Minutes

Open Portion of the council meeting

Monday, 19 September 2016

AT 5:10 pm

Council Chamber, Town Hall


 

Minutes (Open Portion)

Council Meeting

Page 2

 

19/9/2016

 

 

 ORDER OF BUSINESS

 

PRESENT, APOLOGIES AND LEAVE OF ABSENCE

1.        Confirmation of Minutes. 4

2.        Transfer of Agenda Items. 5

3.        Communication from the Chairman. 5

4.        Notification of Council Worshops. 5

5.        Public Question Time. 5

6.        Petitions. 5

7.        Consideration of Supplementary Items. 5

8.        Indications of Pecuniary and Conflicts of Interest. 6

Reports of Committees. 6

City Planning Committee

9.        Council Acting as Planning Authority. 6

9.1     6-8 Market Place, Hobart - Partial demolition, alterations and extension. 7

9.2     9 Sandy Bay Road, Hobart - Demolition and new development for Hotel with Cafe and Bar and Associated Minor Road Works (Re-advertised - Amended Proposal) 13

9.3     53 Runnymede Street, Battery Point - Partial demolition, alterations and extension  15

9.4     4, 6-12 Wynyard Street and 39 Weld Street, South Hobart - 24 multiple dwellings, levee wall, fencing, public footpath and alterations to traffic circulation. 17

9.5     23 Liverpool Crescent, West Hobart - Extension and Alterations - PLN-16-00567-01  37

9.6     29 Clutha Place, South Hobart - Dwelling and works in road reservation. 41

9.7     21 Colville Street, Battery Point - Alterations. 48

9.8     12a Bellevue Parade, New Town - Six Additional dwellings, partial demolition and alterations to existing dwelling, stormwater infrastructure, parking and access  55

Governance Committee

10.     2015-2016 Annual Plan - Final Report  Period Ended 30 June 2016. 66

11.     Council Committees Review and Governance Matters. 66

Community, Culture and Events Committee

12.     Taste of Tasmania 2016-17 - Transactional Model 70

13.     12 Month Evaluation - City of Hobart Mobile Food Vendor Program Trial 71

14.     Petition - 'No Business in Abuse' Pledge. 71

Finance Committee

15.     Adoption of Guarantee of Loans Policy. 72

16.     Financial Impact and Risk of Direct Investment in Property and Investment in Home Grown Rural and Community Financial Institutions. 73

Parks and Recreation Committee

17.     416 Churchill Avenue, Sandy Bay - Request for Easement - TasNetworks  73

Special Report – General Manager

18.     Climate Change Roundtable and Nomination for Carbon Disclosure Project (CDP) Report and Climate and Energy Workshop 11 - 12 October 2016. 74

19.     Closed Portion of the Meeting.. 75

Supplementary Item

20.     Climate Change Roundtable and Nomination for Carbon Disclosure Project (CDP) Report and Climate and Energy Workshop 11 - 12 October 2016. 76

21.     Future of Hobart Council Centre. 78

 


 

Minutes (Open Portion)

Council Meeting

Page 4

 

19/9/2016

 

 

PRESENT:

 

The Lord Mayor Alderman S L Hickey,

The Deputy Lord Mayor Alderman R G Christie,

Aldermen M Zucco, J R Briscoe, E R Ruzicka, P T Sexton, H C Burnet,
P S Cocker, D C Thomas, A M Reynolds, T M Denison and W F Harvey.

 

Alderman Zucco left the meeting at 7.14 pm and was not present for the final vote on item 11, and was not present for items 12 to 20.

 

APOLOGIES:

 

Nil.

 

LEAVE OF ABSENCE:

 

 Nil.

1.       Confirmation of Minutes

 

The Chairman reports that she has perused the minutes of the meeting of the Open Portion of the Council meeting held on Monday, 5 September 2016, finds them to be a true record and recommends that they be taken as read and signed as a correct record.

 

 

deputy lord mayor

Ruzicka                                                                     That the minutes be signed.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

The minutes were signed.

 

2.       Transfer of Agenda Items

 

Are there any items, which the meeting believes, should be transferred from this agenda to the closed agenda or from the closed agenda to the open agenda, in accordance with the procedures allowed under Section 15 of the Local Government (Meeting Procedures) Regulations 2015?

 

No items were transferred.

3.       Communication from the Chairman

 

150th Anniversary of the Hobart Town Hall

 

The Lord Mayor advised that Sunday 25 September 2016 marks the 150th anniversary of the Hobart Town Hall and that to celebrate this occasion the Council is hosting a family-friendly open day at the Town Hall.  The Lord Mayor encouraged everyone to attend. 

4.       Notification of Council Worshops

 

In accordance with the requirements of the Local Government (Meeting Procedures) Regulations 2015, the General Manager reported that no Council workshops have been conducted since the last ordinary meeting of the Council.

5.       Public Question Time

 

No questions were received.

6.       Petitions

 

No petitions were received.

7.       Consideration of Supplementary Items

Ref: Part 2, Regulation 8(6) of the Local Government (Meeting Procedures) Regulations 2015.

RECOMMENDATION

 

That the Council resolve to deal with any supplementary items not appearing on the agenda, as reported by the General Manager in accordance with the provisions of the Local Government (Meeting Procedures) Regulations 2015.

 

 

 

Zucco

deputy lord mayor                         That the recommendation be adopted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

8.       Indications of Pecuniary and Conflicts of Interest

Ref: Part 2, Regulation 8(7) of the Local Government (Meeting Procedures) Regulations 2015.

 

Aldermen are requested to indicate where they may have any pecuniary or conflicts of interest in respect to any matter appearing on the agenda, or any supplementary item to the agenda, which the committee has resolved to deal with.

 

No interest was indicated.

 

Reports of Committees

 

City Planning Committee

 

9.       Council Acting as Planning Authority

 

In accordance with the provisions of Part 2 Regulation 25 of the Local Government (Meeting Procedures) Regulations 2015, the intention of the Council to act as a planning authority pursuant to the Land Use Planning and Approvals Act 1993 is to be noted.

 

In accordance with Regulation 25, the Council will act as a planning authority in respect to those matters appearing under this heading on the agenda, inclusive of any supplementary items.

 

The Council is reminded that in order to comply with Regulation 25(2), the General Manager is to ensure that the reasons for a decision by a Council or Council Committee acting as a planning authority are recorded in the minutes.

 

 

9.1      6-8 Market Place, Hobart - Partial Demolition, Alterations and Extension

            PLN-16-744 - File Ref: F16/100446

Ref:    Open CPC 7.1.1, 12/9/2016

Application Expiry Date: 30 September 2016

Extension of Time: Not applicable

 

That pursuant to the Sullivans Cove Planning Scheme 1997 and the Hobart Interim Planning Scheme 2015, the Council approve the application for partial demolition, alterations and extension at 8 Market Place, Hobart for the reasons outlined in the officer’s report attached to item 7.1.1 of the Open City Planning Committee agenda of 12 September 2016, and a permit containing the following conditions be issued:

 

 

GEN

 

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­16­744 ­ 6­8 MARKET PLACE HOBART TAS 7000 ­ Final Planning Documents except where modified below.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 


ENG 12

 

 

A construction waste management plan must be implemented throughout construction.

 

A construction waste management plan must be submitted and approved, prior to commencement of work on the site. The Construction Waste Management Plan must include:

 

·      Provisions for the handling transport and disposal of demolition material, including any contaminated waste, to satisfy the above requirement.

 

All work required by this condition must be undertaken in accordance with the approved construction waste management plan.

 

 

Advice: Once the Construction Waste Management Plan has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that solid waste management from the site meets the Council’s requirements and standards.

 

ENGsw6

 

 

All stormwater from the proposed development (including hardstand runoff) must be discharged to the Council’s infrastructure with sufficient receiving capacity prior to first occupation. All costs associated with works required by this condition are to be met by the owner.

 

 

Design drawings and calculations of the proposed stormwater drainage and connections to Council infrastructure must be submitted and approved prior to the commencement of work. The design drawing must be prepared by a suitably qualified person.

 

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

 

Advice: Once the design drawing has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.

 

 

 

ENGtr2

 

 

A construction traffic and parking management plan must be implemented prior to the commencement of work on the site (including demolition).

 

 

The construction traffic (including cars, public transport vehicles, service vehicles, pedestrians and cyclists) and parking management plan must be submitted and approved, prior to commencement work. The construction traffic and parking management plan must:

 

 

a)   Be prepared by a suitably qualified person, by the Council.

 

 

b)   Develop a communications plan to advise the wider community of the traffic and parking impacts during construction.

 

 

c)   Include a start date and finish dates of various stages of works.

d)   Include times that trucks and other traffic associated with the works will be allowed to operate.

 

 

e)   Nominate a superintendant or like to advise the Council of the progress of works in relation to the traffic and parking management with regular meetings during the works.

 

 

All work required by this condition must be undertaken in accordance with the approved construction traffic and parking management plan.

 

 

Advice: Once the construction traffic and parking management plan has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure the safety of vehicles entering and leaving the development and the safety and access around the development site for the general public and adjacent businesses.

 

 

ENG 9

 

 

Accessible parking spaces must be provided at a minimum rate of one accessible space per 100 car parking spaces. All car parking spaces for people with disabilities must be delineated to Australian/NZS Standard, Parking facilities Part 6: Off­street parking for people with disabilities AS/NZS 2890.6: 2009, prior to the commencement of the use.

 

 

Reason for condition

 

 

In the interests of vehicle user safety and the amenity of the development.

 

 

ENG 1

 

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

 

ENV1

 

 

Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site. Sediment controls must be maintained until all areas of disturbance have been stabilised.

 

 

Advice: For further guidance in preparing a Soil and Water Management Plans (SWMP) in accordance with Fact sheet 3 Derwent Estuary Program go to www.hobartcity.com.au development engineering standards and guidelines.

 

 

Reason for condition

 

 

To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State legislation.

 

 

HER 6

 

 

All onsite excavation and disturbance must be monitored. Should any features or deposits of an archaeological nature be discovered on the site during excavation or disturbance:

 

 

a)   all excavation and/or disturbance must stop immediately;

 

b)   a qualified archaeologist must be engaged to attend the site and provide advice and assessment of the features and/or deposits discovered and make recommendations on further excavation and/or disturbance;

 

c)   all and any recommendations made by the archaeologist engaged in accordance with (b) above must be complied with in full; and (d) all features and/or deposits discovered must be reported to the Council within fourteen (14) days of the discovery; and

 

d)   a copy of the archaeologists advice, assessment and recommendations obtained in accordance with paragraph (b) above must be provided to Council within fourteen (14) days of receipt of the advice, assessment and recommendations.

 

 

Excavation and/or disturbance must not recommence unless and until approval is granted from the Council.

 

 

Reason for condition

 

 

To ensure that work is planned and implemented in a manner that seeks to

understand, retain, protect, preserve and manage significant archaeological evidence.

 

 

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

 

 

Condition endorsement

 

 

As a condition endorsement is required by a planning condition above, please forward documentation required to satisfy the condition to rfi­information@hobartcity.com.au, clearly identifying the planning permit number, address and the condition to which the documentation relates.

 

 

Once approved, the Council will respond to you via email that the condition/s has been endorsed (satisfied). Detailed instructions can be found at: www.hobartcity.com.au/Development/Planning/How_to_obtain_a_condition_endorsement.

 

 

Building permit

 

Building permit in accordance with the Building Act 2000;

http://www.hobartcity.com.au/Development/Building 

 

Plumbing permit

 

Plumbing permit under the Tasmanian Plumbing Regulations 2014;

 

 

http://www.hobartcity.com.au/Development/Plumbing

 

 

Permit to occupy the public highway

 

 

Permit for the occupation of the public highway for construction or special event (e.g. placement of skip bin, crane, scissor lift etc).

 

 

http://www.hobartcity.com.au/Transport/Permits/Construction_Activities_Special_Even ts_in_the_Road_Reservation

 

 

Temporary parking permit for construction vehicles

 

 

Temporary parking permits for construction vehicles i.e. residential or meter parking/loading zones.

 

 

http://www.hobartcity.com.au/Transport/Permits/Parking_Permits
Waste disposal ­Top ten tips
http://www.hobartcity.com.au/Environment/Recycling_and_Waste
Fees and charges
http://www.hobartcity.com.au/Council/Fees_and_Charges

Dial before you dig

 

 

www.dialbeforeyoudig.com.au

 

 

If you do not have access to the Council’s electronic web page, please phone the

Council (City Planning) on 6238 2715 for assistance.

 

 

Briscoe

Denison                                                   That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

Burnet

Deputy Lord Mayor Christie

Cocker

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

9.2      9 Sandy Bay Road, Hobart - Demolition and New Development for Hotel with Cafe and Bar and Associated Minor Road Works (Re-advertised - Amended Proposal)

            PLN-15-01476-01 - File Ref: F16/102061

Ref:    Open CPC 7.2.1, 12/9/2016

Application Expiry Date: 19 September 2016

Extension of Time: Not applicable

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council refuse the application for demolition and new develpment for hotel with cafe and bar and associated minor road works(re-advertised – amended proposal) at 9 sandy Bay Road, Hobart for the following reasons:

 

 

1.           The proposal does not meet clause 8.10.2 of the Hobart Interim Planning Scheme 2015 in that it does not meet the purpose of the Urban Mixed Use zone because it doesn't provide for the integration of a commercial use with the surrounding residential uses, it doesn't provide a density responsive to the character of the surrounding area, and it doesn't encourage the retention of the existing residential use on the site or the reuse or adaptation of the existing building on the site.

 

 

2.           The proposal does not meet the acceptable solution or the performance criteria for clause 15.4.1 of the Hobart Interim Planning Scheme 2015 because the building height exceeds

10m and is not compatible with the scale of nearby buildings.

 

 

3.           The proposal does not meet the acceptable solution or the performance criteria for clause E6.6.1 of the Hobart Interim Planning Scheme 2015 because the amount of on site car parking provided will not be sufficient to meet the reasonable needs of users.

 

 

Briscoe

Thomas                                                    That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Deputy Lord Mayor Christie

Lord Mayor Hickey

Zucco

Denison

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Harvey

 

 

 

 

Zucco

Hickey                                                                                                                         

 

That item 9.4 be taken next.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Item 9.4 was then taken.

 

9.3      53 Runnymede Street, Battery Point - Partial Demolition, Alterations and Extension

            PLN-16-00370-01 - File Ref: F16/101957

Ref:    Open CPC 7.2.2, 12/9/2016

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council refuse the application for partial demolition, alterations and extension at 53 Runnymede Street, Battery Point for the following reasons:

1.      The proposed development does not meet performance criterion E13.7.2 P1 of the Hobart Interim Planning Scheme 2015 as the development will result in loss of historic cultural heritage significance to the place through incompatible design, including in height and form.

2.      The proposed development does not meet performance criterion E13.7.2 P2 of the Hobart Interim Planning Scheme 2015 as the development is not designed to be subservient and complementary to the place through characteristics including its built form.

3.      The proposed development does not meet performance criterion E13.7.2 P3 of the Hobart Interim Planning Scheme 2015 as the built form does not respond to the dominant heritage characteristics of the place.

4.      The proposed development does not meet performance criterion E13.7.2 P4 of the Hobart Interim Planning Scheme 2015 as the extension to the existing building detracts from the historic cultural heritage significance of the place.

5.      The proposed development does not meet performance criterion E13.8.4 P3 of the Hobart Interim Planning Scheme 2015 as the height of the proposal will be obtrusive in the streetscape and will detract from the pattern of development that is a characteristic of the cultural heritage significance of Heritage Precinct BP1 in the vicinity of the site.

 

 

Briscoe

Harvey                                                    That the recommendation be adopted.

 

 

 

Procedural Motion

 

Zucco

Ruzicka                                                                                                                      

 

That the matter be deferred to allow the accuracy of the montage to be verified.

 

 

PROCEDURAL MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

Burnet

Deputy Lord Mayor Christie

Cocker

Zucco

Harvey

Briscoe

 

Ruzicka

 

Sexton

 

Thomas

 

Reynolds

 

Denison

 

 

 

 

Item 9.8 was then taken.

 

9.4      4, 6-12 Wynyard Street and 39 Weld Street, South Hobart - 24 Multiple Dwellings, Levee Wall, Fencing, Public Footpath and Alterations to Traffic Circulation

            PLN-16-00406-01 - File Ref: F16/100968;  PLN-16-00406-01

Ref:    Open CPC 7.2.3, 12/9/2016

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for 24 multiple dwellings, levee wall, fencing, public footpath and alterations to traffic circulation at 4, 6­12 Wynyard Street, South Hobart for the reasons outlined in the officer’s report attached to item 7.2.3 of the Open City Planning Committee agenda of 12 September 2016, and a permit containing the following conditions be issued:

 

GEN

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­16­00406­01 ­ 4, 6­12 Wynyard ­ SOUTH HOBART ­ Final Planning Documents except where modified below.

 

Reason for condition

 

To clarify the scope of the permit.

 

TW

 

The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2016/00521­HCC dated 27 June 2016 as attached to the permit.

 

Reason for condition

 

To clarify the scope of the permit.

 

ENGsw2

 

The Council’s stormwater infrastructure adjacent to & within the subject site must be protected from damage during the construction of the development.

 

Digital copies of a pre construction work CCTV video and associated report(s) of any Council stormwater main within two metres of the works (which will not be abandoned) must be submitted to Council prior to issue of any consent under the Building Act 2000 for the relevant stage.

 

Digital copies of a post construction work CCTV video and associated report(s) of any Council stormwater main within two metres of the works must be submitted to Council after completion of all work but prior to the issue of any Certificate of Completion for the relevant stage. However should the main still be within the 12 month maintenance period, this post work CCTV may instead be submitted at the end of the maintenance period (ie a single CCTV to satisfy both maintenance period and post works).

 

The pre and post construction work CCTVs will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner fails to provide to the Council a pre construction works CCTV video of the Council’s infrastructure, then any damage to the Council infrastructure identified in the post construction CCTV will be deemed to be the responsibility of the owner.

 

Advice: Due to the diameter of the main, a tractor camera will be required to obtain adequately clear footage.

 

Reason for condition

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENGsw3

 

The proposed works (including footings and overhangs) must be designed to ensure the long term protection of and access to any of Council’s new, existing or diverted stormwater infrastructure.

 

A detailed design for all works within two metres of public stormwater infrastructure certified by a suitably qualified engineer must be submitted and approved prior to issue of any consent under the Building Act for the relevant stage. The detailed design must:

·      Demonstrate how the design will ensure the protection of and provide access to Council’s stormwater mains (a minimum of 1m horizontal clearance is required from any part of any building to all mains);

·      Demonstrate that the works do not impose any loads on the storm water main and the structure is entirely independent of the main and its trenching, including certification by a suitably qualified engineer; and

·      Include (but not be limited to) cross­sections, minimum separation, adequate cover.

Prior to construction of any footings within two metres of public stormwater infrastructure, the stormwater pipe must be accurately located by the developer, and the clearance must be inspected and confirmed by the Council's Project and Development Inspector to ensure the minimum separation is achieved.

 

The Council's Project and Development Inspector, must be contacted on phone (03) 6238 2967 at least 24 hours prior to the commencement of any works.

 

Prior to issue of any Certificate of Completion for the relevant stage a suitably qualified engineer must confirm the installation of the works within two metres of Council’s stormwater main is in accordance with the approved drawings and complies with this condition. Should any remediation works be required, these must be carried out at the developer’s cost.

 

All work required by this condition must be undertaken in accordance with the approved design.

 

Advice: Once the detailed design drawings has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). The Council's Project and Development Inspector, must be contacted on phone (03) 6238 2967 at least 24 hours prior to the commencement of any works.

 

Reason for condition

 

To ensure the protection of Council’s hydraulic infrastructure.

 

ENGsw4

 

The sites must be drained to Council infrastructure. The new stormwater connection(s) must be constructed, and existing redundant connections must be removed at the owner’s expense, prior to issue of a Certificate of Completion for the first Stage.

 

Detailed design drawings showing the proposed connections must be submitted and approved, prior to issue of any consent under the Building Act 2000 for the first Stage. The detailed design drawings must:

·      Show the location of the proposed connections and any existing connections;

·      Demonstrate the size and design of the connection(s) such that they are appropriate to safely service the development and ensure protection of the receiving waterway, including:

1.      Maintenance of 3 month flows for the fully developed site

2.      Erosion and scour protection

3.      Minimal hydraulic intrusion into the Rivulet

4.       Backflow prevention (upstream of the connection point and privately owned and maintained)

·      Include long­sections and cross­sections of the proposed connection(s) clearly showing any nearby services, cover, size, material, delineation of public and private infrastructure, protection of the connections where they pass under the levee wall; and

·      Be checked and certified by a qualified and experienced engineer.

All work required by this condition must be undertaken in accordance with the approved detailed design drawings.

 

Advice: Once the detailed design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Please note that once the condition endorsement has been issued you will need to contact Council’s City Infrastructure Division to initiate an application for service connection.

 

Reason for condition

 

To ensure the site is drained adequately.

 

ENGsw5

 

All proposed new or diverted public stormwater infrastructure (including any drainage required by the proposed alterations to Wynyard Street) must be constructed prior to issue of a completion certificate for the relevant stage.

 

Engineering design drawings must be submitted and approved, prior to issue of any consent under the Building Act for the relevant stage. The engineering design drawings must:

·      Be certified by a qualified and experienced Engineer;

·      Show in both plan and long­section any proposed stormwater mains, including but not limited to: lot connections (proposed or existing for benefitting properties); clearances (e.g to buildings, structures, private pipework, other services, etc), cover, extent of fill, gradients, sizing, material, pipe class, adequate working platforms around manholes, connections to existing Council infrastructure, easements, inspection openings, and erosion control;

·      Clearly distinguish between public and private infrastructure;

·      Be substantially in accordance with the LGAT drawings.

All work required by this condition must be undertaken in accordance with the approved engineereing design drawings.

 

Advice: Once the engineering design drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Please note that once the condition endorsement has been issued you will need to contact Council’s Road and Environmental Engineering Unit to obtain a Permit to Construct Public Infrastructure. All new public infrastructure will be subject to a 12 month maintenance period before being taken over by Council (subject to satisfactory final inspection including CCTV) and will require payment of a maintenance bond. Note that the engineering drawings for public infrastructure are separate from and do not form part of any plumbing permit documentation.

 

Reason for condition

 

To ensure Council’s hydraulic infrastructure meets acceptable standards.

 

ENGsw6

 

The stormwater service to any property affected by the works is to be maintained at the developer’s cost.

 

Prior to the issue of consent under the Building Act for any stage which involves abandonment or removal of any existing public stormwater main or branch, CCTV video and associated report must be submitted demonstrating that all connections into that main or branch have been identified. Engineering plans detailing alternate servicing for each benefitting property (including temporary works to maintain services during construction) must be approved by Council prior to issue of consent under Building Act for the relevant stage and installed at the developer’s cost prior to issue of any Certificate of Completion for the relevant stage.

 

Advice: Once the CCTV, report and plans have been received the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To maintain service to Council’s existing customers.

 

ENGsw7

 

Stormwater pre­treatment and detention for stormwater discharges from the development must be installed prior to issue of a Certificate of Completion for the first Stage.

 

A stormwater management report and design must be submitted and approved, prior to issue of any consent under the Building Act 2000 for the first Stage. The stormwater management report and design must:

 

1.      be prepared by a suitably qualified engineer;

2.      include detailed design of the proposed treatment train, including final estimations of contaminant removal;

3.      include detailed design and supporting calculations of detention, sized such that there is no increase in flows from the developed site up to the 3 month ARI storm events;

4.      include a Stormwater Management Summary Plan that outlines theobligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; cleanout procedures; descriptions and diagrams of how the installed systems operate; details of the life of assets and replacement requirements.

All work required by this condition must be undertaken and maintained in accordance with the approved stormwater management report and design.

 

Advice: Once the stormwater management report and design has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To protect natural watercourses, to comply with relevant State legislation.

 

ENG 13

 

An ongoing waste management plan for all insert commercial or domestic waste and recycling must be implemented post construction.

 

A waste management plan must be submitted and approved, prior to commencement of work on the site. A waste management plan must include provisions for commercial waste services for the handling, storage, transport and disposal of domestic waste and recycle bins from the development.

 

All work required by this condition must be undertaken in accordance with the approved waste management plan.

 

Advice: Once the waste management plan has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To ensure that solid waste management from the site meets the Council’s requirements and standards.

 

ENGtr2

 

A construction traffic and parking management plan must be implemented prior to the commencement of work on the site (including demolition).

 

The construction traffic (including cars, public transport vehicles, service vehicles, pedestrians and cyclists) and parking management plan must be submitted to and approved by Council, prior to commencement work. The construction traffic and parking management plan must:

1.      be prepared by a suitably qualified person;

2.      develop a communications plan to advise the wider community of the traffic and parking impacts during construction;

3.      include a start date and finish dates of various stages of works;

4.      include times that trucks and other traffic associated with the works will be allowed to operate; and

5.      nominate a superintendant or like to advise the Council of the progress of works in relation to the traffic and parking management with regular meetings during the works.

All work required by this condition must be undertaken in accordance with the approved construction traffic and parking management plan.

 

Advice: Once the construction traffic and parking management plan has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To ensure the safety of vehicles entering and leaving the development and the safety and access around the development site for the general public and adjacent businesses.

 

ENG 2

 

Vehicle crash barriers compliant with the Australian/New Zealand Standard AS / NZS 1170.1 must be installed prior to the first occupation.

 

A certified design/ report prepared by a suitably qualified Engineer, to satisfy the above requirements, must be provided to the Council prior to the issuing of any permit under the Building Act 2000.

 

All works, required by this condition must be undertaken in accordance with certified design/report. Upon completion the barriers must be inspected by a qualified engineer and a certification submitted to the Council, confirming that the installed barriers comply with the above requirement.

 

Reason for condition

 

To ensure that the safety of users of the driveway/parking and compliance with the standard.

 

ENG 4

 

The driveway and car parking areas approved by this permit must be constructed to a sealed standard and surface drained prior to the first occupation.

 

Reason for condition

 

To ensure safe access is provided for the use.

 

ENG 8

 

All external parking spaces must be delineated by means of white or yellow lines 80mm to 100mm wide, or white or yellow pavements markers in accordance to Australian/NZS Standard, Parking facilities Part 1: Off­street car parking AS/NZS 2890.1, prior to the commencement of the use.

 

Reason for condition

 

In the interests of vehicle user safety and the amenity of the development.

 

ENG 9

 

 

Any car parking spaces for people with disabilities must be delineated to Australian/NZS Standard, Parking facilities Part 6: Off­street parking for people with disabilities AS/NZS 2890.6: 2009, prior to the commencement of the use.

 

Reason for condition

 

In the interests of vehicle user safety and the amenity of the development.

 

ENG 3

 

The driveway car parking and manoeuvring areas, design must be submitted to the Council, prior to the issuing of any permit under the Building Act 2000.

 

The driveway car parking and manoeuvring areas, design must be prepared and certified by a suitably qualified engineer that the design is in accordance with the Australian standards AS/NZS 2890.1 or that the design provides for a safe and efficient access.

 

Upon completion of the driveway car parking and manoeuvring areas, documents signed by a suitably qualified engineer, certifying the driveway has been constructed in accordance with the certified design drawings must be lodged with the Council.

 

Reason for condition:

 

To ensure that the safety of users of the driveway/parking.

 

ENG 1

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council. Any damage must be reported immediately to Council.

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

Reason for condition

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

ENGR 3

 

The proposed driveway crossover in Wynyard Street highway reservation to the east of the site must be designed and constructed in accordance with TSD­R09­v1 Urban Roads Driveways and TSD R14­ v1 Type KC vehicular crossing, and TSD­R11­v1 Footpath ­ Urban Roads Footpaths prior to the completion of stage 1 (see advice).

 

Design drawings must be submitted and approved prior to the commencement of work. The design drawing must:

1.       show how the existing spoon drain and footpath at the driveway crossover and either side of it, will be reconstructed to obtain a complaint driveway to the standards above;

2.       show the cross and long section of the driveway crossover and any associated footpath works, within the highway reservation and onto the property; and

3.       be prepared and certified by a suitable qualified person, to satisfy the above requirement.

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

Advice: Once the approved design drawings have been approved Council will issue a condition endorsement (see general advice on how to obtain

condition endorsement).

 

Reason for condition

 

To ensure that works will comply with the Council’s standard requirements.

 

ENG s1

 

The proposed driveway crossover / turning area in Wynyard Street highway reservation to the west of the site must be designed and constructed in accordance with TSD­ R06­v1, TSD­R11­v1 and TSD­ R18­v1, prior to the completion of stage 1 (see advice). Access ramps must be provided at the turning area for pedestrians to be able to travel along the new southern footpath within the highway reservation . Make sure you include LGAT advice.

 

Design drawings must be submitted and approved prior to the commencement of work. The design drawings must:

1.      detail the location and dimensions of footpath, access ramps, road and any other infrastructure (ie stormwater pits) at or near the turning area;

2.       show cross and long sections of the turning area and footpath within the highway reservation and onto the property;

3.      show how the area will be drained and infrastructure required to achieve this;

4.      show the standard at which the road will be constructed too including pavement depths and materials; and

5.      be prepared and certified by a suitable qualified engineer, to satisfy the above requirement.

All work required by this condition must be undertaken in accordance with the approved drawing.

 

Advice: Once the approved design drawings have been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To ensure that works will comply with the Council’s standard requirements.

 

ENG s2

 

The proposed footpath in Wynyard Street highway reservation on the southern side of the road must be designed and constructed in general accordance with TSD­R11­v1 Footpath ­ Urban Roads Footpaths and TSD­R14­v1 Type KC Kerb and Channel, prior to the completion of stage 1 (see advice). Make sure you include LGAT advice.

 

Design drawings must be submitted and approved prior to the commencement of work. The design drawings must:

1.       show cross and long sections of the new footpath and kerb within the highway reservation, ensuring the area is drained;

2.       detail how the new footpath and kerb will transition into the existing footpath and spoon drain; and

3.       be prepared and certified by a suitable qualified engineer, to satisfy the above requirement.

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

Advice: Once the approved design drawings have been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To ensure that works will comply with the Council’s standard requirements.

 

ENGs3

 

The levee wall is to be designed and constructed to resist all likely forces and erosion associated with a flood event and be fully located within private property.

 

Detailed design drawings of all works within the 1% AEP flood zone must be submitted and approved prior to the issue of consent under Building Act for the relevant stage. The design drawings must include:

·      Certification from an accredited and qualified structural engineer that all proposed structures within the flood zone are designed to resist erosion, undermining and likely forces from a flood event;

·      Proposed finished levels of the top of the wall and fill;

·      Cross­sections showing the works and property boundaries;

·      Details of materials and stabilisation techniques to prevent sediment transport and erosion from the fill material; and

·      A Flood Management Summary Plan that outlines the obligations for future property owners to flood management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; descriptions of the installed systems; details of the life of assets and replacement requirements; and division of costs between the two titles.

 

All work required by this condition must be undertaken and maintained in accordance with the approved plans.

 

Advice: Council does not consider the proposed wall height of the modeled 1% AEP flood level at 2100 with no freeboard to meet the intent of s159 of the Building Act 2000. This is particularly relevant to any future development on 39 Weld St. Council also suggests the upper extent of the wall on Weld St frontage is designed to maintain access onto 39 Weld St.

 

Reason for Condition

 

To ensure that the risks associated with inundation are adequately managed.

 

ENGs4

All structures within the flood zone including buildings and flood mitigation measures must be inspected by a suitably qualified and accredited engineer.

 

Certification from a suitably qualified and accredited engineer that the installation has been constructed in accordance with the approved certified design must be provided to Hobart City Council prior issue of a completion certificate for the relevant stage.

 

Reason for Condition

 

To ensure that the risks associated with flooding are adequately managed.

 

ENGsw10

 

All structures within the flood zone must be inspected by a registered surveyor.

 

Certification from a registered surveyor that the Finished Floor Levels and the top of any flood wall are at or above the relevant minimum levels shown on the approved building plans prior to issue of any occupancy/completion certificate for the relevant stage (whichever occurs first).

 

Reason for Condition

 

To ensure that the risks associated with flooding are adequately managed.

 

ENGtrsp 1

 

An increased length of “No Stopping restriction on the eastern side of Wynyard Street (adjacent to the “Moses Bakery”) is to be constructed. All costs associated with works required by this condition are to be met by the owner. All works required by this condition must be installed prior to the first occupation.

 

Design drawing must be submitted to and approved by Council prior to the issuing of any permit under the Building Act 2000.

 

The design drawing must include a site plan indicating any works and signage required to satisfy the above requirement.

 

All work required by this condition must be undertaken in accordance with the approved drawing.

 

Advice: This arrangement must be implemented by the Council’s City Infrastructure Division.

 

Reason for condition

 

To ensure safe and adequate passing space at the Macquarie Street junction.

 

 

ENV2

 

Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.

 

A soil and water management plan (SWMP) must be submitted and approved, prior to the commencement of work. The SWMP must:

 

1.       be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008): http://www.hobartcity.com.au/Development/Engineering_Standards_and _Guidelines;

2.       be in accordance with GES's Site Management Plan dated April 2014;

3.       be in accordance with Wetlands and Waterways Works Manual (DPIWE, 2003), available from:  http://dpipwe.tas.gov.au/conservation/flora­of­ tasmania/tasmanian­vegetation­types/about­tasmanias­wetlands/wetlands­waterways­works­manual.

All work required by this condition must be undertaken in accordance with the approved SWMP.

 

Advice: Once the SWMP has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for Condition

 

To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.

 

ENVHE 1

 

Recommendations in the reports 'Site Management Plan, 6­12 Wynyard Street, April 2014' and 'Environmental Site Assessment, 4 Wynyard Street, June 2016' prepared by Geo­Environmental Solutions (GES) must be implemented. Recommendations conclude that, subject to the implementation of above the site management plan, the proposed use and development of the entire site as described in the current application will not adversely impact on human health or the environment.

 

Reason for condition

 

To ensure that the risk to future occupants of the building remain low and acceptable.

 

ENVHE 4

 

A construction management plan must be implemented throughout the construction works.

 

A construction management plan must be submitted and approved prior to the issuing of any building permit under the Building Act 2000. The plan must include but is not limited to the following:

1.      Identification and disposal of any potentially contaminated waste;

2.      Proposed hours of work (including volume and timing of heavy vehicles entering and leaving the site, and works undertaken on site);

3.      Proposed hours of construction;

4.      Identification of potentially noisy construction phases, such as operation of rock­ breakers, explosives or pile drivers, and proposed means to minimise impact on the amenity of neighbouring buildings;

5.      Control of dust and emissions during working hours;

6.      Proposed screening of the site and vehicular access points during work; and

7.      Procedures for washing down vehicles, to prevent soil and debris being carried onto the street.

All work required by this condition must be undertaken in accordance with the approved plan.

 

Advice: Once the plan has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

Reason for condition

 

To ensure minimal impact on the amenity of adjoining properties and members of the public during the construction period.

 

SURV 1

 

The applicant is to submit to the Council a copy of the Surveyor’s survey notes at the time of lodging the final plan.

 

Reason for Condition

 

To enable the Council to accurately update cadastral layers on the corporate

Geographic Information System.

 

SURV 5

 

The proposed Road and Public Open Space lots are to be transferred in fee simple to the Council at nominal consideration.

 

The land shown on Tasmanian Building Design drawing “Site Plan­Part A SK02, Rev. B as “Public Vehicular Turning Facility in Wynyard Street” between the Wynyard Street title boundary of CT 171031/1 and the face of Fence A shall be shown as "Road" and the land comprised within CT 171031/1 between the rivulet face of the levee wall and the Hobart Rivulet title boundary shall be shown as "Public Open Space"on a Plan of Survey.

 

Prior to the sealing of the final plan an executed and stamp duty assessed Land Titles Office transfer instrument is to be forwarded to the Council together with a cheque made payable to the Land Titles Office for the associated Land Titles Office registration fees.

 

Reason for Condition

 

To ensure that titles to the proposed road and public open space lots issue in the Council.

 

Part 5 1

 

Prior to the issue of consent under the Building Act, the owner(s) of the property must enter into an agreement with the Council pursuant to Part 5 of the Land Use Planning and Approvals Act 1993 with respect to:

·      Ongoing compliance with the approved stormwater management plan for the proposed treatment & detention system; and

·      Ongoing maintenance of all approved flood mitigation measures in accordance with the approved flood management plan.

All costs for the preparation and registration of the Part 5 Agreement must be met by the owner.

 

 

The owner must comply with the Part 5 Agreement which will be placed on the property title.

 

Note: Further information with respect to the preparation of a Part 5 agreement can be found at: http://www.hobartcity.com.au/Development/Planning/Part_5_agreements

 

Reason for condition

 

To ensure that environmental and inundation mitigation measures are maintained.

 

SUBsp 1

 

The Plan of Survey showing the Road and Public Open Space Lots shall be notated on the Council Approval sheet “The Hobart City Council hereby declares pursuant to section 90 of the Local Government (Building and Miscellaneous Provisions) Act 1993 that this dealing is not in contravention of Division 3 of the above Act and this Plan of Survey has been voluntarily submitted under Section 82 to be a Sealed Plan.”

 

The Plan of Survey is to be sealed by Council prior to the issue of a Certificate of Completion (Building) for the first stage of the development.

 

Reason for Condition

 

To ensure that the transfer of the Road and Public Open Space lots to Council can proceed at an appropriate time.

 

ADVICE

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council:

 

Condition Endorsement

 

Where a condition endorsement is required by a planning condition above, please forward documentation required to satisfy the condition to rfi­ information@hobartcity.com.au, clearly identifying the planning permit number, address and the condition to which the documentation relates.

 

Once approved, the Council will respond to you via email that the condition/s has been endorsed (satisfied). Detailed instructions can be found at www.hobartcity.com.au/Development/Planning/How_to_obtain_a_condition_en dorsement

 

Building permit in accordance with the Building Act 2000

 

http://www.hobartcity.com.au/Development/Building

 

Plumbing permit under the Tasmanian Plumbing Regulations 2014

 

http://www.hobartcity.com.au/Development/Plumbing

 

Permit for the occupation of the public highway for construction or special event ( e.g. placement of crane, scissor lift etc)

 

http://www.hobartcity.com.au/Transport/Permits/Construction_Activities_Speci al_Events_in_the_Road_Reservation

 

Permit to Open Up and Temporarily Occupy a Highway (for work in the road reserve)

 

http://www.hobartcity.com.au/Transport/Lighting_Roads_Footpaths_and_Street

_Cleaning/Roads_and_Footpaths

 

Temporary parking permits for construction vehicles i.e. residential or meter parking/loading zones

 

http://www.hobartcity.com.au/Transport/Permits/Parking_Permits

 

Transfer of Road and Public Open Space Lots

 

Council accepts the offer of the transfer of the Road and Public Open Space lots pursuant to section 175 of the Local Government Act 1993. These lots will be transferred to Hobart City Council under the provisions of sections 8(a) and 9 of the Land Acquisition Act 1993. The Open Space lot will be dedicated as Public Land and integrated into the Hobart Rivulet Park.

 

Storm water

 

Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law.

 

http://www.hobartcity.com.au/Council/Legislation

 

Structures close to a Council Storm water main

 

The design of structures (including footings) must provide protection for the Council’s infrastructure. A guide to appropriate designs can be found at:

 

Work within the Highway Reservation

 

Please note development must be in accordance with the Hobart City Council’s Highways By ­law:

http://www.hobartcity.com.au/Council/Legislation 

Driveway surfacing over highway reserve

If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future.

Redundant Crossovers

 

Redundant crossovers are required to be reinstated under the Hobart City Council’s Highways By ­law http://www.hobartcity.com.au/Council/Legislation

 

Access

Designed in accordance with LGAT­ IPWEA Tasmanian standard drawings http://www.hobartcity.com.au/Development/Engineering_Standards_and_Guidelines

 

Cross over construction

 

The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design.

 

http://www.hobartcity.com.au/Transport/Lighting_Roads_Footpaths_and_Street

_Cleaning/Roads_and_Footpaths

 

Storm water/roads/access

 

Services to be designed and constructed in accordance with the (IPWEA) LGAT­ standard drawings.

 

http://www.hobartcity.com.au/Development/Engineering_Standards_and_Guid elines

 

Right of way

 

The private right of way must not be reduced, restricted or impeded in any way, and all beneficiaries must have complete and unrestricted access at all times.

 

You should inform yourself as to your rights and responsibilities in respect to the private right of way particularly reducing, restricting or impeding the right during and after construction.

 

Title adhesion

 

An adhesion of your titles is required because a portion of your development is across one or more title boundaries. Contact your solicitor or a registered land survey to initiate the process.

 

Council Reserves

 

All work carried out in close proximity to the Council reserves must be in accordance with the Council’s Parks, recreation and natural areas by ­laws http://www.hobartcity.com.au/Council/Legislation

 

You are subject to the Council’s Parks, recreation and natural areas by –laws in respect to any work carried out in close proximity to the Council reserve.

 

http://www.hobartcity.com.au/Council/Legislation

 

Weed control

 

Effective measures are detailed in the Tasmanian Washdown Guidelines for Weed and Disease Control: Machinery, Vehicles and Equipment (Edition 1, 2004). The guidelines can be obtained from the Department of Primary Industries, Parks, Water and Environment website at http://dpipwe.tas.gov.au/invasive­species/weeds/weed­hygiene/washdown­ guidelines

 

Work Place health and safety

 

Appropriate occupational health and safety (OH&S) measures must be employed during the works to minimise direct human exposure to potentially­ contaminated soil, water, dust and vapours.

 

http://www.worksafe.tas.gov.au/safety

 

Noise regulations

 

The following link provides information with respect to noise nuisances in residential areas.

 

http://www.hobartcity.com.au/Environment/Environmental_Health/Environmental

_Management_and_Pollution_Control

 

Waste disposal ­Top ten tips

 

http://www.hobartcity.com.au/Environment/Recycling_and_Waste

 

Fees and charges

http://www.hobartcity.com.au/Council/Fees_and_Charges

 

Dial before you dig

 

www.dialbeforeyoudig.com.au

 

If you do not have access to the Council’s electronic web page, please phone the Council (City Planning) on 62382715 for assistance.

 

Briscoe

Denison                                                   That the recommendation be adopted.

 

 

MOTION CARRIED

 

 

 

 

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

Ruzicka

Deputy Lord Mayor Christie

Reynolds

Zucco

Harvey

Briscoe

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Denison

 

 

 

 

9.5      23 Liverpool Crescent, West Hobart - Extension and Alterations - PLN-16-00567-01

            PLN-16-00567-01 - File Ref: F16/100633

Ref:    Open CPC 7.2.5, 12/9/2016

Application Expiry Date: 22 September 2016

Extension of Time: Not applicable

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for extension and alterations at 23 Liverpool Crescent, West Hobart for the reasons outlined in the officer’s report attached to item 7.2.5 of the Open City Planning Committee agenda of 12 September 2016, and a permit containing the following conditions be issued:

 

 

GEN

 

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­16­00567­01 ­ 23 Liverpool Crescent WEST HOBART ­ Final Planning Documents except where modified below.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

PLN s1

 

 

The dwelling is to be used as one private residential dwelling unit only. Any use of the property as separate dwelling units or for any other use other than private residential is not approved and would require a separate approval from Council.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

ENG 1

 

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

 

ENGR 1

 

 

The footings within the highway reservation must not undermine the stability and integrity of the highway reservation and its infrastructure.

 

Detailed design drawings, structural certificates of the footings within the Liverpool Crescent highway reservation must be submitted and approved, prior to the commencement of work and must:

 

 

·       Be prepared and certified by a suitable qualified person and experienced engineer;

·      Not undermine the stability of the highway reservation;

·      Take into account and reference accordingly any Geotechnical findings;

 

·      Detail any mitigation measures required;

 

·      Detail the design and location of the footing within the road reservation; and

 

·      The structure certificated and/or drawings should note accordingly the above.

 

 

All work required by this condition must be undertaken in accordance with the approved select design drawing and structural certificates.

 

 

Advice: Once the design drawing has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that the stability and integrity of the Council’s highway reservation is not compromised by the development.

 

 

ENV1

 

 

Sediment and erosion control measures sufficient to prevent sediment from leaving the site must be installed prior to any disturbance of the site. Sediment controls must be maintained until all areas of disturbance have been stabilized or re vegetated.

 

 

Advice: For further guidance in preparing a Soil and Water Management Plans (SWMP) in accordance with Fact sheet 3 Derwent Estuary Program go to www.hobartcity.com.au development engineering standards and guidelines.

 

 

Reason for condition

 

 

To avoid the sedimentation of roads, drains, natural watercourses, Council land that could be caused by erosion and runoff from the development, and to comply with relevant State Legislation.

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

 

Building permit in accordance with the Building Act 2000

 

 

http://www.hobartcity.com.au/Development/Building

 

 

Plumbing permit under the Tasmanian Plumbing Regulations 2014

 

 

http://www.hobartcity.com.au/Development/Plumbing

 

 

Work within the Highway Reservation

 

 

Occupational license for use of Hobart City Council highway reservation (as detailed in the development proposal plans), in accordance with conditions to be established by the Council.

 

 

http://www.hobartcity.com.au/Environment/Occupational_Licence

 

 

Permit to Temporarily Open Up and Occupy a Highway

 

 

Prior to the commencement of any works within the highway reservation the developer must apply for and obtain a Permit to Temporarily Open Up and Occupy a Highway (pursuant to Section 46 of the Local Government (Highways) Act 1982). Application form and advice regarding the permit requirements can be found on Council’s web site.

 

 

http://www.hobartcity.com.au/Transport/Lighting_Roads_Footpaths_and_Street_Clean ing/Roads_and_Footpaths

 

 

By­Laws

 

 

Please note development must be in accordance with the Hobart City Council’s Highways By ­law http://www.hobartcity.com.au/Council/Legislation

 

 

Briscoe

Thomas                                                    That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

9.6      29 Clutha Place, South Hobart - Dwelling and Works in Road Reservation

            PLN-16-00326-01 - File Ref: F16/101779

Ref:    Open CPC 7.2.6, 12/9/2016

Application Expiry Date: 7 October 2016

Extension of Time: Not applicable

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for a dwelling and works within road reserve at 29 Clutha Place and adjacent road reservation for the reasons outlined in the officer’s report attached to item 7.2.6 of the Open City Planning Committee agenda of 12 September 2016, and a permit containing the following conditions be issued:

 

 

GEN

 

 

The use and development must be substantially in accordance with the documents and drawings that comprise PLN­16­00326­01 ­29 Clutha Place ­ final planning documents except where modified below.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

 

PLN 1

 

 

Screening to a height of 1.2 metres above the level of the rear retaining wall and with no more than 25% transparency must be installed and maintained along the entire length of that retaining wall. The screening must be installed prior to first occupation of the dwelling.

 

 

Reason for condition

 

 

To provide reasonable opportunity for privacy for dwellings.

 

 

 

ENG sw6

 

 

All stormwater from the proposed development (including hardstand runoff) must be discharged to the Council’s stormwater infrastructure prior to first occupation.

 

 

All costs associated with works required by this condition are to be met by the owner.

 

 

Design drawings of the proposed stormwater drainage via gravity, and connections to Council infrastructure must be submitted and approved prior to the issuing of a building permit/consent under the Building Act 2000. The design drawing must be prepared by a suitably qualified person.

 

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

 

Advice: Once the design drawing has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that stormwater from the site will be discharged to a suitable Council approved outlet.

 

 

ENG 2

 

 

Vehicle crash barriers where required to satisfy the requirements of AS/NZS2890.1:2004 Section 2.4.5.3, compliant with the AS/NZS 1170.1:2002, must be installed prior to the first occupation.

 

 

A certified design/report prepared by a suitably qualified engineer, to satisfy the above requirements, must be provided to the Council prior to the issuing of any permit under the Building Act 2000.

 

 

All works, required by this condition must be undertaken in accordance with certified design/report. Upon completion the barriers must be inspected by a qualified engineer and a certification submitted to the Council, confirming that the installed barriers comply with the above requirement.

 

 

Reason for condition

 

 

To ensure that the safety of users of the driveway/parking and compliance with the standard.

 

 

ENG 4

 

 

The driveway and car parking area approved by this permit must be constructed to a sealed standard and surface drained prior to the first occupation.

 

 

Reason for condition

 

 

To ensure safe access is provided for the use.

 

ENG 3

 

 

The driveway, access and manoeuvring area, must be constructed in accordance with certified driveway design drawings, prior to the first occupation.

 

 

The driveway, access and manoeuvring area, design must be submitted to the Council, prior to the issuing of any permit under the Building Act 2000.

 

 

The driveway, access and manoeuvring area, design must:

 

 

·    Be prepared and certified by a suitably qualified engineer that the design is in accordance with the Australian standards AS/NZS;

·    2890.1:2004 or that the design provides for a safe and efficient access. The gradient of any turning areas must not exceed 10%, and the gradient of any driveway area must not exceed 25%.

 

 

Upon completion of the driveway, access and manoeuvring area, documents signed by a suitably qualified engineer, certifying the driveway has been constructed in accordance with the certified design drawings must be lodged with the Council.

 

 

Reason for condition

 

 

To ensure that the safety of users of the driveway/parking.

 

 

ENG 14

 

 

Parking areas must be generally designed and constructed in accordance with the Australian Standard Parking facilities, Part 1: Off­Street Carparking, AS/NZS 2890.1:2004, prior to the first occupation.

 

Design drawings must be submitted and approved, prior to commencement of work. The amended design drawing must:

 

 

·    Show dimensions, levels and gradients, and other details as necessary to satisfy the above requirement;

·    The gradient of any parking areas must not exceed 5%;

 

·    The minimum width for a single garage door is 2.4m, and a double garage door is 4.8m.

 

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

 

Advice: Once the design drawing has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that the access and parking layout for the development is to accepted standards.

 

 

ENG 1

 

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council.

 

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

 

ENV 2

 

 

Sediment and erosion control measures, in accordance with an approved soil and water management plan (SWMP) must be installed, prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.

 

 

A SWMP must be submitted and approved, prior to the commencement of work. The SWMP must:

 

 

a.               be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008). http://www.hobartcity.com.au/Development/Engineering_Standards_and_Gui deline

All work required by this condition must be undertaken in accordance with the approved SWMP.

 

 

Advice: Once the SWMP has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.

 

 

OPS s1

 

 

The black peppermint (Eucalyptus amygdalina) located within the Council’s road reserve as shown on Drawing No: ALLE­M­03 must be retained and not damaged during construction.

 

 

Construction of the new retaining wall specified on Drawing No: ALLE­M­03 directly adjacent to the tree must be in accordance with the following:

·    The footings of the wall located within the tree’s drip line and structural root zone must be excavated by hand;

·    Piers and beams must be used to support the retaining wall around the roots;

·    Tree roots must not be severed or damaged.

 

 

Construction plans demonstrating compliance with this condition to the satisfaction of the Council's Director Parks and City Amenity and Director City Infrastructure must be submitted and approved prior to issue of any building permit.

 

 

All work required by this condition must be undertaken in accordance with the approved construction plans.

 

 

Advice: Once the construction plans have been approved, the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To protect and retain the black peppermint located in the Council's road reserve for its aesthetic and biodiversity values.

 

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

 

CONDITION ENDORSEMENT

 

 

As a condition endorsement is required by a planning condition above, please forward documentation required to satisfy the condition to rfi­information@hobartcity.com.au , clearly identifying the planning permit number, address and the condition to which the documentation relates.

 

 

Once approved, the Council will respond to you via email that the condition/s has been endorsed (satisfied). Detailed instructions can be found at: www.hobartcity.com.au/Development/Planning/How_to_obtain_a_condition_endorse ment

 

 

BUILDING PERMIT

 

 

Building permit in accordance with the Building Act 2000; http://www.hobartcity.com.au/Development/Building  PLUMBING PERMIT

Plumbing permit under the Tasmanian Plumbing Regulations 2014;

 

 

http://www.hobartcity.com.au/Development/Plumbing

 

 

TASWATER

 

 

Taswater in its response TWDA 2016/00656­HCC dated 18/5/2016, states no objection to the proposal and imposes no conditions.

 

Briscoe

Thomas                                                    That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

 

9.7      21 Colville Street, Battery Point - Alterations

            PLN-16-703 - File Ref: F16/103036

Ref:    Open CPC 7.2.8, 12/9/2016

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for alterations at 21 Colville Street, Battery Point for the reasons outlined in the officer’s report attached to item 7.2.8 of the Open City Planning Committee agenda of 12 September 2016 and a permit containing the following conditions be issued:

 

 

GEN

 

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­16­703 21 COLVILLE STREET BATTERY POINT TAS 7004 ­ Final Planning Documents except where modified below.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

 

THC

 

 

The use and/or development must comply with the requirements of the Tasmanian Heritage Council as detailed in the Notice of Heritage Decision, Works Application No. 5058 dated 28 July 2016, as attached to the permit.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

 

HER s2

 

 

 

Prior to commencement of works, submit and have approved details of the type, size and colour of the slate to be used for the re­roofing, as well as details of fixings, all flashings, batten replacement and storage of original slates.

 

 

All work required by this condition must be undertaken in accordance with the approved details.

 

Advice: The details may be in the form of a quotation from a suitably qualified roof slater. Once the details have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

For the purposes of this condition the date of this permit is 19 September 2016.

 

 

Reason for condition

 

 

To ensure that development is done is a sympathetic manner and does not result in the loss of historic cultural heritage significance through the use of incompatible materials.

 

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

 

CONDITION ENDORSEMENT

 

 

As a condition endorsement is required by a planning condition above, please forward documentation required to satisfy the condition to rfi­information@hobartcity.com.au, clearly identifying the planning permit number, address and the condition to which the documentation relates.

 

 

Once approved, the Council will respond to you via email that the condition(s) has been endorsed (satisfied). Detailed instructions can be found at: www.hobartcity.com.au/Development/Planning/How_to_obtain_a_condition_endors ement

 

 

BUILDING PERMIT

 

 

Building permit in accordance with the Building Act 2000; http://www.hobartcity.com.au/Development/Building
PLUMBING PERMIT

Plumbing permit under the Tasmanian Plumbing Regulations 2014;

 

 

http://www.hobartcity.com.au/Development/Plumbing

 

 

Briscoe

Burnet                                                    That the recommendation be adopted.

 

 

Amendment

 

Ruzicka

Zucco                                                                                                                

 

That the words For the purposes of this condition the date of this permit is 19 September 2016 be deleted from Clause HER s2.

 

 

AMENDMENT CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Amendment

 

Cocker

Reynolds                                                                                                                  

 

That the applicant be provided a period of five years in order to meet condition HER s2 with regard to the slate roof.

 

 

AMENDMENT LOST

VOTING RECORD

AYES

NOES

Cocker

Lord Mayor Hickey

Reynolds

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Thomas

 

Denison

 

Harvey

 

 

 

SUBSTANTIVE MOTION CARRIED

 

 

 

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

COUNCIL RESOLUTION:

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for alterations at 21 Colville Street, Battery Point for the reasons outlined in the officer’s report attached to item 7.2.8 of the Open City Planning Committee agenda of 12 September 2016 and a permit containing the following conditions be issued:

 

 

GEN

 

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise PLN­16­703 21 COLVILLE STREET BATTERY POINT TAS 7004 ­ Final Planning Documents except where modified below.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

 

THC

 

 

The use and/or development must comply with the requirements of the Tasmanian Heritage Council as detailed in the Notice of Heritage Decision, Works Application No. 5058 dated 28 July 2016, as attached to the permit.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

 

HER s2

 

 

 

Prior to commencement of works, submit and have approved details of the type, size and colour of the slate to be used for the re­roofing, as well as details of fixings, all flashings, batten replacement and storage of original slates.

 

 

All work required by this condition must be undertaken in accordance with the approved details.

 

Advice: The details may be in the form of a quotation from a suitably qualified roof slater. Once the details have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that development is done is a sympathetic manner and does not result in the loss of historic cultural heritage significance through the use of incompatible materials.

 

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council.

 

 

CONDITION ENDORSEMENT

 

 

As a condition endorsement is required by a planning condition above, please forward documentation required to satisfy the condition to rfi­information@hobartcity.com.au, clearly identifying the planning permit number, address and the condition to which the documentation relates.

 

 

Once approved, the Council will respond to you via email that the condition(s) has been endorsed (satisfied). Detailed instructions can be found at: www.hobartcity.com.au/Development/Planning/How_to_obtain_a_condition_endors ement

 

 

BUILDING PERMIT

 

 

Building permit in accordance with the Building Act 2000; http://www.hobartcity.com.au/Development/Building
PLUMBING PERMIT

Plumbing permit under the Tasmanian Plumbing Regulations 2014;

 

 

http://www.hobartcity.com.au/Development/Plumbing

 

 

 

 

 

Burnet

Ruzicka                                                                                                                      

 

That item 9.3 be taken next.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Item 9.3 was then taken.

 

9.8      12a Bellevue Parade, New Town - Six Additional Dwellings, Partial Demolition and Alterations to Existing Dwelling, Stormwater Infrastructure, Parking and Access

            PLN-16-00621-01 - File Ref: F16/103012

Ref:    Open CPC 7.2.7, 12/9/2016

Application Expiry Date: 8 October 2016

Extension of Time: Not applicable

 

That pursuant to the Hobart Interim Planning Scheme 2015, the Council approve the application for six additional dwellings, partial demolition and alterations to existing dwelling, stormwater infrastructure, parking and access at 12a Bellevue Parade for the reasons outlined in the officer’s report attached to item 7.2.7 of the Open City Planning Committee agenda of 12 September 2016 and a permit containing the following conditions be issued:

 

 

GEN

 

 

The use and/or development must be substantially in accordance with the documents and drawings that comprise 12a Bellevue Parade ­ NEW TOWN ­12A Bellevue Parade ­ Final Planning Documents except where modified below.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

TW

 

 

The use and/or development must comply with the requirements of TasWater as detailed in the form Submission to Planning Authority Notice, Reference No. TWDA 2016/00808­HCC dated 15 June 2016 as attached to the permit.

 

 

Reason for condition

 

 

To clarify the scope of the permit.

 

 

PLN 1

 

 

Design drawings must be submitted and approved prior to the issuing of any building permit under the Building Act 2000.

 

 

The design drawings must show the edge of all driveways and car parking spaces on the lot to be either a horizontal distance from habitable windows of dwellings (excluding a parking space allocated to that dwelling) of 2.5m or 1m if permanent screening to a height of at least 1.7m is installed and maintained. Alternatively for the 1m setback, the window, or glazed door, to a habitable room may be shown with a sill height of at least 1.7m above the shared driveway or parking space, or with fixed obscure glazing extending to a height of at least 1.7 m above the floor level.

 

All work required by this condition must be undertaken in accordance with the approved design drawings prior to use of the dwellings commencing.

 

 

Reason for condition

 

 

To provide reasonable opportunity for privacy for dwellings.

 

 

PLN 13

 

 

Prior to the issue of any consent under the Building Act 2000, appropriate documentation must be submitted and approved to demonstrate that all dwellings will achieve the following:

 

 

1.    Internal noise levels: maximum 35dBa; and

2.    External noise levels in areas of private open space: maximum

45dBa.

 

 

The noise levels are to be determined based on the projected traffic flow on the Brooker Highway and Domain slip road for 2026 (which forms part of the Final Planning Documents).

 

 

All work required by this condition must be undertaken and maintained in accordance with the approved documentation.

 

 

Advice: Once the documentation has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that development adjacent to category 1 road is located to minimise adverse effects of noise, vibration, light and air emissions from roads to the sensitive use.

 

 

ENG sw4

 

 

The development, including driveway, must be drained to Council infrastructure. Any new stormwater connection required must be constructed, and existing redundant connections must be sealed, by Council at the owner’s expense prior to issue of a Certificate of Completion.

 

 

Detailed engineering drawings must be submitted and approved prior to issue of any consent under the Building Act 2000. The detailed engineering drawings must include:

 

a)      the location of the proposed connection and all existing connections; and

b)      the size of the connection appropriate to satisfy the needs of the development; and

c)      long­sections of the proposed connection clearly showing any nearby services, cover, size, material and delineation of public and private infrastructure.

 

 

All work required by this condition must be undertaken in accordance with the approved engineer drawings.

 

 

Advice: Once the engineered drawing has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement). Council notes care must be taken to ensure all works (including ag drains for retaining walls) are within the property boundaries.

 

 

Please note that once the condition endorsement has been issued you will need to contact Council’s City Infrastructure Division to initiate an application for service connection.

 

 

Reason for condition

 

 

To ensure the site is drained adequately.

 

 

ENG sw7

 

 

Stormwater pre­ treatment and detention for stormwater discharges from the development must be installed prior to issue of a Certificate of Completion.

 

 

A stormwater management report and design must be submitted and approved, prior to issue of any consent under the Building Act 2000. The stormwater management report and design must:

 

 

a)        be prepared by a suitably qualified engineer;

b)        include detailed design of the proposed treatment train, including final estimations of contaminant removal;

c)        include detailed design and supporting calculations of the detention tank, sized such that there is no increase in flows from the developed site up to 5% AEP storm events and such that flows are limited to the receiving capacity of the kerb and gutter. All assumptions must be clearly stated;

d)        include design drawings of the detention tank (including longsection) showing waterproofing, layout, and the inlet, outlet and overflow mechanism; and

e)        include a Stormwater Management Summary Plan that outlines the obligations for future property owners to stormwater management, including a maintenance plan which outlines the operational and maintenance measures to check and ensure the ongoing effective operation of all systems, such as: inspection frequency; cleanout procedures; descriptions and diagrams of how the installed systems operate; details of the life of assets and replacement requirements.

 

 

All work required by this condition must be undertaken and maintained in accordance with the approved Stormwater Management Report.

 

 

Advice: Once the stormwater management report and design has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To avoid the possible pollution of drainage systems and natural watercourses, to ensure the development’s stormwater system takes into account limited receiving capacity of Council’s infrastructure, and to comply with relevant State legislation.

 

 

ENG 4

 

 

The driveway and car parking areas approved by this permit must be constructed to a sealed standard and surface drained prior to the first occupation.

 

 

Reason for condition

 

 

To ensure safe access is provided for the use.

 

 

ENG 8

 

 

All visitor car parking spaces must be delineated by means of signpost, white or yellow lines 80mm to 100mm wide, or white or yellow pavements markers in accordance to Australian/NZS Standard, Parking facilities Part 1: Off­street car parking AS/NZS 2890.1, prior to the commencement of the use.

 

 

Reason for condition

 

In the interests of vehicle user safety and the amenity of the development.

 

 

ENG 11

 

The proposed crossover within the Bellevue Parade highway reservation must be designed and constructed in accordance with:

 

       Urban ­ TSD­R09­v1 Urban Roads Driveways and TSD R14­v1 Type KC vehicular crossing;

       Footpath ­ Urban Roads Footpath TSD­R11­v1;

prior to the commencement of the use (see advice).

Reason for condition

 

In the interests of vehicle user safety and the amenity of the development.

 

 

ENG 3

 

 

The driveway, car parking and manoeuvring areas, must be constructed in accordance with certified driveway design drawings, prior to the first occupation.

 

 

The driveway car parking and manoeuvring areas, design must be submitted to the Council, prior to the issuing of any permit under the Building Act 2000.

 

 

The driveway car parking and manoeuvring areas, design must be prepared and certified by a suitably qualified engineer that the design is in accordance with the Australian standards AS/NZS 2890.1 or that the design provides for a safe and efficient access.

 

 

Upon completion of the driveway car parking and manoeuvring areas, documents signed by a suitably qualified engineer, certifying the driveway has been constructed in accordance with the certified design drawings must be lodged with the Council.

 

 

Reason for condition

 

 

To ensure that the safety of users of the driveway/parking.

 

 

ENG 14

 

 

Parking, access and turning areas must be designed and constructed in accordance with the Australian Standard Parking facilities, Part 1: Off­Street Carparking, AS 2890.1 2004, prior to the first occupation.

 

 

Design drawings must be submitted and approved, prior to commencement of work. The amended design drawing must show dimensions, levels and gradients, transitions and other details as necessary to satisfy the above requirement.

 

 

All work required by this condition must be undertaken in accordance with the approved design drawings.

 

 

Advice: Once the design drawing has been approved Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that the access and parking layout for the development is to accepted standards.

 

 

ENG 1

 

 

The cost of repair of any damage to the Council infrastructure resulting from the implementation of this permit, must be met by the owners within 30 days of the completion of the development or as otherwise determined by the Council. Any damage must be reported immediately to Council.

 

 

A photographic record of the Council infrastructure adjacent to the subject site must be provided to the Council prior to any commencement of works.

 

 

A photographic record of the Council’s infrastructure (e.g. existing property service connection points, roads, buildings, stormwater, footpaths, driveway crossovers and nature strips, including if any, pre existing damage) will be relied upon to establish the extent of damage caused to the Council’s infrastructure during construction. In the event that the owner/developer fails to provide to the Council a photographic record of the Council’s infrastructure, then any damage to the Council infrastructure found on completion of works will be deemed to be the responsibility of the owner.

 

 

Reason for condition

 

 

To ensure that any of the Council infrastructure and/or site­related service connections affected by the proposal will be altered and/or reinstated at the owner’s full cost.

 

 

ENG s2

 

 

Provide on­site turning such that all vehicles can leave the site in a forward direction, prior to the first occupation.

 

Design drawings demonstrating compliance with this condition must be submitted to and approved by Council, prior to the issuing of any permit under the Building Act 2000.

 

 

All work required by this condition must be undertaken in accordance with the approved drawings.

 

 

Advice: Once the drawings have been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To ensure that the safety of users of the driveway/parking and adjoining Highway

Reservation, and compliance with the standard.

 

 

ENV 2

 

 

Sediment and erosion control measures sufficient to prevent sediment from leaving the site and in accordance with an approved soil and water management plan (SWMP), must be installed prior to the commencement of work and maintained until such time as all disturbed areas have been stabilised and/or restored or sealed to the Council’s satisfaction.

 

 

A SWMP must be submitted and approved, prior to the commencement of work. The SWMP must be prepared in accordance with the Soil and Water Management on Building and Construction Sites fact sheets (Derwent Estuary Program, 2008). http://www.hobartcity.com.au/Development/Engineering_Standards_and_Gui deline.

 

 

All work required by this condition must be undertaken in accordance with the approved SWMP.

 

 

Advice: Once the soil and SWMP has been approved the Council will issue a condition endorsement (see general advice on how to obtain condition endorsement).

 

 

Reason for condition

 

 

To avoid the pollution and sedimentation of roads, drains and natural watercourses that could be caused by erosion and runoff from the development.

 

ADVICE

 

 

The following advice is provided to you to assist in the implementation of the planning permit that has been issued subject to the conditions above. The advice is not exhaustive and you must inform yourself of any other legislation, by­laws, regulations, codes or standards that will apply to your development under which you may need to obtain an approval. Visit www.hobartcity.com.au for further information.

 

 

Prior to any commencement of work on the site or commencement of use the following additional permits/approval may be required from the Hobart City Council:

 

 

CONDITION ENDORSEMENT

 

 

As a condition endorsement is required by a planning condition above, please forward documentation required to satisfy the condition to rfi­information@hobartcity.com.au, clearly identifying the planning permit number, address and the condition to which the documentation relates.

 

 

Once approved, the Council will respond to you via email that the condition/s has been endorsed (satisfied). Detailed instructions can be found at www.hobartcity.com.au/Development/Planning/How_to_obtain_a_condition_endorse ment

 

 

BUILDING PERMIT

 

 

Building permit in accordance with the Building Act 2000; http://www.hobartcity.com.au/Development/Building
PLUMBING PERMIT

Plumbing permit under the Tasmanian Plumbing Regulations 2014;

 

 

http://www.hobartcity.com.au/Development/Plumbing

 

 

ROAD CLOSURE

Road closure permits for construction. http://www.hobartcity.com.au/Transport/Permits/Application_Forms_­

_Construction_Activities_Special_Events_in_the_Road_Reservation

 

 

PERMIT TO OCCUPY HIGHWAY

 

Permit for the occupation of the public highway for construction ( e.g. placement of crane, pump truck etc).

 

 

http://www.hobartcity.com.au/Transport/Permits/Construction_Activities_Special_Even ts_in_the_Road_Reservation

 

 

TEMPORARY PARKING PERMITS

 

 

Temporary parking permits for construction vehicles i.e. residential or meter parking/loading zones.

 

 

http://www.hobartcity.com.au/Transport/Permits/Parking_Permits

 

 

STORMWATER

 

 

Please note that in addition to a building and/or plumbing permit, development must be in accordance with the Hobart City Council’s Hydraulic Services By law.

 

 

http://www.hobartcity.com.au/Council/Legislation

 

 

WORK WITHIN A HIGHWAY RESERVATION

 

 

Please note development must be in accordance with the Hobart City Council’s

Highways By ­law. http://www.hobartcity.com.au/Council/Legislation DRIVEWAY SURFACING OVER PUBLIC HIGHWAY

If a coloured or textured surface is used for the driveway access within the Highway Reservation, the Council or other service provider will not match this on any reinstatement of the driveway access within the Highway Reservation required in the future.

 

 

ACCESS

 

 

Designed in accordance with LGAT­ IPWEA Tasmanian standard drawings. http://www.hobartcity.com.au/Development/Engineering_Standards_and_Guidelines
CROSSOVER CONSTRUCTION

The construction of the crossover can be undertaken by the Council or by a private contractor, subject to Council approval of the design.

 

 

http://www.hobartcity.com.au/Transport/Lighting_Roads_Footpaths_and_Street_Clean ing/Roads_and_Footpaths

 

 

STORMWATER/ROADS/ACCESS

 

 

Services to be designed and constructed in accordance with the (IPWEA) LGAT­

standard drawings. http://www.hobartcity.com.au/Development/Engineering_Standards_and_Guidelines
WASTE DISPOSAL

http://www.hobartcity.com.au/Environment/Recycling_and_Waste

FEES AND CHARGES

 

 

http://www.hobartcity.com.au/Council/Fees_and_Charges

 

 

DIAL BEFORE YOU DIG

 

 

www.dialbeforeyoudig.com.au

 

 

If you do not have access to the Council’s electronic web page, please phone the Council (City Planning) on 62382715 for assistance.

 

 

 

Briscoe

Denison                                                   That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Governance Committee

 

10.      2015-2016 Annual Plan - Final Report
Period Ended 30 June 2016

            File Ref: F16/90144; 21-1-1

Ref:    Open GC 6.1, 6/9/2016

 

That:     1.      The Council endorse the Annual Plan Final Report for the period ended 30 June 2016, marked as Attachment A to the report, for inclusion in the City of Hobart 2015-2016 Annual Report.

2.      That the Annual Plan Final Plan be amended to include reference to the commencement of work in respect to traffic management.

 

 

Ruzicka

Harvey                                                    That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

11.      Council Committees Review and Governance Matters

            File Ref: F16/100796

Ref:    Open GC 6.2, 6/9/2016

 

That:   1.      The Council confirm its governance, strategic and policy focus in respect to business matters submitted for committee and Council determination.

 

2.      With the exception of the City Planning Committee, the Council’s existing committees be disbanded at the appropriate time, within the next six months.

 

3.      In lieu of the disbanded committees, the Council utilise the following strategic priority areas listed in its Strategic Plan as the basis for the reporting structure for business requiring consideration at committee or Council level:

 

3.1.     Economic Development, Vibrancy and Culture;

3.2.     Urban Management;

3.3.     Environment and Natural Resources;

3.4.     Strong, Safe and Healthy Communities; and

3.5.      Governance

 

4.      All Aldermen be members of each of the newly established committees, noting that a quorum will be seven.

 

5.      In recognition of the specific Planning Authority role of the City Planning Committee, it remain in place with modified Terms of Reference, with the Council to determine the composition and Chairman.

 

6.      Terms of Reference be drafted for the newly established committees which:

 

6.1. Emphasise the governance, strategic and policy focus for committees and Council going forward; and

 

6.2. Maximise opportunities for increased delegations to committees in light of their membership comprising all Aldermen.

 

7.      The Council adopt the monthly Council and committee meeting framework, marked as Attachment A to this agenda, which involves the dedication of Mondays alternately as Committee and Council meeting days.

 

(i)    The Council consider allocating two dedicated workshop opportunities per month and resolve a preferred time and day of the week for this to occur.

 

8.      The two scheduled committee days per month be known as Committee of the Whole with the chairmanship to be rotated among interested Aldermen.

 

9.      For each of the five Strategic Priority Areas, the Council consider appointing a Leader and Co-Leader to facilitate items at Committee of the Whole meetings, including deputations, and to introduce items at the Council meeting.

 

10.    The commencement time for Council, City Planning and Committee of the Whole meetings remain at 5.00 pm.

 

11.    The City Planning Committee continue to meet twice per month in order to meet its statutory planning authority obligations.

 

11.1    The allocated meeting day for the City Planning Committee move from Monday to Tuesday.

 

11.2    The City Planning Committee consider further variations to its delegations where applications are low impact or straight forward.

 

12.    The format for Aldermanic Notices of Motions be varied to include a brief report from the General Manager or his delegate which addresses the status of any action taken, the requirement for a report including anticipated timing and any related resourcing matters relating to its preparation, together with any other information relevant to consideration of the matter by the committee and Council.

 

12.1    The notification period for the lodgement of Notices of Motions be varied from seven to ten clear days to provide sufficient time for the preparation of the report. 

 

13.    The Public Question Time procedures be varied to allow questions from the floor as part of the Public Question Time forum at ordinary Council meetings.

 

14.    That the policy provisions around deputations be deferred for further consideration after the implementation of the revised committee structure.

 

15.    That the Council committee structure, once determined by Council, be reviewed after three months of operation.

 

Ruzicka

Reynolds                                               That the recommendation be adopted.

 

 

 

Zucco

DEPUTY LORD MAYOR                                                                                            

 

That Alderman Ruzicka be provided a two minute extension of time in order to introduce the item.

 

 

MOTION CARRIED

 

 

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Zucco

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Amendment

 

Zucco

deputy lord mayor                                                                                            

 

That:   1.      Clauses 1, 2, 5, 6, 7(i), 10, 11, 12, 14 and 15 of the recommendation be adopted.

 

2.      The following committee structure be adopted:

(i)      City Planning;

(ii)     Economic Development and Communications and Community, Culture and Events;

(iii)    Governance and Finance;

(iv)    Parks and Recreation; and

(v)     City Infrastructure.

 

3.      Workshops be scheduled on Wednesdays and Thursdays commencing at 5.00 pm.

 

4.      A further report be provided to the Governance Committee in respect to this matter, within a six month period.

 

 

 

Procedural Motion

 

Cocker

Burnet                                                                                                                       

 

That the matter be deferred for further consideration.

 

 

PROCEDURAL MOTION CARRIED

VOTING RECORD

AYES

NOES

Briscoe

Lord Mayor Hickey

Sexton

Deputy Lord Mayor Christie

Burnet

Ruzicka

Cocker

Reynolds

Thomas

Harvey

Denison

 

 

 

 

 

COUNCIL RESOLUTION:

 

 

That the matter be deferred for further consideration.

 

 

Community, Culture and Events Committee

 

12.      Taste of Tasmania 2016-17 - Transactional Model

            File Ref: F16/100785;  S13-046-01/39

Ref:    Special Open CCEC 4.1, 19/9/2016

 

 

Sexton

DEPUTY LORD MAYOR         That the matter be withdrawn from the agenda.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

 

 

13.      12 Month Evaluation - City of Hobart Mobile Food Vendor Program Trial

            File Ref: F16/100576;  S17-010-19/04

Ref:    Special Open CCEC 4.2, 19/9/2016

 

 

Sexton

deputy lord mayor         That the matter be withdrawn from the agenda.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

14.      Petition - 'No Business in Abuse' Pledge

            File Ref: F16/107127; 35-5-12; 15-1-2

Ref:    Special Open CCEC 4.3, 19/9/2016

 

That:   1.       The Council provide in principle approval to endorse the ‘No Business in Abuse’ pledge and take steps to ensure that the Council does not engage in business relationships with Broadspectrum or Wilson Security.

2.      A further report be provided to address the implementation of the pledge as it relates to the Council’s procurement practices, including broadening the scope of Council’s existing ethical purchasing principle as outlined in the Hobart City Council Code for Tenders and Contracts.

 

 

Sexton

Harvey                                                    That the recommendation be adopted.

 

 

MOTION CARRIED

 

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Finance Committee

 

15.      Adoption of Guarantee of Loans Policy

            File Ref: F16/100663

Ref:    Open FC 6.1, 13/9/2016

 

That    1.    The Council approve the draft policy titled Guarantee of Loans marked as Attachment A to item 6.1 of the Open Finance Committee agenda of 13 September 2016.

2.    The provisions within the policy not apply retrospectively.

 

 

Thomas

DEPUTY LORD MAYOR                         That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

16.      Financial Impact and Risk of Direct Investment in Property and Investment in Home Grown Rural and Community Financial Institutions

            File Ref: F16/83512

Ref:    Open FC 6.2, 13/9/2016

 

That:   1.    The Council reaffirm its decision to proceed with a detailed external review of its investment approach.

2.    The Council’s approach to ethical investments and borrowings, and in particular the matters raised in the petition presented to the Council at its meeting of 9 May 2016, form part of that review. 

 

 

Thomas

Cocker                                                    That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Parks and Recreation Committee

 

17.      416 Churchill Avenue, Sandy Bay - Request for Easement - TasNetworks

            File Ref: F16/97276; 1825899

Ref:    Open PRC 6.1, 8/9/2016

 

That:   1.    The Council approve the creation of an easement over its land at 416 Churchill Avenue, Sandy Bay, in favour of TasNetworks.

(i)      The approval be conditional upon the easement being substantially in accordance with TasNetworks ‘Proposed Mains Plan AS-25661’ and ‘Site and Locality Plan AS-25634’, marked as Attachments B & C to item 6.1 of the Open Parks and Recreation Committee agenda of 8 September 2016.

2.    The General Manager be authorised to negotiate the terms and conditions of the easement and the potential transfer of TasNetworks land, known as 416A Churchill Avenue, Sandy Bay (CT 37513/1), to the City.

3.    TasNetworks be required to undertake all works, documentation and complete the easement registration at its own cost.

 

Reynolds

Briscoe                                                   That the recommendation be adopted.

 

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

  

Special Report – General Manager

 

18.      Climate Change Roundtable and Nomination for Carbon Disclosure Project (CDP) Report and Climate and Energy Workshop 11 - 12 October 2016

            File Ref: F16/107035; 17-50-23

 

 

Briscoe

Burnet                                                                                                                       

 

That the matter be withdrawn from the agenda and dealt with at item 20 on the agenda.

 

 

MOTION CARRIED

 

 

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

  

Supplementary item 20 was then taken.

19.     Closed Portion of the Meeting

 

The following items were discussed:-

 

Item No. 1          Minutes of the last meeting of the Closed Portion of the Council Meeting

Item No. 2          Communication from the Chairman

Item No. 3          Leave of Absence

Item No. 4          Consideration of supplementary Items to the agenda

Item No. 5          Indications of pecuniary and conflicts of interest 

Item No. 6          South Hobart Living Arts Centre Ltd - Board Chairman

LG(MP)R 15(2)(g)

Item No. 7          Farm Gate Market Review - Request for a New Lease

LG(MP)R 15(2)(g)

Item No. 8          Request for Damages - Residents of 98 Giblin Street, Lenah Valley

LG(MP)R 15(2)(i)

Item No. 9          Battery Point Slipyards Lot 1 Napolean Street

LG(MP)R 15(2)(c)(ii)

Item No. 10        Future of Hobart Council Centre

LG(MP)R 15(2)(c)(ii) and  (f)

Item No. 11        Sandy Bay Retail Precinct Upgrade - Lease of Property

LG(MP)R 15(2)(f)

Item No. 12        Farm Gate Market Review - Request for a New Lease

LG(MP)R 15(2)(g)

Item No. 13        Disposal of Traction Engines

LG(MP)R 15(2)(c)(i)

Item No. 14        The Springs, Kunanyi / Mount Wellington - Visitor Services Options

LG(MP)R 15(2)(b) 

 

 

deputy lord mayor

Ruzicka                                                                            That the items be noted.

 

MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

 

 

Supplementary Item

 

 

20.      Climate Change Roundtable and Nomination for Carbon Disclosure Project (CDP) Report and Climate and Energy Workshop 11 - 12 October 2016

            File Ref: F16/108014; 17-50-23

Ref:    Special Open CPC 2.1, 19/9/2016

 

That:   1.      The Council nominate Alderman Harvey for the ongoing Climate Change Roundtable discussions;

2.      The Council formally offer to host a future Climate Change Roundtable meeting; and

3.      Alderman Harvey be nominated to attend the Compact of Mayors Asia Pacific launch of the 2016 Carbon Disclosure Project (CDP) Cities Report and Climate and Energy workshop, to be held in Bangkok, Thailand on 11 to 12 October 2016, noting that the associated travel, accommodation and meal costs are covered by the Carbon Disclosure Project (CDP).

 

 

Briscoe

Burnet                                                   That the recommendation be adopted .

 

 

Amendment

 

Thomas

Denison                                                                                                                      

 

That:   1.      Nominations be called for one Alderman to attend the event outlined at Clause 3 of the recommendation.

 

2.      A secret ballot be conducted should there be multiple nominations.

 

 

AMENDMENT CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

The Lord Mayor then invited nominations.

 

Aldermen Cocker, Reynolds and Harvey were nominated.  A secret ballot was then conducted.

 

The Lord Mayor declared Alderman Harvey as the successful nominee.

 

SUBSTANTIVE MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

 

Deputy Lord Mayor Christie

 

Briscoe

 

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

Harvey

 

 

The following matter was considered in the Closed portion of the meeting.    The Council resolved to record its decision in the minutes of the Open portion of the Council meeting.

 

21.      Future of Hobart Council Centre

            File Ref: F16/100959; 10-2-14

Ref:    Closed FC 4.3, 13/9/2016

LG(MP)R 15(2)(c)(ii) -   commercial information of a confidential nature that, if disclosed, is likely to confer a commercial advantage on a competitor of the council

LG(MP)R 15(2)(f) -       proposals for the council to acquire land or an interest in land or for the disposal of land

 

That    1.    The Council not dispose of the Hobart Council Centre at this time.

 

2.    A further report be provided which considers additional uses for the building, such as mixed use, strata title and possible Council development opportunities.

 

3.    The General Manager research other models where Councils have undertaken commercial developments, where there are similarities to the models being considered by the City of Hobart for the Hobart Council Centre.

 

(ii)        If suitable buildings are indentified, a delegation be approved to travel to the respective Council areas to investigate whether these developments would be suitable options for the Hobart Council Centre.

 

 

Thomas

Ruzicka                                                   That the recommendation be adopted.

 

 

Amendment

 

Burnet

Cocker

 

That the motion be recorded in the minutes of the open portion of the meeting.

 

 

MOTION CARRIED

 

 

 

 

 

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

Ruzicka

Deputy Lord Mayor Christie

Harvey

Briscoe

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Denison

 

 

 

 

SUBSTANTIVE MOTION CARRIED

VOTING RECORD

AYES

NOES

Lord Mayor Hickey

Deputy Lord Mayor Christie

Briscoe

Denison

Ruzicka

 

Sexton

 

Burnet

 

Cocker

 

Thomas

 

Reynolds

 

Harvey

 

 

 

 

COUNCIL RESOLUTION:

 

That    1.    The Council not dispose of the Hobart Council Centre at this time.

 

2.    A further report be provided which considers additional uses for the building, such as mixed use, strata title and possible Council development opportunities.

 

3.    The General Manager research other models where Councils have undertaken commercial developments, where there are similarities to the models being considered by the City of Hobart for the Hobart Council Centre.

 

(ii)        If suitable buildings are indentified, a delegation be approved to travel to the respective Council areas to investigate whether these developments would be suitable options for the Hobart Council Centre.

 

4.   The Council’s resolution be recorded in the minutes of the Open Portion of the Council meeting.

 

 

 

The Chairman adjourned the meeting at 7.21 pm for a comfort break.

 

The meeting was reconvened at 7.30 pm.

  

The Chairman adjourned the meeting at 8.00 pm to conduct the closed portion of the meeting.

 

The meeting was reconvened at 9.35 pm.

 

Item 19 was then taken.

 

There being no further business the meeting closed at 9.36 pm.

 

 

 

 

 

TAKEN AS READ AND SIGNED AS A CORRECT RECORD THIS
10th DAY OF october 2016.

CHAIRMAN