of 25 years. The saving in grid electricity consumption was estimated at 450,000 kWh per year “equivalent to a reduction in greenhouse gas emissions of 100 tonnes CO2 equivalent per annum”.
In 2017, an application was approved by the City Planning Committee and subsequently by Council for the installation of 88 x 290W array of panels to the annex of Town Hall (50 Macquarie St) at a cost of $2892. In December 2018, the Planning Committee approved an application for 42 x 310W array of panels to the upper level of the Town Hall Argyle wing at a cost of $13,000 and 108 x 310 panels at City Hall at a cost of $25,000. In July 2019, the Planning Committee and subsequently Council approved the installation of 85 x 310W solar panels at Mawson Pavilion at a cost of $3000. This application was described as being part of the solar panel installation program, however this location was not identified in the 2016 motion.
These applications were for Development Approval and no further financial or emission reduction information was required or provided to support the applications. Most solar panel arrays have been installed without requiring Planning approval. The 2018-19 Annual Report states that $355,866 was spent from 6/9/2018 to 31/1/2019 for “P18/90 Solar supply and installation on Council buildings”. Capital Work in Progress for “Solar Array Installations on Council Buildings” was reported to be $628,000 for 2018-19 and $570,000 for 2017-18. $168,000 is currently committed for “Solar Systems Supply and Installation”.
The 2018-19 Annual Report states that Capital Work in Progress for “Solar Array Installations on Council Buildings” was $433,000 in 2016-17 and $570,000 in 2017-18 but does not identify any contracts.
The 2016-17 Annual Report states that $460,200 was spent from 7/10/2016 to 30/6/2017 for “P16/49 Solar systems supply and installation on City buildings”. This report noted that the DKHAC system had been expanded to 402 kW (34% larger than proposed in the 2016 program). Capital Work in Progress for “Solar Array Installations on Council Buildings” was reported to be $433,000 for 2016-17.
Spending on solar panel installation since the approval of the program in 2016 has been well beyond the initial value approved by Council, and is still ongoing. When the program was approved in 2016, it was expected that the solar panels would save 11 to 25 cents per kWh with the sale of renewable energy certificates contributing to the expected savings.
Although there is likely to be savings in operating costs from generating energy from solar panels compared to purchasing power from the grid, the panels need to be depreciated, interest on loans needs to be paid and there may be maintenance and eventually disposal costs. It is probable that the financial case for installing solar panels has changed over the past three years.
Around 91% of power generated in Tasmania is from renewable sources (wind and hydro) and the state is on track to achieve 100% renewable by 2022. Due to the state’s high proportion of renewable energy generation, the emission reductions from installing solar arrays in Tasmania is lower than what was projected in 2016 using a standardised greenhouse gas emissions coefficient.
The initially projected 450,000 kWh of saved power at a cost of $571,400 is equivalent to around 18 tonnes of CO2-e per year in emissions using recent Tasmanian data, rather than the reported 100 tonnes, representing 9 houses rather than 50. From 2022, there will be no relative reduction in GHG (greenhouse gas) emissions at all from solar panel energy generation.
Although additional solar power generation could supplement Council’s self sufficiency in emergency situations, it already has significant generator and existing solar generation capacity to sustain essential operations.
There are alternative investments than can be made to reduce emissions or achieve other environmental and financial benefits. For example, transport contributes a significant proportion of Tasmania’s GHG emissions, and transport technology has evolved significantly since 2016. The Council manages a significant fleet of vehicles and plant, and has a large workforce travelling to and from work each day. With the GHG emission reductions from solar panels in Tasmania approaching zero, a review of Council’s solar panel installation program is needed.”
https://www.energy.gov.au/publications/australian-energy-update-2018
The General Manager reports:
“In line with the Council’s policy in relation to Notices of Motion, I advise that the matter is considered to be within the jurisdiction of the Hobart City Council as it relates to the supply of energy to Council buildings.
|
||||||||||||||||||||||||
|
sherlock That the motion be adopted. |
||||||||||||||||||||||||
|
Amendment
Ewin That the external audit be removed from the motion.
|
||||||||||||||||||||||||
|
AMENDMENT LOST
VOTING RECORD
|
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
COUNCIL RESOLUTION: |
||||||||||||||||||||||||
|
That a report be prepared (including an external audit) to review the ongoing environmental and financial case for continuing with the program of installing solar panels on Council buildings that was commenced in 2016, given the increasing proportion of renewable energy generation in Tasmania and technological advances in other sectors such as transport over the past three years. |
Item 9.4 was then resumed.
11. Elizabeth Street Bus Mall - South West Side Upgrade File Ref: F19/148983 Ref: Open CIC 6.2, 11/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The upgrading of the south-west side of Elizabeth Street between Collins Street and Macquarie Street as described in ‘Option 2’ in the plans forming Attachment A to item 6.2 of the Open City Infrastructure Committee agenda of 11 December 2019 be approved for construction subject to the necessary statutory approvals being obtained. 2. The General Manager be authorised to lodge a development application for the upgrading of the south-west side of the Elizabeth Street Bus Mall. 3. The General Manager be authorised to sign and affix the common seal of the Hobart City Council to the Grant Deed for a funding contribution towards the new bus shelter from the Tasmanian Government. |
||||||||||||||||||||||||
|
Behrakis That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
12. Huon Road - Uphill Bicycle Passing Opportunity Project File Ref: F19/150138 Ref: Open CIC 6.3, 11/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The General Manager be authorised to sign and attach the common seal of the City of Hobart to the grant deed when received for the provision of passing opportunities for vehicle drivers to safely pass uphill bicycle riders on Huon Road. 2. On completion of part 1 of the recommendation, the City of Hobart proceed to procurement of the proposed works for the provision of passing opportunities for vehicle drivers to safely pass uphill bicycle riders on Huon Road between Stephenson Place and 432 Huon Road, as detailed in the concept design drawings provided as Attachment A to item 6.3 of the Open City Infrastructure Committee agenda of 11 December 2019. |
||||||||||||||||||||||||
|
Sherlock That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
13. Campbell Street and Argyle Street Bicycle Connections File Ref: F19/151923 Ref: Open CIC 6.4, 11/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The initial concept design for bicycle facilities on Argyle Street, Campbell Street, Liverpool Street and Bathurst Street, including sections of separated cycleways is provided as Attachment A to item 6.4 of the Open City Infrastructure Committee agenda of 11 December 2019 be used as the basis to commence public engagement with key stakeholders in early 2020. (i) That consultation occur with relevant stakeholders, in particular, property owners, land owners, residents and lease holders of the affected streets. (ii) The facilities be trialled for a one year period. 2. A further report detailing the proposal be provided to the Council following the public engagement with key stakeholders.
3. A report be provided on the feasibility of introducing priority car pool and bus lanes on Campbell and Argyle Streets. |
||||||||||||||||||||||||
|
Ewin That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
14. Arrangement to Work Cooperatively on Waste Management and Resource Recovery - Southern Tasmanian MOU File Ref: F19/157359 Ref: Supplementary Open CIC 10, 11/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The General Manager be authorised to sign the Memorandum of Understanding for an arrangement for Southern Tasmanian Councils to work co-operatively on waste management and resource recovery issues and projects for the southern Tasmanian region. (i) The City’s contribution of $13,000 per annum, be approved.
2. The General Manager be authorised to delegate an employee to be a member of the steering committee. |
||||||||||||||||||||||||
|
Burnet That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
15. Aboriginal Commitment and Action Plan - Final Endorsement File Ref: F19/148650; 17/225 Ref: Open CCEC 6.1, 4/12/2019 |
|||||||||||||||||||||||||
|
That the Council endorse the final Aboriginal Commitment and Action Plan January 2020 – January 2022, marked as Attachment C to item 6.1 of the Open Community Culture and Events Committee agenda of 4 December 2019 for implementation. |
||||||||||||||||||||||||
|
Sherlock That the recommendation be adopted. |
||||||||||||||||||||||||
|
Amendment
Burnet
That the first deliverable to Action 6 within the Aboriginal Commitment and Action Plan be amended by the deletion of the words “and make research findings public, with an appropriate response.” in the dot point, and with the inclusion of an additional dot point which reads as follows:
· Make research findings public, with an appropriate response including the potential of a formal apology to Tasmanian people at the appropriate time.
|
||||||||||||||||||||||||
|
Procedural Motion
THOMAS That the amendment be deferred to Committee for consideration.
|
||||||||||||||||||||||||
|
PROCEDURAL MOTION LOST VOTING RECORD
|
||||||||||||||||||||||||
|
AMENDMENT CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
SUBSTANTIVE MOTION CARRIED
VOTING RECORD
|
||||||||||||||||||||||||
|
COUNCIL RESOLUTION: |
||||||||||||||||||||||||
|
That the Council endorse the final Aboriginal Commitment and Action Plan January 2020 – January 2022, marked as Attachment C to item 6.1 of the Open Community Culture and Events Committee agenda of 4 December 2019 for implementation, with an amendment to the first deliverable to Action 6 within the Plan to read as follows:
Engage a researcher to develop an employee resource about Aboriginal language, stories and history relevant to specific sites and Hobart broadly, to support current and future work. · Include research into the history of the City of Hobart as an organisation. · Make research findings public, with an appropriate response including the potential of a formal apology to Tasmanian people at the appropriate time. |
File Ref: F19/148634; 17/226 Ref: Open CCEC 6.2, 4/12/2019 |
|||||||||||||||||||||||
|
That: 1. The Council authorise the Lord Mayor to sign the Memorandum of Understanding on the participation of local councils in the National Redress Scheme for Institutional Child Sexual Abuse, marked as Attachment A to item 6.2 of the Open Community Culture and Events Committee agenda of 4 December 2019. 2. Given Elected Members often attend functions where there are young and vulnerable community members present a report be prepared investigating the requirement for Elected Members to undertake a Police check and registration to work with vulnerable people. The report to also consider the referral of the matter be to the Local Government Association of Tasmania for consideration. |
||||||||||||||||||||||
|
SHERLOCK That the recommendation be adopted. |
||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
17. Social Inclusion Index - Connected Community Program File Ref: F19/151182; 19/109 Ref: Open CCEC 6.3, 4/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The Council endorse the establishment of a Greater Hobart Housing and Homelessness sub-index as an addition to the Connected Community Program with the Connected Hobart Action Plan. 2. The Council review and accept the identified data point inclusions (inputs) to a Greater Hobart Housing and Homelessness Index as identified in the report marked as item 6.3 on the Open Community Culture and Events Committee agenda of 4 December 2019. 3. The Council pursue data sharing agreements with the relevant State and Federal authorities to enable access to reliable de-identified data for use in a Housing and Homelessness Index. 4. The Council endorse further analysis to establish requirements for the development of a fully representative Social Inclusion Index incorporating data sources for health, safety, education, employment, economic and transport domains.
|
||||||||||||||||||||||||
|
Sherlock That the recommendation be adopted. |
||||||||||||||||||||||||
|
Briscoe
That regular reports be provided to the relevant Council committee in relation to progress on both the establishment and movement of the index.
|
||||||||||||||||||||||||
|
AMENDMENT CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
SUBSTANTIVE MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||||
|
COUNCIL RESOLUTION: |
||||||||||||||||||||||||
|
That: 1. The Council endorse the establishment of a Greater Hobart Housing and Homelessness sub-index as an addition to the Connected Community Program with the Connected Hobart Action Plan. 2. The Council review and accept the identified data point inclusions (inputs) to a Greater Hobart Housing and Homelessness Index as identified in the report marked as item 6.3 on the Open Community Culture and Events Committee agenda of 4 December 2019. 3. The Council pursue data sharing agreements with the relevant State and Federal authorities to enable access to reliable de-identified data for use in a Housing and Homelessness Index. 4. The Council endorse further analysis to establish requirements for the development of a fully representative Social Inclusion Index incorporating data sources for health, safety, education, employment, economic and transport domains. 5. Regular reports be provided to the relevant Council committee in relation to progress on both the establishment and movement of the index.
|
18. Public Art - From the Shadows Submission File Ref: F19/147437 Ref: Open CCEC 6.4, 4/12/2019 |
|||||||||||||||||||
|
That the Council decline the request by From the Shadows Inc. for a contribution of $30,000 towards one sculpture noting that there is not a budget allocation for this project in the 2019-20 financial year and the public art annual allocation is fully committed to the delivery of City of Hobart initiated and implemented public art projects. |
||||||||||||||||||
|
Ewin That the recommendation be adopted. |
||||||||||||||||||
|
MOTION CARRIED
VOTING RECORD
|
19. City of Hobart Multi-Storey Car Parks - Removal of Early Bird Parking File Ref: F19/152367; 35-7-1/10 Ref: Open FGC 6.1, 10/12/2019 |
|||||||||||||||||||||||
|
That early bird parking be reduced over the six-month period from 1 January to 30 June 2020 and completely removed from the Hobart Central and Centrepoint Car Parks from 1 July 2020. |
||||||||||||||||||||||
|
Burnet That the recommendation be adopted. |
||||||||||||||||||||||
|
Amendment
Denison
That: 1. The Early Bird parking program be removed completely from 1 January 2021.
2. The Council notify the removal of the service to relevant stakeholders including customers, businesses, car park operators and Metro and collaborate regarding alternative transport options.
3. Number plate recognition be brought forward as a matter of urgency.
|
||||||||||||||||||||||
|
AMENDMENT CARRIED VOTING RECORD
|
||||||||||||||||||||||
|
SUBSTANTIVE MOTION CARRIED VOTING RECORD
|
||||||||||||||||||||||
|
COUNCIL RESOLUTION: |
||||||||||||||||||||||
|
That: 1. The Early Bird parking program be removed completely from the Hobart Central and Centrepoint Car Parks from 1 January 2021.
2. The Council notify the removal of the service to relevant stakeholders including customers, businesses, car park operators and Metro and collaborate regarding alternative transport options.
3. Number plate recognition be brought forward as a matter of urgency.
|
20. Draft City to Gardens Way Connectivity and Wayfinding Plan - Community Engagement File Ref: F18/44619 Ref: Open PRC 6.2, 5/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The Draft City to Gardens Way Connectivity and Wayfinding Plan, marked as Attachment A to item 6.2 of the Open Parks and Recreation Committee agenda of 5 December 2019, be endorsed for release for community engagement for a four week period commencing early 2020. 2. A further report be provided detailing the outcome of community engagement and presenting the final City to Gardens Way Connectivity and Wayfinding Plan, including an implementation plan. (i) The implementation plan to outline future and ongoing maintenance funding requirements. |
||||||||||||||||||||||||
|
Burnet That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
21. Wilson Street, North Hobart - Proposed Upgrade to Pocket Park File Ref: F19/148261; RO922 Ref: Open PRC 6.3, 5/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The landscape plan for the Wilson Street Pocket Park, North Hobart, marked as Attachment A to item 6.3 of the Open Parks and Recreation Committee agenda of 5 December 2019 be endorsed. 2. Funding for site improvement works be considered when the Council determines the 2020-21 Capital Works Program and Annual Budget at an estimated cost of $21,100 with an estimated annual operational expense of $1,000 per annum.
|
||||||||||||||||||||||||
|
Burnet That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
22. Long Beach Reserve, Lower Sandy Bay - Proposed Replacement Public Toilet Facilities - Community Consultation Outcomes File Ref: F19/145948; F19/65415 Ref: Open PRC 6.4, 5/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The concept designs for replacement public toilet facilities located at Long Beach Reserve, Lower Sandy Bay, marked at Attachment A to item 6.4 of the Open Parks and Recreation Committee agenda of 5 December 2019, be approved. 2. The General Manager be authorised to submit a development application for the development and to secure all statutory approvals for construction to commence in 2019/2020.
|
||||||||||||||||||||||||
|
Sherlock That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED VOTING RECORD
|
23. Tolmans Hill Park - Concept Plans for Public Toilets and Barbecue Facilities - Community Engagement File Ref: F19/148043 Ref: Open PRC 6.5, 5/12/2019 |
|||||||||||||||||||||||||
|
That: 1. The Concept Plans for the development of new toilets and barbecue facilities at Tolmans Hill Park, Tolmans Hill, marked as Attachment A to item 6.5 of the Open Parks and Recreation Committee agenda of 5 December 2019, be endorsed for public release to enable community engagement to be undertaken. 2. A further report be provided to the Council following community engagement for approval of the plan, to allow a development application to be lodged. |
||||||||||||||||||||||||
|
Thomas That the recommendation be adopted. |
||||||||||||||||||||||||
|
MOTION CARRIED
VOTING RECORD
|
That the Council resolve by absolute majority that the meeting be closed to the public pursuant to regulation 15(1) of the Local Government (Meeting Procedures) Regulations 2015 because the items included on the closed agenda contain the following matters:
· Leave of absence · Information of a personal nature · Information of a commercial nature · Information relating to lease of Council land
The following items were discussed:-
Item No. 1 Minutes of the last meeting of the Closed Portion of the Council Meeting Item No. 2 Communication from the Chairman Item No. 3 Leave of Absence Item No. 4 Consideration of supplementary Items to the agenda Item No. 5 Indications of pecuniary and conflicts of interest Item No. 6 Annual Report On The Risk And Audit Panel Activities 2019 LG(MP)R 15(2)(d) and (g) Item No. 7 Performance Indicators LG(MP)R 15(2)(a) Item No. 8 Hobart Active Travel Committee Membership LG(MP)R 15(2)(g)
Item No. 9 City of Hobart 2020 Australia Day Awards - Citizen, Young Citizen and Community Event of the Year LG(MP)R 15(2)(g) Item No. 10 Feeding the Meter Function - Response to Request for Quotation (RFQ) LG(MP)R 15(2)(c)(i) Item No. 11 34 Argyle Street - Development Side Deed LG(MP)R 15(2)(c)(i) Item No. 12 Wellesley Park, South Hobart - Proposed Lease of Small Portion of Land to the Crown LG(MP)R 15(2)(f) and (g) Item No. 13 Regatta Grounds Storage Facility - Lease - Australopers Orienteering Club LG(MP)R 15(2)(f) Item No. 14 Pearces Reserve, 827 Sandy Bay Road, Sandy Bay - Tudor Court Residence and Village - Lease Renewal - Tasmanian Land Conservancy LG(MP)R 15(2)(f)
Sherlock That the recommendation be adopted. |
||||||||||||||||||||||||
MOTION CARRIED BY ABSOLUTE MAJORITY VOTING RECORD
|
The Chairman adjourned the meeting at 8.03pm for a comfort break.
The meeting was reconvened at 8.18pm.
There being no further business the meeting closed at 8.24pm.
TAKEN AS READ AND SIGNED AS A CORRECT RECORD
THIS
28th DAY OF january 2020.
CHAIRMAN